Write
Start from your own templates or around forty by trade, or describe the job and let the AI build it. Job details fill in.
UK-built · CDM · CIS · MTD
Unibuild is RAMS software for UK trades and specialist contractors. It carries each one from the first draft, through an AI review, to the operative’s signature at the gate, with approvals and versions kept together.

Written and approved in the office, briefed and signed on site, with every version and signature on record. Your competent person makes the safety decisions.
In the office
Start from your own templates or around forty by trade, or describe the job and let the AI build it. Job details fill in.
The AI review flags vague controls and missing detail before a RAMS goes out, your subcontractors’ included.
Approved or returned with comments in one place. Every edit becomes a new version.
On site
The right RAMS on each operative’s phone at clock-in, in their own language, key controls first.
Signed on the phone, or by email link for agency and subcontract workers, with name, date and time.
When conditions change, the supervisor records a dynamic risk assessment on the phone, against the same job.
A. Fenton
On site since 07:42
Job 2431 · Gate 1
Before you start
Signed this week
Elmfield · Job 2431 · Version 3
Sub-mains and distribution boards, level 2Approved · Electricians
In short
Two of you run the sub-main cables up the riser and fit the new boards on level 2. The boards stay dead until the electrical supervisor switches them on.
Hazards
Key controls
Confirm each one before you sign.
Isolate, lock off and prove dead before you touch a board. Use your own lock and keep the key on you.
Work from podium steps with the gate shut. No stepladders.
Move cable drums on the drum trailer. Two people for any lift over 25 kg.
Dry-liners are on level 2 this week. Keep the corridor clear and barrier off the riser door.
PPE
In an emergency
End of the RAMS
Read to the end to sign
I have read and understood version 3 of this RAMS, and I will work to it.
Signature
Print name
A. Fenton
Date and time
Your signature is now on the signature page of this RAMS.
Signature pageRAMS 2431-07 · version 3
Read in your language
An illustration of how a RAMS is read and signed, not the Unibuild app itself. The real app does a great deal more, in your firm’s own name and colours.
The reasons a RAMS gets rejected, ignored or questioned, and what Unibuild does about each. Open any one for the full answer.
Solved Approved or returned with comments in one place, not by email.
Solved Site and job details fill in from the project record.
Solved Signed on the phone at the gate, with name and time.
Solved Every signature, dated and timed, on the last page of the PDF.
Solved Key controls confirmed on the phone before anyone signs.
Solved Every revision is a new version, and everyone signs it again.
Solved The AI review flags vague controls before the RAMS goes out.
Solved Checked by the AI review, then approved with a name and a date.
Solved A signing link by email, signed in any browser.
Solved Each operative reads the RAMS in their own language.
Solved A short crew summary on the phone. The full RAMS on file.
Solved Other trades, the public and traffic recorded for each task.
Solved Around forty starters by trade, and your own imported free.
Draft, review, brief, sign and retain the version history against the job.
Use the free RAMS review checklist before accepting a document. For the wider platform in daily use, read the EMS customer story.
Published by Unibuild Technologies Limited · Updated . Safety references.
| The moment | Manual document workflow | Unibuild |
|---|---|---|
| Writing it | Templates maintained and adapted by the author | Your imported templates, or a starter library by trade |
| Checking it | Read through page by page by whoever has time | AI review flags the gaps before it goes out |
| Approval | Review correspondence and comments collated manually | Approved or returned with comments, in one place |
| Reaching every operative | Briefings and document distribution organised by the supervisor | Pulled up by trade at clock-in |
| Language | Translations prepared and distributed separately | The operative’s own language |
| The signature | Signature sheets collected and matched to the document | On the phone or by link, with date, time and device |
| A revision | Revision issue and withdrawal tracked manually | A new version everyone signs again, the old one kept |
| Subcontractors | Submissions, approvals and signatories collated manually | They sign the same RAMS, at no extra cost |
| The inspector asks | Retrieve the document version and its briefing/signature records | The signature page in the PDF, kept seven years |
The QR code clock-in knows who has arrived and what trade they are. Today's RAMS for that trade comes up on the phone before the work does, rather than waiting to be handed out.
A RAMS freezes on submission. Amending it means a new version that everyone signs again. Every signature is against a specific document on a specific date, not whatever the file says today.
A library of around forty RAMS by trade ships with the platform, and your existing templates are imported as part of onboarding at no charge. Your competent person tailors each one to the job, or the AI builds it from a template and a prompt, and the AI review checks it before release.
Each person signs under their own company’s name. A subcontractor’s operatives, agency and temporary workers and visitors sign the same RAMS as your own people, in the app or through a signing link in any browser. Nobody needs a staff record first.
When conditions change, the supervisor records the reassessment where the work is, against the same job. Dynamic risk assessment is live in the office portal and the app.
RAMS sit against the project with the permits, the toolbox talks, the diary and the plant records, and every record is kept for seven years. When the CDM health and safety file is prepared, the information it needs is selected from them.
Ask who signed the current revision of your highest-risk RAMS.
Not who was sent it, and not who was on site that week. Who accepted that version, on what date, on which device. In Unibuild, the answer is the last page of the PDF.Keep the assessment current, brief the people doing the work and check that the controls remain effective.
Brief the work and its controls before it starts. Record acknowledgement against the current RAMS, check that workers understand the method, and supervise the work as it proceeds.
Review the assessment when conditions or methods change, or there is reason to doubt it remains valid. Update the controls and explain the changes to affected workers. In Unibuild the revised RAMS goes back to everyone working to it to sign again. HSE explains when to review risk controls.
A main contractor or an SSIP scheme asks for sample RAMS and evidence they are briefed. Exported from the live record, what they receive is what you hold. The reformatted version is where a document set starts diverging from the one in use.
The question is whether the person doing the work had been briefed on the controls for that task. The answer has to carry a name, a version and a date. This is where a signature taken at the gate stops being administration.
Under CDM 2015 regulation 15(2), a contractor must plan, manage and monitor its own work. The aim is work carried out without risks to health and safety, so far as is reasonably practicable. The risk assessment duty is set out in MHSWR 1999 regulation 3. A RAMS is how most firms record the assessment and the method those duties call for. These regulations apply in Great Britain, and Northern Ireland has its own. There is more in the CDM 2015 guide, and the duties are listed on the CDM checklist.
Your competent person writes the assessment and judges whether a control is adequate, with the AI review’s flags in front of them. Everything around it is yours to decide. The module shows who has and has not signed each version. If you want an unsigned RAMS to stop an allocation outright, we build that rule into your system at implementation. Unibuild is bespoke software, written to each firm rather than shipped as one fixed product. Changes asked for after go-live are included in the monthly fee.
The RAMS is one of five things signed on the same phone.
Permits to work, toolbox talks, dynamic risk assessments and near-miss reports run through the same register, against the same project, with the same audit trail.Pre-filled risk assessments and method statements, free in PDF and Word. Each guide sets out the hazards and controls, the sequence of work, the law, and a toolbox talk to brief it with.
The blank RAMS template, the method statement template and the RAMS review checklist are free too.
The product information on this page is published by Unibuild. The legal references below cover Great Britain and were checked on .
For a practical document check, use the free RAMS review checklist. For preparation guidance, read RAMS that hold up.
Same platform, same login. These are the modules that plan the work, record it, and hold the evidence it was done properly.
What an inspector looks for, the revision everybody was working to, and where an informal record stops being one.
A 30-minute live demo. We load a RAMS you already use and take it from draft to a signature on the phone.
All thirteenSolved
Two minutes. A written figure by email, usually the same working day. Unlimited users, so every operative signing a RAMS is included.