Dynamic risk assessment

Dynamic risk assessment,
recorded where the work is.

When conditions change on site, the risk is reassessed there and then. Unibuild records it on the phone or in the office portal, against the same job as the RAMS, with photographs kept alongside.

An engineer checking a tablet beside rooftop air conditioning condensers before carrying on with the work
Problems we solve

Eleven dynamic risk assessment problems. All eleven solved.

What goes wrong when a reassessment stays in somebody’s head, and how Unibuild puts it on the record.

11/11Solved in one module
Book a demo →
Solved

A dynamic risk assessment that was never written down

What goes wrong

Most dynamic risk assessments are done properly. The supervisor sees the change, thinks it through and adjusts the method. Then the job carries on, and nothing shows that it happened.

After an incident, the first questions are what changed and what was done about it. A reassessment held in one person’s memory is a weak answer for an investigator, an insurer or a client.

How Unibuild solves it

In Unibuild, the person doing the work records the dynamic risk assessment on their phone, there and then, against the job they are working on.

The record shows what was checked, who checked it and when, with the same audit trail as the RAMS.

  • Recorded where the work is
  • Who checked, and when
  • Filed against the job

See a dynamic risk assessment recorded on one of your own jobs.

Solved

When the site no longer matches the RAMS

What goes wrong

The RAMS was written for the job as planned. On the day, the access route is blocked, the ground is soft after rain or another trade has altered the scaffold.

Regulation 3 of the Management of Health and Safety at Work Regulations 1999 requires an assessment to be reviewed after a significant change. The change rarely waits for the office.

How Unibuild solves it

Unibuild records the dynamic risk assessment against the same job as the RAMS, so the change and the response to it sit with the plan they departed from.

The reassessment, its photographs and the original method are read together, by the site and by the office.

  • Filed against the same job
  • A changed method leaves a record
  • Read beside the RAMS it changed

See a dynamic risk assessment recorded on one of your own jobs.

Solved

A dynamic risk assessment nobody can find after an incident

What goes wrong

The assessment was done and written down. Two years later a claim arrives, and the form is in a box, a skip or the glovebox of a van that has since been sold.

A personal injury claim can arrive years after the event. The record has to outlast the job and the people who worked on it.

How Unibuild solves it

Unibuild keeps dynamic risk assessments in the same register as the RAMS, permits to work, toolbox talks and near miss reports, against the same project.

Every record can be exported at any time, as CSV, XML, JSON or PDF, so the job’s safety history is there when somebody asks for it.

  • One register for the job’s safety records
  • The same audit trail as the RAMS
  • Exported whenever it is needed

See a dynamic risk assessment recorded on one of your own jobs.

Solved

A RAMS revised after a reassessment, but never re-signed

What goes wrong

A reassessment shows the method has to change for the rest of the job. The RAMS is updated in the office, and a new copy goes out by email.

The crew carry on under the version they signed last week. On paper, nobody has accepted the new method.

How Unibuild solves it

In Unibuild, an edited RAMS has to be signed again. Every revision is a new version, kept with its own signatures, and the edit log shows what changed.

Operatives sign in the app. Agency and temporary workers who have not installed it sign through a unique link that opens in a browser, on a phone or a computer.

  • An edited RAMS is signed again
  • Every version and edit kept
  • Signed in the app or by link

See a dynamic risk assessment recorded on one of your own jobs.

Solved

Reactive call-outs and lone engineers

What goes wrong

A maintenance engineer arrives at a leak, a fault or a failed boiler. Nobody knew what they would find, so the written assessment covers the work only in general terms.

HSE expects employers to manage the risks before anybody works alone. The particular hazards of this visit only show themselves on arrival.

How Unibuild solves it

In Unibuild, the engineer records a dynamic risk assessment on arrival, against the job, before starting work.

Where the firm uses one, a lone working permit is raised and closed out on the same phone.

  • Assessed on arrival
  • Recorded against the job
  • Lone working permit on the same phone

See a dynamic risk assessment recorded on one of your own jobs.

Solved

Changes on site that the office never hears about

What goes wrong

A reassessment on Monday changes how the job is done. The contracts manager finds out at the end of the week, and the next crew starts from the old plan.

Under CDM 2015 regulation 15, a contractor must plan, manage and monitor its own work. Monitoring depends on knowing what changed.

How Unibuild solves it

Dynamic risk assessment in Unibuild is live in the office portal as well as the app. What is recorded on site is filed against the job, where the office can read it.

Unibuild customers use it widely, on the phone and in the office.

  • In the app and the office portal
  • Filed against the job
  • The next shift starts from the change

See a dynamic risk assessment recorded on one of your own jobs.

Solved

A change on site, and no clear list of who is there

What goes wrong

A lift is moved, a road closes or a scaffold is taken out of use. The supervisor has to tell everybody it affects, including the agency operatives who started this morning.

A list written at the gate at seven o’clock is out of date by ten.

How Unibuild solves it

The QR clock-in shows who is on each site, live, including subcontract and agency operatives who scan the same poster.

The supervisor briefs the change to the people actually there, and the dynamic risk assessment is recorded against the same job.

  • Who is on site, live
  • Agency and subcontract operatives included
  • Briefed to the people actually there

See a dynamic risk assessment recorded on one of your own jobs.

Solved

A dynamic risk assessment form with one blank box

What goes wrong

Some firms record a dynamic risk assessment as a single box headed “any other hazards?”. At the end of a long shift it gets a dash, or the word “none”.

A blank box proves the form existed. It does not show what anybody looked at.

How Unibuild solves it

Unibuild’s dynamic risk assessment has twenty questions answered on site before work starts, so the record shows what was checked as well as who checked it.

Photographs sit with the answers, against the job.

  • Twenty questions on site
  • What was checked, not only who
  • Photographs with the answers

See a dynamic risk assessment recorded on one of your own jobs.

Solved

Photographs of the hazard that never reach the record

What goes wrong

The supervisor photographs the open trench, the missing guardrail or the cracked base plate. The picture stays in a personal camera roll, or in a group chat that scrolls past by lunchtime.

Months later, nobody can match the photograph to the job, the day or the decision it supported.

How Unibuild solves it

In Unibuild, photographs taken during a dynamic risk assessment are kept with it, against the job.

The picture, the reassessment and the job are one record, found from the job rather than searched for across phones.

  • Photographs kept with the assessment
  • Matched to the job and the date
  • Nothing left in a camera roll

See a dynamic risk assessment recorded on one of your own jobs.

Solved

Paper dynamic risk assessment pads

What goes wrong

Many firms hand out pads of printed dynamic risk assessment forms. They live in the van, get filled in on a bonnet in the rain and come back to the office weeks later.

A form that reaches the office a month later tells nobody anything in time to act on it.

How Unibuild solves it

In Unibuild, the dynamic risk assessment is on the phone, in your firm’s own staff app, the same app operatives use to clock in and sign a RAMS.

The app works on sites with no signal. What is recorded there syncs with the office the moment the phone is back in signal.

  • On the phone, not on a pad
  • Works with no signal
  • Nothing to post back to the office

See a dynamic risk assessment recorded on one of your own jobs.

Solved

A generic dynamic risk assessment form

What goes wrong

Off-the-shelf forms ask the same questions of a roofer, an electrician and a lift engineer. The ones that matter to your work are missing, and the rest become a box to tick.

A form that does not fit the trade teaches people to stop reading it.

How Unibuild solves it

Unibuild is built to each firm. The dynamic risk assessment asks the questions your health and safety lead has written, in your own terms and for your own trades.

When the questions need to change, the change is made for you, inside the monthly fee.

  • Your questions, your terms
  • Built for your trades
  • Changes inside the monthly fee

See a dynamic risk assessment recorded on one of your own jobs.

In plain terms

A dynamic risk assessment is the ongoing assessment of risks as conditions become apparent or change. It means looking at what is happening around you, checking whether the existing precautions are still enough, and deciding what action is needed.

It works alongside the written risk assessment and the RAMS. The written assessment plans the job, and the reassessment on site keeps it safe as the day unfolds. Unibuild records both against the same job, so a decision made on site becomes part of the job’s safety record.

On site

The questions to ask when conditions change.

A dynamic risk assessment is a short, deliberate pause before the work carries on. These are the questions behind it, whatever the trade.

What has changed?

Name the change in plain words: the weather, the ground, the access, the people nearby, the equipment, or something found that nobody expected.

Who could be harmed now?

Look beyond the task. Other trades, members of the public, building occupants and passing traffic may now be closer to the hazard than they were this morning.

Are the existing controls still enough?

Read the controls in the RAMS against what is in front of you. A control written for dry ground, daylight or an empty building may not hold now.

Is the crew competent for the changed task?

Check that the people doing the work have the training and experience for what the job has become, not only for the job as it was planned.

What has to happen before work carries on?

Remove the hazard if you can. If not, add a control that works on this site today: a barrier, a different access, a second person or a change in sequence.

Should the work stop?

If the risk cannot be brought under control, stop, make the area safe and call the supervisor. Where asbestos is suspected, HSE tells workers to stop work and check before going further.

Who needs to know?

Tell the people affected and the supervisor. Record what changed, what was decided and what was done, so the next person to arrive starts from the same picture.

Does the written assessment need revising?

A change that will last belongs in the RAMS. Revise it, brief it and have it signed again, rather than repeating the same reassessment every morning.

Which assessment, when

Dynamic and static risk assessments, side by side.

A static risk assessment is written in advance; a dynamic one happens during the work. Each has its own job, and Unibuild holds them all against the same project.

Six kinds of risk assessment and permit, and where each sits in Unibuild
AssessmentWhat it isWhen it happensIn Unibuild
Generic risk assessmentA written assessment of a task the firm does often, wherever it is doneWritten in advance and reviewed periodicallyYour own templates, imported free
Site-specific risk assessmentThe generic assessment checked and adapted for one site and its conditionsBefore work starts on that siteSite and job details fill in from the project
RAMSThe risk assessment issued with the method statement: sequence, plant, permits, PPE and peopleBefore the work starts, and again when the method changesReviewed, approved, released and signed on the phone
Dynamic risk assessmentThe ongoing reassessment as conditions become apparent or changeDuring the work, whenever something changesOn the phone or in the office portal, with photographs
Point of work risk assessmentA short check of the task and its surroundings, at the place of workImmediately before the task startsTwenty questions answered on site before work starts
Permit to workFormal authorisation for a defined high-risk activity, under set conditions, for a set periodIssued before the activity and closed out after itRaised and closed out on the phone
In the trades

Dynamic risk assessment examples from six trades.

Construction is one of more than thirty trades Unibuild serves, alongside electrical, mechanical, roofing, scaffolding and facilities maintenance. These are the moments a reassessment earns its keep.

The isolator is not
where the drawing says

An electrician finds the circuit fed from a board the drawings do not show. The isolation in the method statement no longer proves the circuit is dead.

  • Stop before any conductor is touched
  • Find and lock off the true supply
  • Prove dead, then record the change
ElectricalSupply

The household is
at home

A heating engineer arrives to change a radiator valve. Children are moving through the work area and the dog is loose.

  • Agree a clear work area with the occupier
  • Keep tools and lifted floorboards guarded
  • Record the agreement, then carry on
Heating and plumbingPeople

The wind picks up
after lunch

A roofing crew is laying a membrane on a flat roof when the wind rises to the point where sheets can no longer be handled safely.

  • Stop handling sheet materials
  • Secure everything loose on the roof
  • Record when work resumed, and why
RoofingWeather

Two ties removed
by another trade

A scaffolder arrives to add a lift and finds two ties taken out by the window fitters. The scaffold no longer matches its design.

  • Take the affected lifts out of use
  • Reinstate the ties to the design
  • Inspect before it goes back into use
ScaffoldingStructure

A leak above a
busy corridor

A maintenance engineer answers a call-out to water coming through an office ceiling. Staff are walking underneath, and the tiles are sodden.

  • Cordon off the corridor below
  • Isolate the water before opening up
  • Record the cordon and the repair
Facilities maintenanceOccupants

A service the
drawings missed

An excavator driver uncovers an unmarked duct halfway along a trench. The service drawings showed nothing at that depth.

  • Stop digging and keep people clear
  • Locate and identify the service
  • Hand dig near it, and record the change
GroundworksGround

Ask where last week’s reassessments are.

Not whether they happened, because they almost certainly did. Where they are written down, with the photographs, against the job they changed.
Book a demo → 30 minutes, on your own kind of job.
In Unibuild

A dynamic risk assessment app under your own name.

One set of safety records for the job, on the phone at the work and in the office portal.

In your firm’s own app

The dynamic risk assessment opens on the phone, at the work, in the same app operatives use to clock in and sign a RAMS. Your staff app is published on the App Store and Google Play under your company’s own name and icon. Your operatives download your app, not ours.

In the office portal, too

The same assessment is live in the office portal. The contracts manager and the health and safety lead read what changed on site without waiting for paper.

Against the same job as the RAMS

The reassessment is filed with the job and the RAMS it departed from. Photographs stay with it, and a changed method leaves a record that anybody checking the job can follow.

When the change will last

The RAMS is revised as a new version and goes through the AI RAMS review before it is released. Everyone working to it signs again, in the app or through a signing link in any browser.

Knowing who a change affects

The QR clock-in shows who is on each site, so the supervisor knows exactly who needs briefing, including agency and subcontract operatives.

With every other safety record

Dynamic risk assessments sit in one register with the RAMS, permits to work, toolbox talks and near miss reports, with the same audit trail. Records are kept for seven years, and every record exports at any time.

Asking your own questions

Unibuild is bespoke business software for UK trades and specialist contractors: a platform in daily production since 2016, shaped to the way each firm already works. Your own dynamic risk assessment questions are built in, and changes after go-live are inside the monthly fee.

Part of health and safety

Dynamic risk assessment is part of the health and safety module, with RAMS, permits, COSHH and near miss reporting. One monthly figure covers every module, with unlimited users.

Where the duty sits

Where the duty to reassess comes from.

The phrase grew up in the fire and rescue service. The duty behind it applies to every employer.

Review when things change

The Management of Health and Safety at Work Regulations 1999 require a suitable and sufficient risk assessment. Regulation 3 requires it to be reviewed when it may no longer be valid, or after a significant change.

Recording the significant findings

Employers with five or more employees must record the significant findings of their risk assessment. When a reassessment changes the controls, recording it keeps that record true.

Planning, managing and monitoring

Under CDM 2015 regulation 15(2), a contractor must plan, manage and monitor its work. It must be carried out without risks to health and safety, so far as is reasonably practicable.

Working alone

HSE expects employers to manage the risks before anybody works alone. A lone engineer’s reassessment on arrival is part of how those risks stay managed.

Where the phrase comes from

The term began in the UK fire and rescue service. HM Fire Service Inspectorate set it out in 1998, for the Home Office and the Scottish Office, in Dynamic Management of Risk at Operational Incidents. The guide explains how crews keep reassessing risk as an incident changes.

Great Britain and Northern Ireland

The regulations named here apply in Great Britain. Northern Ireland has its own equivalent legislation, and the same principle of reviewing an assessment when things change.

Published by Unibuild Technologies Limited · Updated . Safety references.

Questions

Asked about dynamic risk assessment.

How is a dynamic risk assessment recorded in Unibuild?
On the phone, where the work is, against the same job as the RAMS. Twenty questions are answered on site before work starts, so the record shows what was checked as well as who checked it. Photographs taken at the time are kept with it. The same record serves as a point of work risk assessment.
What record does it leave if somebody asks later?
What was checked, who checked it and when, with the photographs and the same audit trail as the RAMS. Dynamic risk assessments sit in one register with the RAMS, permits to work, toolbox talks and near miss reports for the job. Records are kept for seven years, and every record can be exported at any time.
How does the office find out what changed on site?
Dynamic risk assessment is live in the office portal as well as the app. What is recorded on site is filed against the job, so the contracts manager and the health and safety lead read it without waiting for paper.
What happens to the RAMS after a dynamic risk assessment?
If the change will last, the RAMS is revised as a new version and goes through the AI RAMS review before it is released. Everyone working to it signs again, in the app or through a link in any browser.
How does the supervisor know who to brief?
The QR clock-in shows who is on each site, live, including subcontract and agency operatives who scan the same poster. The supervisor briefs the change to the people actually there, and the reassessment is recorded against the same job.
Can lone workers use it?
Yes. A lone engineer records the dynamic risk assessment on their own phone on arrival, against the job. Where the firm uses one, a lone working permit is raised and closed out on the same phone.
Can a dynamic risk assessment be recorded with no signal?
Yes. The Unibuild app works on sites with no coverage, and what is recorded there syncs with the office the moment the phone is back in signal.
Can we use our own dynamic risk assessment questions?
Yes. Unibuild is built to each firm, so the dynamic risk assessment asks the questions your health and safety lead has written, in your own terms and for your own trades. Changes after go-live are included in the monthly fee.
Is there a dynamic risk assessment app?
Yes. Unibuild includes dynamic risk assessment in your firm’s own staff app for iPhone and Android, published under your company’s own name and icon. The same assessment is live in the office portal, recorded against the job with photographs kept alongside.
Is dynamic risk assessment included in the price?
Yes. It is part of the health and safety module, and one monthly figure per firm covers every module with unlimited users. There is no charge per assessment and none per person. Read how pricing works.
Ask for a quote

Tell us a little about the firm.
We do the rest.

Two minutes. A written figure by email, usually the same working day. Unlimited users, so everyone who records a reassessment is included.

Headcount
Areas of interest