For groundworks contractors

You priced the drawing.
You dug the ground.

Plant comes off hire the day the job ends. Day works are priced where they happen, with a signature on them. Muck away tickets land against the job rather than in a cab. Permits, cable avoidance certificates and operator tickets are at the gate before a bucket moves. Around thirty modules on one account, and a groundworks firm turns on the handful it needs.

Steel being fixed in a deep excavation, the work a groundworks gang is doing before anything is visible above ground
The office side

From the first permit to the final valuation.

Muck shift, drainage, foundations or hard landscaping: the ground differs, the office side does not.

  1. The dig is the part a groundworks firm already has right. It is what the job leaves behind that decides the margin: what the ground actually turned out to be, which loads went out, what the gang built that nobody priced, and whether any of it can be proved four weeks later when the valuation lands.

  2. Unibuild is construction management software for UK contractors, built inside a contracting business rather than sold into one. One account carries the labour run, plant and equipment registers, materials and stock, certification and training records, documents, day works, variations and applications for payment.

Built for groundworks

What groundworks requires, and what Unibuild provides.

A fit-out job and a groundworks job look alike in a database. They stop looking alike in the trench, at the weighbridge, and in the valuation four weeks later. Each requirement below is followed by what the platform does about it.

Priced in February, dug in June

You price a drawing and dig the real ground

A site investigation is a handful of holes and an opinion. What the machine finds decides the job, and it decides it after the price is fixed.

  • Rock turns a dig into breaking, and the hire clock keeps running
  • Water turns a trench into a pump, a sump and a support problem
  • Trees on clay push foundations deeper under NHBC, and the concrete doubles
  • A thin investigation forces either a five to ten per cent contingency or a low price that lives on variations
Variations raised where the ground is

A variation is raised on the phone in the trench, with photographs, levels and a signature against the job, at the moment the ground stops matching the drawing. The valuation then argues with a dated record rather than with somebody's recollection of June.

Nobody sent the off hire

The plant is on the clock, not on the job

Hired plant is charged by the day whether it turns a track or not, and the most expensive machine on any site is the one that is waiting.

  • A standing machine costs roughly £350 to £500 a day and produces nothing
  • An open ended hire stays over the weekend by default, and that is two days
  • Owned plant still carries recovery, servicing, insurance and examination
  • The off hire reference, not the phone call, is what stops the charge
Hire that stops when the job does

Hired plant is held against the job it stands on, and there is a standing view of jobs finishing with equipment still allocated to them. Nothing rings the hire desk for you. What changes is that the cost stops being invisible until the invoice arrives.

Paid by the load

What comes out is bigger than the hole

Excavated material bulks as it is dug, so the lorry count is never the volume on the drawing, and the tip ticket is the only receipt you are going to get.

  • Bulking runs roughly fifteen to thirty per cent depending on the material
  • Wet clay and peat weigh more, so the same hole costs more trips
  • Contamination can treble a disposal rate overnight
  • Transfer notes have to be kept two years, and three for hazardous
Every load ticketed to the job

Muck away is booked as a movement against the job as the wagon leaves, so fourteen loads are fourteen records rather than tickets in two cabs and a jacket pocket. The volume that gets invoiced is the volume that can be evidenced.

BS 5975 and a designer

The hole is a temporary works problem

Trench support, propping and battering are engineered temporary works under BS 5975, and they carry a paper trail most job software has nowhere to put.

  • A written design brief before anything is dug
  • An independent design check sized to the risk
  • A register carrying every item, whoever on site owns it
  • Permits to load and to dismantle, and a named coordinator
A register, not a folder

Temporary works designs, permits to dig and cable avoidance certificates sit against the excavation they belong to, with the version that was actually issued and who accepted it. The duty stays with the temporary works coordinator; what changes is that the paperwork is retrievable at the gate.

Covered the same day

Your best work is buried by Friday

Drainage runs, ducts, reinforcement and formation levels stop being inspectable the moment the backfill goes in. After that the photograph is the asset.

  • Pre backfill photographs are the only surviving evidence
  • Inverts and formation levels are checkable once, then never again
  • A defect found in year two is argued from records or from memory
  • The ganger who knows is often the one who has moved on
Photographed before the backfill

Dated photographs of bedding, surround, levels and connections attach to the job on the phone before anything is covered. Two years later the question of what went in the trench is answered from the record rather than from the gang who dug it.

Two registers, one gate

Operator tickets and machine regimes

The card in the operator's pocket and the examination on the machine are two separate expiry problems, and a principal contractor will ask for both at the gate.

  • CPCS and NPORS operator cards, checked before anyone starts
  • EUSR certification sitting behind the cable avoidance kit
  • LOLER only when the machine lifts, PUWER whichever it does
  • A quick hitch moved between machines is examined twice as often
Cards and machines on one grid

CPCS and NPORS cards sit on the training matrix and turn amber before they lapse, while LOLER examinations and PUWER inspections sit on the machine itself. The two registers the gate asks about are produced from one page.

Counted in the deployment Unibuild was built on, July 2026: one expiry page carrying 376 assets, 141 subcontractor certificates, 84 accreditations, 80 health assessments, 55 instruments and 9 vehicles.

Excavation and dig
Trench support
Aggregates and fill
Drainage
Concrete and reinforcement
Plant and attachments
Survey and setting out
Site setup
The week

An ordinary week, and the record it leaves.

Six entries from a groundworks firm's day book. Nothing here asks anybody to remember something at five o'clock on a Friday.

Monday, first dig

The investigation said firm clay and it is running sand below 1.2 metres. The variation is raised in the trench with photographs and levels on it, before the gang goes any further.

Priced as found
In the yard

The thirteen tonne machine is held against the job it came off, and the list of jobs finishing with plant still allocated is on one page on the Friday.

Off hired on time
Muck away

Fourteen loads go out and fourteen movements are booked against the job as the wagons leave, so the weighbridge and the valuation agree.

Volume provable
Wednesday

The drainage layout is revised. The extra run is raised as a variation on site, signed, and priced before the gang builds it.

Built and paid for
At the gate

The principal contractor wants the permit to dig, the cable avoidance certificates and the operator tickets. They come off the phone at the gate, in date.

Bucket moves
The valuation

The quantity surveyor asks what the day works were. Each one is a dated record with a signature and photographs against the job.

Agreed first time
What it must do

Eight requirements, and an honest answer to each.

Written from what actually costs a groundworks firm money, rather than from a feature list. Unibuild is around thirty modules on one account, and a groundworks firm turns on a handful of them.

Every machine, and whether it is still on hire

Assets and inventory holds each machine as its own record with a serial, a QR label, a purchase or hire status, a current location resolved from the last movement and a full service history. There is a standing list of jobs that are finishing with plant still allocated to them, which is the list that catches a machine nobody has thought about since the dig closed. The mechanism and the money are explained in off hire plant charges.

The change priced when it happens, not at the valuation

Onsite quotes and variations price the extra work where it happens, on the phone, by the person who found it. Rate valuations are measured on site, capped against the contract rates and signed by the client, and they feed applications for payment with retention and ageing already attached. The revised drainage run becomes a priced variation on Wednesday rather than an argument in six weeks.

The photograph taken before the backfill

Project and site management holds the site diary, the drawings and dated photographs against the job itself. A photograph of an invert level or a duct run taken from the phone before the backfill stays attached to that job, with the date and the person who took it. This is the single cheapest habit in groundworks and the one most consistently skipped.

Day works a quantity surveyor will accept

Day works are recorded against the job as they happen, with the labour, the plant and the materials on the same record and the site diary entry beside them. Documents and certificates then issues the sheet on your own letterhead. What changes is not the argument, it is that you turn up to it with a dated record rather than a recollection. Related reading: day rate against fixed price.

Operator tickets in date, at the gate

The training matrix holds every card and course per person and turns it red before it lapses rather than after. CPCS and NPORS categories, EUSR cable avoidance, confined space, first aid and the rest sit on one grid, and the person whose card expires next month is visible this month.

Examinations in date on the machine

Reminders and expiry watches twelve registers on one page, and inspection, service and test dates sit on the item itself in compliance and certification, so the machine and its evidence are the same object. Scanning the label on a breaker returns its history without anybody opening a filing cabinet.

The permit and the RAMS signed by the person digging

RAMS are signed on the phone at the gate against a frozen version, by the operative doing the work rather than by a supervisor on their behalf. Health and safety carries permits, COSHH assessments and near miss reporting, and toolbox talks are signed in the room by the people who were in it. See also permits to work.

The week replanned when the ground stops you

The labour run planner puts every person against every site, weeks ahead and colour coded by project, so a flooded dig moves two gangs in one view instead of nine phone calls. Where is everybody then shows who has actually scanned in, on a live map, which on a scattered civils job is a different question from where they were sent.

Governing clauseA record made while the trench is still open, beats ten made afterwards.
Site noticeWhere it stops

Four things Unibuild does not do today.

Every one of these has been asked for by a groundworks firm on a demonstration. They are published here rather than discovered in week three.

  1. Muck away by the load or the tonne

    There is no weighbridge feed and no reconciliation of tip tickets against a priced volume. Tickets can be attached to the job as documents and photographed on the phone, which at least puts them in one place. The arithmetic is still yours.

  2. A live feed from the machines

    Telematics is not ingested as standard, and we would rather say so than imply it. How hours and location arrive is decided at implementation: a prompt on the operator's daily check, a field on the service record, or a feed from the box you already pay for.

  3. A temporary works register

    The capability is named in the platform directory and is currently answered by a written guide rather than a module. For a firm appointing its own coordinator, treat a proper register as scoped tailoring and price it at the start.

  4. Take off from a drawing

    Estimating prices measured work from a dated library of materials, plant, labour and fit times, and it does that well. It does not measure quantities off a CAD drawing. You bring the quantities and it prices them.

Why this is hereHiding the gaps wastes both our afternoons. Ask about all four.
The yard

Materials schedule

Written for the trade rather than for any one firm. Most groundworks contractors will recognise seven or eight of these lines and ignore the rest.

What a UK groundworks contractor holds, and the tracking quirk in each line
KeyCategoryTypical itemsThe tracking quirk
Excavators360s from 1.5 to 30 tonne, mini and midi machines, buckets, quick hitchesLOLER only when the machine lifts, PUWER whichever it does. A quick hitch moved between machines is an accessory and is examined twice as often
Dumpers and transportForward tipping dumpers, tracked carriers, tippers, low loadersA daily pre use check by the named operator, and a ticket behind the person driving it
CompactionRollers, plates, trench rammersHand arm vibration magnitude belongs on the tool record, not on a manufacturer's website
LiftingTelehandlers, slings, chains, lifting beams, excavator lifting eyesGenuinely lifting equipment, so thorough examination at six or twelve months depending on the item
AttachmentsBreakers, augers, grabs, compaction plates, tilt rotators, riddle bucketsThey move between machines constantly, so who holds it matters more than where it is
Trench supportTrench boxes, sheets, props, waling frames, edge protectionEngineered temporary works with a design brief and a permit, not stock to be counted
Survey and setting outGPS rovers, base stations, lasers, levels, staffsCalibration dates, high value, and the first thing taken from a compound overnight
Small toolsBreakers, cut off saws, whackers, pumps, generators, lighting towersPAT where electrical, plus silica and noise assessments sitting behind the saws
Concrete and reinforcementReady mix by the cubic metre, rebar, mesh, spacers, formworkA load has hours, not days, and a pump is hired when the wagon cannot reach the pour
DrainagePipe and fittings, chambers, covers, gullies, attenuation crates, geotextileBought to a drawing that gets revised mid job, and the revision is exactly where the variation lives
Aggregates and fillType 1, sand, stone, imported fill, topsoilBought and moved by the tonne and reconciled against tickets, never counted
Site setupWelfare units, fencing, boards, signage, pumps, road platesPreliminaries that accumulate quietly for every week the programme runs long
Regulations

The regimes you work under

Buried services and unsupported excavations
are the two that cause the fatalities, and both
are judged on paperwork that existed before
the bucket went in. Kept factual.

What each regime asks of a groundworks contractor
RegimeWhat it requires
HSG47 and the permit to digThree stages: plan the work, locate and identify the services, then dig safely. A permit that relies only on record drawings is not compliant, because a physical sweep with a cable avoidance tool and a signal generator is required even where records exist. Routes are marked on the surface and hand digging applies within 500mm of a marked service. One measured programme recorded a 45 per cent fall in strikes once the generator was made mandatory alongside the locator rather than optional.
Temporary works, BS 5975-1:2024Excavation support, propping, falsework and façade retention are temporary works. The standard expects a written design brief, an independent design check sized to the risk, permits to load and to dismantle, and a register maintained by a named temporary works coordinator. The register is meant to be the single source of truth for the site and to carry every item regardless of which contractor owns it. See the temporary works register guide.
LOLER 1998 and PUWER 1998Worth being precise, because it is widely got wrong. An excavator that only ever digs is not lifting equipment and sits under PUWER, with an inspection and maintenance regime rather than a thorough examination. Used for lifting, it needs a thorough examination at least every twelve months. A quick hitch permanently attached is examined with the machine; moved between machines it is an accessory and the interval halves to six. Detail in the LOLER guide.
Operator competence: CPCS, NPORS and EUSRCPCS and NPORS are both approved under the CSCS Alliance and carry the logo on the red and blue card routes, so a principal contractor will accept either. The cable avoidance kit sits behind its own EUSR certification, which is separate from the machine ticket and expires on its own timetable. A lapsed card removes an operator from the gate, not from the payroll, which is the expensive part.
Waste duty of care, Environmental Protection Act 1990Describe the waste accurately, transfer it only to a registered carrier, satisfy yourself the destination holds the right permit, and keep the transfer note for two years, or three years for a hazardous consignment note. The duty sits with the producer, which on a muck away job is usually you rather than the haulier. Failure to produce the records is a fixed penalty or a prosecution. See waste transfer notes.
CDM 2015 and RIDDOR 2013On most work a groundworks firm is a contractor under CDM, with duties around planning, the construction phase plan and cooperation with the principal contractor. Under RIDDOR, the collapse of an excavation and a strike on a buried service are both reportable dangerous occurrences whether or not anybody was hurt, which catches firms out because nothing visible happened. The CDM 2015 guide carries the duty holder detail.
COSHH and respirable crystalline silicaCutting kerbs, blocks, paving and concrete releases silica dust, which is the reason a cut off saw is a health control problem rather than a noise one. It brings assessments, water suppression or on tool extraction, face fit testing for the masks actually issued, and health surveillance for the people regularly exposed.
Confined spacesDeep chambers, manholes, attenuation tanks and some headings meet the definition, and the risk is atmosphere rather than depth. It brings a specific risk assessment, a safe system of work, trained operatives, gas monitoring and rehearsed emergency arrangements, and it is a permit activity rather than a briefing.
Questions

Requests for information

The questions groundworks firms actually raise on a demonstration, answered on the record. Open one to read the response.

The marketWhat software do UK groundworks contractors use?+
Most run a combination rather than a system: a spreadsheet for the plant list, WhatsApp for the day to day, a wallet of tip tickets, and Sage or Xero behind it. Beyond that the market splits three ways. Plant and asset trackers handle the machines but not the job. Estimating and take off packages price the work but do not run the site. Full contractor suites do both and ask you to change everything at once. Unibuild sits in the last group, with the difference that modules are switched on as you need them rather than in one go.
Day worksCan it stop plant sitting on hire after the job has finished?+
It makes it visible, which in practice is most of the problem. Hired items are held against the job they sit on, and there is a standing list of jobs finishing with plant still allocated to them, so the machine nobody has thought about appears on a working list rather than on next month's invoice. Nothing rings the hire desk for you and nothing sends the off hire reference. What changes is that the cost stops being invisible until the invoice lands.
Plant hireDoes it record muck away, loads and tip tickets?+
Partly, and it is worth being plain about the limit. Tickets can be photographed on the phone and attached to the job, which puts them in one place with a date instead of in three cabs. There is no weighbridge feed and no reconciliation of ticket volumes against the volume you priced, so the arithmetic that proves a muck away variation is still yours to do. If that reconciliation is the reason you are looking, say so on the call and we will tell you honestly whether it is tailoring or whether something else suits you better.
Muck awayHow does it handle day works so a QS will accept them?+
The labour, the plant and the materials are recorded against the job on the day, with the site diary entry and any photographs beside them, and the sheet is issued on your own letterhead. It does not win the argument for you. It means you arrive at the argument with a dated record made by the person who was there, which is a materially different conversation from a foreman's notebook and a recollection four weeks later.
AdoptionCan it keep CPCS and NPORS cards in date?+
Yes, and that is one of the strongest fits for this trade. Every card and course sits on one grid per person, turning red before it lapses rather than after, and it holds the categories rather than just "has a card". The EUSR certification behind the cable avoidance kit expires on its own timetable, separate from the machine ticket, and that is the one most firms miss because it is nobody's obvious job to watch.
Temporary worksDoes it do temporary works registers?+
Not as a module today. The capability is named in the platform directory and is currently answered by a written guide, which is honest but is not a register. Documents, design briefs and check certificates can be held against the job in the meantime. If you appoint your own temporary works coordinator and need a register that BS 5975 would recognise, treat it as scoped tailoring and price it at the start rather than discovering the gap in month two.
TicketsWill the gangs actually use it?+
Only if what you ask of them is small. The realistic approach is to grant each operative three things on the phone: clock in, the RAMS signature, and photographs against the job. Everything else stays with the office and the foreman. Permissions are granted per person, so that is a configuration rather than a compromise. Firms that put the whole platform in every operative's hand in month one are the ones where adoption fails, and it fails everywhere for the same reason.
PricingCan it price measured work and handle remeasure?+
Yes for pricing, with a caveat on take off. Estimating holds your materials, plant, labour and fit times in one dated library, so a whole price list can be uplifted from a single box rather than edited line by line, and rate valuations are measured on site, capped against the contract rates and signed by the client. What it does not do is measure quantities off a CAD drawing. You bring the quantities and the library prices them.
SignalWhat happens with no signal, at the bottom of a trench?+
The field app is built for patchy coverage, which on rural civils and below ground work is the normal condition rather than an edge case. The practical advice for a demonstration is to test it on your worst site rather than your best one, because that is the site that decides whether the records are trustworthy six months later.
RolloutHow is it priced, and do you charge per operative?+
Users are unlimited and the price does not change when you take people on, which matters in a trade that flexes with the programme and the weather. There is no published rate card, because a six person gang running two modules and a forty person civils firm running twenty are not the same product. Pricing is worked out against the size and shape of the business on the demonstration. There is a 14 day free trial on your own data first, and migration of your existing plant list and people records is done for you.
Return slip

Come and try it on your own dig.

Half an hour, on your own jobs and your own plant list. Bring a live site and we will set it up in front of you. Unlimited users, never per seat, and fourteen days to try it without a card.

Bring
One live site and your plant list
Takes
30 minutes
Phone, UK hours
+44 7587 557546
Pays for itself
On the first machine off hired on time
WhatsApp us