Risk assessments and method statements

RAMS written, approved,
briefed and signed.

Unibuild is RAMS software for UK trades and specialist contractors. It carries each one from the first draft, through an AI review, to the operative’s signature at the gate, with approvals and versions kept together.

Steel fixers working in a deep excavation, the kind of activity a method statement is written for
What we offer

Every RAMS, from first draft to signed record.

Written and approved in the office, briefed and signed on site, with every version and signature on record. Your competent person makes the safety decisions.

In the office

Write

Start from your own templates or around forty by trade, or describe the job and let the AI build it. Job details fill in.

Check

The AI review flags vague controls and missing detail before a RAMS goes out, your subcontractors’ included.

Approve

Approved or returned with comments in one place. Every edit becomes a new version.

On site

Brief

The right RAMS on each operative’s phone at clock-in, in their own language, key controls first.

Sign

Signed on the phone, or by email link for agency and subcontract workers, with name, date and time.

Reassess

When conditions change, the supervisor records a dynamic risk assessment on the phone, against the same job.

RAMS 2431-07

Elmfield · Job 2431 · Version 3

Sub-mains and distribution boards, level 2

Approved · Electricians

In short

Two of you run the sub-main cables up the riser and fit the new boards on level 2. The boards stay dead until the electrical supervisor switches them on.

Hazards

  • Electric shock from the existing supplyHigh risk → low with controls
  • Falls from podium stepsMedium risk → low with controls
  • Heavy cable drumsMedium risk → low with controls
  • Other trades in the riser corridorMedium risk → low with controls

Key controls

Confirm each one before you sign.

  • Isolate, lock off and prove dead before you touch a board. Use your own lock and keep the key on you.

  • Work from podium steps with the gate shut. No stepladders.

  • Move cable drums on the drum trailer. Two people for any lift over 25 kg.

  • Dry-liners are on level 2 this week. Keep the corridor clear and barrier off the riser door.

PPE

  • Hard hat
  • Safety boots
  • Gloves
  • Glasses
  • Hi-vis

In an emergency

  • Assembly point: Gate 1.
  • First aider: R. Cowley.

End of the RAMS

An illustration of how a RAMS is read and signed, not the Unibuild app itself. The real app does a great deal more, in your firm’s own name and colours.

  • Unlimited users, one fee per firm
  • Subcontractors and agency workers at no extra cost
  • Your firm’s own branded app
  • Every version and signature kept for seven years
Problems we solve

Thirteen RAMS problems. All thirteen solved.

The reasons a RAMS gets rejected, ignored or questioned, and what Unibuild does about each. Open any one for the full answer.

13/13Solved in one module
Book a demo →
Solved

When the principal contractor rejects your RAMS and delays the start

What goes wrong

Where the project requires principal-contractor acceptance of RAMS before a work package starts, an unresolved review can delay that start. Agree the submission, review and acceptance process with the principal contractor before mobilisation.

The usual reasons are the ones on this page: a document copied from another job, vague controls, and nothing about the trades working alongside. Each round trip is another email, another marked-up PDF and another file name.

How Unibuild solves it

In Unibuild, a RAMS is submitted, reviewed, and approved or returned in one place. Comments stay on the RAMS they were made on, and a revision becomes a new version. Both sides see where it stands at any moment.

Before it is sent, the AI review flags vague controls and other gaps for the author to put right. The reviewer then checks site details, controls and interfaces with other trades, and the decision and its reasons stay with the document.

  • Submitted, approved or returned, visible to both sides
  • Comments kept with the version they were made on
  • The approved version is the one operatives sign

See it working on one of your own RAMS.

Solved

A RAMS copied from the last job instead of written for the site

What goes wrong

Most RAMS begin as the last one that was approved, saved under a new name. The site name gets changed. The access route, the hazards and the emergency arrangements often do not.

A principal contractor spots another site’s address in seconds. So does an inspector. Regulation 3 of the Management of Health and Safety at Work Regulations 1999 asks for an assessment that is suitable and sufficient for this work.

How Unibuild solves it

Each RAMS is linked to a project. The site name, address and job details fill in from that record, and the author sets the hazards, access and emergency arrangements for the actual work.

You start from your own templates or a starter library of around forty by trade, then tailor the hazards to the site.

  • Project details filled from the job record
  • Your own templates, imported free
  • Tailored per site, not per file

See it working on one of your own RAMS.

Solved

RAMS sign-off sheets signed late, or lost

What goes wrong

The sign-off sheet lives on a clipboard in the cabin. Half the team signs on Monday, the rest catch up on Thursday, and the late starters are missed. Then the sheet goes back to the office in a van.

It matters on the day something goes wrong. The first question after an incident is whether the injured person was briefed on that RAMS, and when. A late sheet answers it badly. A lost one does not answer it at all.

How Unibuild solves it

In Unibuild, the operative signs the RAMS on their own phone at the start of the shift, in your firm’s own app. The QR clock-in knows who has arrived and their trade, and puts the right RAMS in front of them first.

Every signature carries the person’s name and the time, and nobody can edit it afterwards.

  • Arrive at ten, sign at ten
  • Late starters caught at the gate
  • One register for the whole job

See it working on one of your own RAMS.

Solved

Proving who signed a RAMS, and when, at an audit

What goes wrong

An auditor or an inspector asks a plain question: who signed this RAMS, which version, and when. On paper the answer is a stack of sheets in a site file, some undated and some illegible.

After an incident the same question carries far more weight, and it can be asked years after the job has finished.

How Unibuild solves it

Unibuild stores every signature with its date, time and device details, and prints them all as the final page of the RAMS PDF. The document and its signature register travel together.

Records are kept for seven years, with every version, every edit and every signature intact. It is the page auditors ask for, ready before they ask.

  • Date, time and device for every signature
  • Printed as the last page of the PDF
  • Kept for seven years

See it working on one of your own RAMS.

Solved

A RAMS briefing signed by operatives, but not understood

What goes wrong

A signature proves somebody held the pen. It does not prove they know the three things that will keep them safe on this task.

The supervisor checks that workers understand the controls and can put them into practice, often by asking the crew to explain the critical controls back.

How Unibuild solves it

Unibuild puts the key controls in front of the operative before the signature box. They read a short crew summary on the phone, confirm the controls that matter for the task, and then sign.

The record shows which controls each person acknowledged, so the supervisor checks understanding on site with that list in hand.

  • Key controls first, signature second
  • Confirmed by each operative, not as a group
  • Acknowledgement linked to the controls

See it working on one of your own RAMS.

Solved

RAMS version control: two versions of the same RAMS on one site

What goes wrong

The method changes on Tuesday and the revised RAMS goes out by email. The supervisor has it. Half the team are still working to the version they signed last week, and the copy in the cabin is older still.

After an incident, nobody asks whether a RAMS existed. They ask which version the injured person accepted, and whether it was the current one.

How Unibuild solves it

In Unibuild, a RAMS freezes when it is submitted. Changing it creates a new version instead of editing the old one, and an edited RAMS has to be signed again by everyone working to it.

An edit log records every change. Every earlier version stays readable with its own signatures, so you can always show who accepted which document, and on which date.

  • One live version, always
  • Old versions kept with their signatures
  • Who has not signed the revision, at a glance

See it working on one of your own RAMS.

Solved

Vague RAMS control measures like “be careful” and “use correct PPE”

What goes wrong

“Take care at height.” “Use appropriate PPE.” “Follow site rules.” Lines like these fill a RAMS quickly and control nothing, because nobody can check whether they were done.

They are among the commonest reasons a principal contractor sends a RAMS back, and they read badly to an inspector after an incident.

How Unibuild solves it

Unibuild’s AI review flags vague controls and other gaps before the RAMS is submitted. The writer replaces them with something specific and checkable: which harness, which anchor point, who inspects the scaffold and when.

Your competent person writes the assessment and signs it off, with the flags in front of them. How the AI RAMS review works.

  • Caught before submission, not after rejection
  • Specific controls anybody can check
  • Your competent person keeps the final say

See it working on one of your own RAMS.

Solved

Subcontractor RAMS accepted without a proper review

What goes wrong

As principal contractor, CDM 2015 makes you plan, manage and coordinate the work of every contractor on site. In practice, subcontractor RAMS arrive as email attachments, get saved to a folder, and are ticked because every section is there.

Nobody has checked the method works on this site. If one of their operatives is hurt, the question will be what you did with their RAMS when it arrived.

How Unibuild solves it

In Unibuild, subcontractors submit their RAMS into the same system as your own. The AI review checks it before you decide, and you approve it or return it with comments. Every decision carries a name and a date.

Their operatives then sign it at your gate the same way your own people do, at no extra cost, because the fee is per firm and never per person.

  • AI-checked before you accept it
  • Approvals with a name and a date
  • Their operatives sign at your gate

See it working on one of your own RAMS.

Solved

RAMS for agency and temporary workers without the app

What goes wrong

Agency labour, temporary workers and a subcontractor’s operatives arrive for a day or a week. Asking each of them to install an app and sign in before they read a RAMS loses the morning.

So the briefing falls back to a paper sheet in the cabin, and their signatures sit outside the record everyone else is on.

How Unibuild solves it

Every RAMS in Unibuild has its own signing link. One click emails it to the worker, who reads and signs in a browser on a phone or a computer, with nothing to install.

The sent email stands as proof the RAMS was sent to them, and their signature joins the same record as your own people’s the moment they sign. Anyone who prefers the app signs there instead. How signing works.

  • A unique link for each RAMS
  • Emailed in one click, kept as proof
  • Signed in any browser, phone or computer

See it working on one of your own RAMS.

Solved

A RAMS operatives cannot read in English

What goes wrong

UK sites run on many languages. A RAMS written and briefed only in English can be signed by an operative who followed little of it.

A signature on a document the person could not read is weak evidence. Regulation 10 of the Management of Health and Safety at Work Regulations 1999 asks employers to give workers comprehensible information on the risks they face.

How Unibuild solves it

In Unibuild, each operative reads the RAMS on the phone in their preferred language, with readability tools and the key controls first, and confirms them before signing. The app has accessibility tools as well.

The signature is recorded against the same version as everybody else’s, so there is still one RAMS and one register for the job.

  • Their language, your RAMS
  • Key controls confirmed before signing
  • One version, one register

See it working on one of your own RAMS.

Solved

A RAMS too long to read at the gate

What goes wrong

A RAMS written to satisfy a tender reviewer runs to forty pages. Nobody reads forty pages at seven in the morning with the plant already running.

The controls that matter are in there somewhere, between the company policy and the appendices. HSE guidance on CDM 2015 asks for paperwork in proportion to the risk, not generic bulk.

How Unibuild solves it

Unibuild keeps the full RAMS for the principal contractor, the file and the inspector. The operative gets a short crew summary on the phone: the task, the hazards, the key controls and what to do in an emergency.

The signature is linked to the full version, held on file with every signature against it.

  • The full RAMS for the file
  • A crew summary for the gate
  • Signed against the full version

See it working on one of your own RAMS.

Solved

A RAMS that ignores the other trades, the public and traffic

What goes wrong

Where a RAMS usually fails is at the interfaces. The scaffold altered while the roofers are on it. The excavation beside the delivery route. Hot works under somebody else’s insulation.

A RAMS written for your task alone says nothing about any of them. Principal contractors reject RAMS for exactly this, and after an incident the gap is obvious.

How Unibuild solves it

In Unibuild, each task in a RAMS records who else shares the area: other trades, members of the public, passing traffic and deliveries, with the controls that keep them apart.

  • Other trades recorded per task
  • The public and traffic included
  • Controls for every shared area

See it working on one of your own RAMS.

Solved

Hours lost writing every RAMS from scratch

What goes wrong

The RAMS usually gets written by the owner or the contracts manager, after hours, because everyone else is on site. Every new job, every new principal contractor and every accreditation renewal wants another one.

Accreditation schemes such as CHAS and Constructionline typically ask for recent, site-specific RAMS, so a generic template does not help there either.

How Unibuild solves it

Unibuild ships with a starter library of around forty RAMS by trade, and imports your existing templates free as part of onboarding. Site and job details fill in from the project, and the AI review flags vague controls before submission.

When a main contractor or a scheme asks for samples, you export the RAMS exactly as it is held. Your competent person tailors each template to the job it is used on.

  • Around forty starters by trade
  • Your templates, imported free
  • Exported as held, for tenders and SSIP

See it working on one of your own RAMS.

At a glance

What is included in RAMS software?

Draft, review, brief, sign and retain the version history against the job.

Part of Unibuild
RAMS is included in the platform alongside permits, toolbox talks and project records.
Pricing
One quoted monthly fee per firm, with unlimited users. No separate RAMS module fee. See what the fee includes.
Templates
Around forty starter RAMS by trade, plus your own templates imported during onboarding at no extra charge.
AI builder
Choose a template, describe the job in a prompt, and the AI builds the RAMS for your competent person to edit and finalise. See the AI RAMS builder.
AI review
Vague controls and other gaps flagged before a RAMS goes out, and a subcontractor’s RAMS checked before you accept it. See the AI RAMS review.
Approvals and revisions
Approve or return with comments. An edit creates a new version that everyone signs again, and earlier versions keep their signatures.
On site
Operatives sign in your firm’s branded app. Subcontractor, agency and temporary workers sign in the app or through a signing link in any browser, at no extra cost. See the RAMS app.
Records
A signature page in every RAMS PDF, and every version, edit and signature kept for seven years.
Work allocation
The register shows who has signed each version. If you want an unsigned RAMS to block an allocation, that rule is built in.

Use the free RAMS review checklist before accepting a document. For the wider platform in daily use, read the EMS customer story.

Published by Unibuild Technologies Limited · Updated . Safety references.

Managing RAMS manually and in Unibuild
The momentManual document workflowUnibuild
Writing itTemplates maintained and adapted by the authorYour imported templates, or a starter library by trade
Checking itRead through page by page by whoever has timeAI review flags the gaps before it goes out
ApprovalReview correspondence and comments collated manuallyApproved or returned with comments, in one place
Reaching every operativeBriefings and document distribution organised by the supervisorPulled up by trade at clock-in
LanguageTranslations prepared and distributed separatelyThe operative’s own language
The signatureSignature sheets collected and matched to the documentOn the phone or by link, with date, time and device
A revisionRevision issue and withdrawal tracked manuallyA new version everyone signs again, the old one kept
SubcontractorsSubmissions, approvals and signatories collated manuallyThey sign the same RAMS, at no extra cost
The inspector asksRetrieve the document version and its briefing/signature recordsThe signature page in the PDF, kept seven years
What the module does

Six things a folder of PDFs cannot.

Pulled by trade
at clock-in

The QR code clock-in knows who has arrived and what trade they are. Today's RAMS for that trade comes up on the phone before the work does, rather than waiting to be handed out.

  • Scroll, sign, recorded
  • Read in their own language
  • Arrive at ten, sign at ten
  • No sheet caught up on Thursday
Delivered, not distributedLive

Signed against
a frozen version

A RAMS freezes on submission. Amending it means a new version that everyone signs again. Every signature is against a specific document on a specific date, not whatever the file says today.

  • The question an inspector asks
  • An edit log behind every change
  • Old versions stay readable, signatures intact
  • One live document, always
Version, name and dateLive

Forty-odd starters,
then your own

A library of around forty RAMS by trade ships with the platform, and your existing templates are imported as part of onboarding at no charge. Your competent person tailors each one to the job, or the AI builds it from a template and a prompt, and the AI review checks it before release.

  • Hazards, controls, residual risk and PPE
  • Your templates, exportable at any time
  • The starter library is a floor
  • No rewriting a set you trust
Yours, imported freeLive

Everyone on the
gate, not just staff

Each person signs under their own company’s name. A subcontractor’s operatives, agency and temporary workers and visitors sign the same RAMS as your own people, in the app or through a signing link in any browser. Nobody needs a staff record first.

  • No extra cost: the fee is per firm
  • The link emailed in one click, kept as proof
  • One register for the job
  • Covers the gate, not the payroll
Per firm, not per headLive

Dynamic risk
assessment on site

When conditions change, the supervisor records the reassessment where the work is, against the same job. Dynamic risk assessment is live in the office portal and the app.

  • Weather, sequence, the plant that never came
  • Photographs kept with the assessment
  • A changed method leaves a record
  • Filed against the same job
Recorded where it happensLive

Project safety records,
kept together

RAMS sit against the project with the permits, the toolbox talks, the diary and the plant records, and every record is kept for seven years. When the CDM health and safety file is prepared, the information it needs is selected from them.

  • One PDF for the client or principal designer
  • A signature page in every RAMS PDF
  • Nobody can edit the record afterwards
  • Kept for seven years
Generated, not reconstructedLive

Ask who signed the current revision of your highest-risk RAMS.

Not who was sent it, and not who was on site that week. Who accepted that version, on what date, on which device. In Unibuild, the answer is the last page of the PDF.
Book a demo → 30 minutes. Bring a real RAMS and we will load it.
Where it matters

Four moments a RAMS is read, and where the duty sits.

Keep the assessment current, brief the people doing the work and check that the controls remain effective.

At the gate, before the work

Brief the work and its controls before it starts. Record acknowledgement against the current RAMS, check that workers understand the method, and supervise the work as it proceeds.

When the method changes

Review the assessment when conditions or methods change, or there is reason to doubt it remains valid. Update the controls and explain the changes to affected workers. In Unibuild the revised RAMS goes back to everyone working to it to sign again. HSE explains when to review risk controls.

At pre-qualification

A main contractor or an SSIP scheme asks for sample RAMS and evidence they are briefed. Exported from the live record, what they receive is what you hold. The reformatted version is where a document set starts diverging from the one in use.

After an incident

The question is whether the person doing the work had been briefed on the controls for that task. The answer has to carry a name, a version and a date. This is where a signature taken at the gate stops being administration.

Where CDM 2015 puts the duty

Under CDM 2015 regulation 15(2), a contractor must plan, manage and monitor its own work. The aim is work carried out without risks to health and safety, so far as is reasonably practicable. The risk assessment duty is set out in MHSWR 1999 regulation 3. A RAMS is how most firms record the assessment and the method those duties call for. These regulations apply in Great Britain, and Northern Ireland has its own. There is more in the CDM 2015 guide, and the duties are listed on the CDM checklist.

Where the rules are yours to set

Your competent person writes the assessment and judges whether a control is adequate, with the AI review’s flags in front of them. Everything around it is yours to decide. The module shows who has and has not signed each version. If you want an unsigned RAMS to stop an allocation outright, we build that rule into your system at implementation. Unibuild is bespoke software, written to each firm rather than shipped as one fixed product. Changes asked for after go-live are included in the monthly fee.

The RAMS is one of five things signed on the same phone.

Permits to work, toolbox talks, dynamic risk assessments and near-miss reports run through the same register, against the same project, with the same audit trail.
See the whole module → Or call the office on UK hours
Questions

Asked by whoever
signs the RAMS off.

Can AI write our RAMS?
Yes. Choose a template, your own or one of around forty by trade, and describe the job in a prompt. The AI builds the RAMS, and your competent person reviews it, edits it by hand and finalises it. How the AI RAMS builder works.
Does Unibuild check RAMS with AI?
Yes. Before a RAMS is issued, the AI review flags vague controls and other gaps, and the author puts them right. A subcontractor’s RAMS is checked the same way before you accept it. The same AI document review covers method statements, risk assessments, estimates, quotations and tender submissions. How the AI RAMS review works.
Can we check a subcontractor’s RAMS before they start?
Yes. The subcontractor submits its RAMS into Unibuild, and the AI review checks it before you decide. You approve it or return it with comments, and both sides see where it stands. Every approval carries a name and a date. The RAMS review checklist sets out what a reviewer looks for.
Who has the final say, the AI or our competent person?
Your competent person. The AI flags what needs attention, and your competent person decides what changes, approves the RAMS and signs it off. The duty stays with the employer, and the record shows who approved each version and when.
How do we prove every operative read and signed it?
Each operative reads the RAMS on their phone and signs on the screen, in your firm’s own staff app. The QR clock-in knows who has arrived and opens the RAMS for their trade on that job. Every signature is held with its date, time and device, against the version they signed. All of them print on the final page of the RAMS PDF, and nobody can edit a signature afterwards.
Can work be held until the RAMS is signed?
Yes. The register shows who has and has not signed each version, live. If you want an unsigned RAMS to block the work allocation, that rule is set up in your system at implementation.
What happens when a RAMS is revised mid-job?
A change creates a new version, and an edited RAMS has to be signed again. Earlier signatures stay attached to the earlier version, which remains readable, and an edit log records every change. The register shows who has not yet signed the new version, so the supervisor knows who to brief before the work carries on.
Can subcontractor, agency and temporary workers sign?
Yes, at no extra cost, because the fee is per firm rather than per person. Each person signs under their own company’s name. They sign in the app, or through the signing link each RAMS has, which opens in a browser with nothing to install. One click emails the link, and the sent email stands as proof the RAMS was sent. How signing works. Their firms’ certificates and insurances sit on the subcontractor portal.
What can we hand an auditor, a client or a principal contractor?
The RAMS as a PDF, with every signature printed on its final page. Behind it sits every version, every edit and the name and date on each approval. Download it at any time, for an audit, a client review or handover at the end of the job.
Can we use our existing RAMS templates?
Yes. Your existing templates are imported during onboarding at no extra charge. The platform also includes around forty starter RAMS by trade, and your competent person tailors each one to the site and the work. You own your templates and can export them at any time. There is also a free editable RAMS template to download, with no sign-up.
Can a RAMS be signed on a site with no signal?
Yes. The field app works on sites without coverage, and what is recorded there syncs with the office the moment the phone is back in signal. Clock-ins are stored on the phone and sent on automatically. Tell us which of your sites have no coverage and the setup is planned around them from the start.
Are permits and toolbox talks in the same system?
Yes. Permits to work and toolbox talks sit in the health and safety module, against the same project and the same people as the RAMS. A site manager sees the safety paperwork for a job in one place.
Does Unibuild handle dynamic risk assessments?
Yes, in the office portal and the app. When conditions on site change, the supervisor records the reassessment where the work is, against the same job, with photographs kept alongside. Dynamic risk assessment explains how it works.
How quickly can we be up and running?
Most firms go live in about two weeks, in phases. Your templates are imported during onboarding, and the programme is agreed with you after scoping.
Where is our data held, and who owns it?
In London, encrypted, and it does not leave the UK. Your RAMS, templates and signature records belong to you, and you can export everything at any time.
How much does Unibuild RAMS software cost?
RAMS is included in Unibuild’s quoted monthly platform fee, with no separate RAMS module fee and no charge per signatory. The fee includes unlimited users, configuration, training, template migration, support and everyday AI, and is fixed for three years. Heavier AI work is paid as used, at the AI provider’s own rate with nothing added. How AI is charged, how pricing works, or request your firm’s quote.
Can we try it on a live job first?
Yes. The 14-day trial is the full platform with every module switched on, so you can run RAMS on a live job. No card is needed.
Free templates

RAMS templates by trade and hazard

Pre-filled risk assessments and method statements, free in PDF and Word. Each guide sets out the hazards and controls, the sequence of work, the law, and a toolbox talk to brief it with.

By trade

  • Air conditioning and HVAC RAMSUnits and ductwork at height, refrigerant handling, brazing, roof plant and the electrical connection.
  • Bricklaying RAMSLaying brick and block from scaffold, heavy blocks, mortar, cutting dust and new walls in wind.
  • Carpentry and joinery RAMSFirst and second fix, door and fire door installation, saws, wood dust and work from steps and platforms.
  • CCTV installation RAMSCameras, access control and intruder alarms: ladders and MEWPs, poles, cable routes, live circuits and occupied premises.
  • Cleaning risk assessmentCommercial and site cleaning, jet washing and window cleaning: chemicals, slips, ladders and lone work.
  • Concrete works RAMSFormwork, reinforcement, pump and skip pours, wet cement, power floating and curing, with the sequence for each pour.
  • Demolition RAMSAsbestos surveys and isolations, the demolition sequence, stability, dust, noise and exclusion zones.
  • Drylining RAMSMetal stud, plasterboard and suspended ceilings: board handling, cutting dust, podiums and fire-rated walls.
  • Electrical RAMSSafe isolation, live work, testing and inspection, and working near other trades.
  • Facilities maintenance RAMSPlanned and reactive maintenance in occupied buildings: access, isolations, plant rooms, roofs and working alone.
  • Fire alarm installation RAMSCabling and fixing devices at height, live systems in occupied buildings, isolations, keeping fire cover and commissioning.
  • Glazing and window RAMSTaking out old frames, handling heavy glass units, fixing at height, vacuum lifters and sealants.
  • Groundworks RAMSExcavations, buried services, plant, trench support and inspections at the start of each shift.
  • Hot works and welding RAMSWelding, cutting, grinding and torch-on work: permits, fire watch, fume and gas cylinders.
  • Insulation RAMSLoft, cavity, internal and external wall insulation: fibres and foams, roof voids, ventilation and fire.
  • Landscaping and fencing RAMSPost holes, post drivers and buried services, mowers, strimmers and cut-off saws, paving slabs and herbicides.
  • Painting and decorating RAMSAccess equipment, solvents and spray, old lead paint, dust from preparation and occupied buildings.
  • Pest control risk assessmentRodenticides and insecticides, lofts and voids, bird work at height and disease from droppings.
  • Plastering and rendering RAMSHop-ups and platforms, mixing and spraying, render on scaffold, lime and cement, and dust from preparation.
  • Plumbing and heating RAMSSoldering and brazing, gas work, unvented systems, lofts and occupied homes.
  • Rail RAMSWork on or near the line: possessions and protection, track safety, plant, overhead lines and conductor rail.
  • Refurbishment RAMSLofts, extensions and alterations in occupied homes: temporary support, asbestos, services, dust and neighbours.
  • Roofing RAMSPitched and flat roofs, fragile surfaces, edge protection, hot work and getting materials up safely.
  • Rope access risk assessmentTwo-rope systems, anchors, rescue from the rope, exclusion zones below and the weather.
  • Scaffolding RAMSErecting, altering and dismantling tube and fitting and system scaffold, with handover and inspection.
  • Solar PV installation RAMSRoof access and edge protection, lifting panels, DC that cannot be switched off, and battery storage.
  • Steel erection RAMSStructural steel: delivery and lifting, bolting up at height, temporary bracing, MEWPs, nets and decking.
  • Temporary works RAMSSite hoardings, props, falsework and excavation support: design, checks before loading, wind and the public.
  • Tiling and flooring RAMSKneeling work, adhesives and screeds, cutting tile and stone, heavy rolls and boards, and floors others walk on.
  • Tree surgery RAMSClimbing and aerial rescue, chainsaws, felling and dismantling, chippers and the public below.

By hazard

The blank RAMS template, the method statement template and the RAMS review checklist are free too.

Safety references

The guidance behind the duties.

The product information on this page is published by Unibuild. The legal references below cover Great Britain and were checked on .

For a practical document check, use the free RAMS review checklist. For preparation guidance, read RAMS that hold up.

Ask for a quote

Tell us a little about the firm.
We do the rest.

Two minutes. A written figure by email, usually the same working day. Unlimited users, so every operative signing a RAMS is included.

Headcount
Areas of interest