Assets and inventory

Know what you own.
And where it is right now.

Unibuild tracks plant, tools and stores for UK contractors on one register. Every item carries what it cost, what it is worth and which job it is standing on. Signed for on handover, and back off the job before anyone forgets.

Plant, tools and stores tracked by value and location in Unibuild
Problems we solve

Eleven plant and stores problems. All eleven solved.

From the slings that missed their examination to the pallet bought twice.

11/11Solved in one module
Book a demo →
Solved

Lifting equipment still in use after its thorough examination lapsed

What goes wrong

The certificates sit in a box file in the yard, and the next dates live in one person’s diary. A set of slings misses its examination and keeps going out to site.

Under regulation 9 of LOLER 1998, lifting accessories and equipment that lifts people must be thoroughly examined at least every 6 months. Other lifting equipment needs one at least every 12 months, unless an examination scheme sets the interval.

How Unibuild solves it

In Unibuild, each item of lifting equipment carries its own examination date and certificate, and the QR label on it opens them on site.

An examination falling due is flagged 30 days out and the plant manager is alerted. If it lapses, the item goes out of service until it is examined again.

  • Flagged 30 days out
  • Out of service when it lapses
  • Certificate opens from the label

See it working in a 30-minute demo.

Solved

A faulty or untested tool going back out to site

What goes wrong

A 110V drill fails its test, or its test date passes, and it goes on the bench with a tag on it. The tag is the only record, and on Monday the drill is picked for the next job.

Regulation 5 of PUWER 1998 requires work equipment to be maintained in an efficient state, in efficient working order and in good repair. HSE guidance suggests testing 110V site tools before first use on site, then every 3 months.

How Unibuild solves it

In Unibuild, each tool’s test history sits against that tool and opens from its label. An item out of test is flagged before anybody signs it out.

Raising a repair takes the item out of service, so it is not offered for the next pick. It comes back only when a test result says it passed.

  • Test history on the tool
  • Flagged before it goes out
  • Back only with a pass

See it working in a 30-minute demo.

Solved

A tool theft claim with nothing to show what was taken

What goes wrong

Thieves empty a van overnight. By Monday the insurer wants makes, models, serial numbers and proof of purchase, and the firm has a rough memory of what was in the back.

Direct Line counted 26,724 reported tool thefts across the UK in 2025, at an average of £1,300 each. Most stolen tools are never recovered, so the claim is the only money back, and it pays on what can be proved.

How Unibuild solves it

In Unibuild, every tool and item of plant sits on the register with its serial number and value, so the schedule an insurer asks for is already written.

The register also shows which van or site each item was last signed out to, so the claim lists what was there, not what somebody remembers.

  • Serial numbers on record
  • Values ready for the claim
  • Last known location shown

See it working in a 30-minute demo.

Solved

A test instrument used after its calibration ran out

What goes wrong

A multifunction tester goes out of calibration in November, and nobody notices until July. Every certificate issued in between rests on readings that cannot be shown to be accurate.

The certification schemes ask for the evidence. NAPIT requires an up-to-date calibration certificate for each instrument, and a lapse can mean retesting work already signed off.

How Unibuild solves it

In Unibuild, every test instrument is on the calibration register with the person holding it and its calibration certificate. It turns amber inside 30 days and red once expired.

Where the instrument is named on each result, the certificates resting on a failed calibration are found in seconds.

  • Amber inside 30 days
  • Certificate on the record
  • Affected certificates traced

See it working in a 30-minute demo.

Solved

Hired plant still on hire after the job has finished

What goes wrong

The job finishes, the gang moves on, and the hired generator stays in the compound. The office thought site had rung the hire company, and site thought the office had.

Under the CPA Model Conditions many UK hire firms trade on, the hire period runs until the plant is back at the owner’s depot, nights and weekends included.

How Unibuild solves it

In Unibuild, hired items sit on the same register as owned ones, against the job they are standing on. The hire counts against that job from the day it is ordered.

One page lists every job past its end date with plant still allocated, so hire running on a finished job is seen that week, not on the invoice.

  • Hired kit against the job
  • Counted from the day ordered
  • Finished jobs with plant listed

See it working in a 30-minute demo.

Solved

Owned kit lost between sites and left on finished jobs

What goes wrong

The core drill went to one job, moved to a second with the gang, and stayed at a third when that one finished. None of the moves was written down.

Kit nobody can find is replaced at full price. By the time anybody notices the pattern, the first loss is months old.

How Unibuild solves it

In Unibuild, kit leaves the store on a delivery note signed on the phone, so every item belongs to a job and a named receiver. A move straight to the next site is signed the same way.

Every job finishing this fortnight with equipment still allocated is on one list, so the store books the collection before the site closes.

  • Signed for at every move
  • Site to site, still signed
  • Collected before the job ends

See it working in a 30-minute demo.

Solved

Materials from the stores and the vans never charged to the job

What goes wrong

Fittings, fixings and cable leave the unit or the van on the way to site, and nothing books them to the job. The job costing only ever sees what arrived on a merchant invoice.

On a fixed-price job the margin is then out by whatever came off the shelf. Across a year of jobs, that adds up quietly.

How Unibuild solves it

In Unibuild, each van is its own stock location alongside the store’s bins. Materials picked for a job come off the shelf or out of the van and onto that job on the day.

The job’s materials figure is current while the work is running, not weeks later when the invoices are coded.

  • Each van its own location
  • Booked to the job that day
  • Materials cost kept current

See it working in a 30-minute demo.

Solved

Paying supplier invoices for goods that never arrived

What goes wrong

The delivery note is signed at the gate in the rain, and the pallet is not counted. Four weeks later the invoice arrives for the full order and is paid, because nothing says otherwise.

A delivery note proves a lorry turned up. It does not prove what was on it, or that it matches what was ordered.

How Unibuild solves it

In Unibuild, the delivery is booked in against its purchase order as a goods received note, with the quantity and condition recorded before the driver leaves.

The supplier invoice is then checked against both the order and the goods received note, and what was booked in goes straight onto the stores record.

  • Booked in against the order
  • Short deliveries on record
  • Invoice checked both ways

See it working in a 30-minute demo.

Solved

Buying or hiring what the firm already holds

What goes wrong

Nobody can see the half pallet left over from the last job, or the spare tower two sites away. So the same thing is ordered again, or hired in.

The new order is a visible cost with an invoice. The item already owned is invisible, and the last job’s leftovers end up in a skip. The Green Construction Board names over-ordering and poor storage among the causes of materials waste.

How Unibuild solves it

In Unibuild, a request is checked against live stock before it reaches an approver. Where the item is already held, it is sent from stores rather than bought.

Leftovers come back onto the shelf and off the job when they are collected. Owned and hired plant sit on one register, with where each item is standing.

  • Stock checked before buying
  • Leftovers back on the shelf
  • Owned and hired on one register

See it working in a 30-minute demo.

Solved

Damaged kit with no record of where it happened

What goes wrong

A generator comes back to the yard with a smashed panel. It has been on three jobs since anybody last looked at it, so there is no record of where it happened.

With no record, there is no recharge to the client or the subcontractor, and the repair comes out of the firm’s own margin. On hired kit, the standard CPA hire conditions make loss and damage the hirer’s cost.

How Unibuild solves it

In Unibuild, damage is reported on the phone where it is found, against the job it happened on, with photographs and a cost from your own spares list.

It can also be flagged on the collection line as the kit is picked up, so a recharge is argued from a documented incident.

  • Photographed where it happened
  • Costed from the spares list
  • Recorded against the job

See it working in a 30-minute demo.

Solved

A fixed asset register rebuilt from old invoices at year end

What goes wrong

The accountant asks for the plant and tools the firm owns, with costs and dates, and the broker wants the same with values at renewal. Somebody rebuilds both from old invoices over a day.

Section 386 of the Companies Act 2006 requires a company’s accounting records to contain a record of its assets. A list rebuilt from invoices misses kit written off but still in the yard, and keeps insuring kit that went missing.

How Unibuild solves it

In Unibuild, every item you own is on the register with its purchase price, date, expected life and residual value, and depreciation is carried in the platform.

The listing the accountant asks for is a report, and a valuation at any date can be reproduced rather than recalled.

  • Cost and date on every item
  • Depreciation carried
  • Value at any date

See it working in a 30-minute demo.

Yard to site and back

Every stage of a thing leaving your store.

  1. Hold it

    Asset registerCatalogueBin locations
  2. Ask for it

    RequestsKitsApproval
  3. Pick it

    Serial numbersLive bin stockNo over-allocation
  4. Sign it out

    Delivery noteSignatureStock ledger
  5. Get it back

    CollectionsSite to siteDamage flag
  6. Fix it

    RepairsDamage reportsRecharge
Where the value leaks

Everything you own is on a list. Nobody trusts the list.

Materials and plant are a large slice of the money and the least visible. The stock figure was right in January. The plant register is a spreadsheet somebody kept until they left.

Monday, goods in
Materials arrive at the yard. Nobody books them in against the order, so the order stays open for a month.
Stock drift
Job completes
Tower scaffold and two dryers still standing on a finished site. Nobody is tracking what is out.
Plant walks
Stores, 07:40
Delivery promised from stock that is not actually on the shelf. The van leaves half empty.
Lost morning
Back at the yard
Something comes back broken. No record of which site it was on, or who was using it.
Cost absorbed
Insurance renewal
Broker asks for a schedule of plant with values. Someone rebuilds it from memory over a day.
A day gone
Purchasing
The same consumable ordered again, because nobody could see there was a pallet of it already.
Double spend
The drain Plant that walks, stock that drifts, damage nobody can recharge Three symptoms · one cause
A stores spreadsheet against the Unibuild register
The questionSpreadsheetUnibuild
How much is on the shelfThe last figure somebody typedQuantities held per named bin
Where the plant isWhoever last updated the sheetThe job it was signed out to
What left the storeA note, if anybody wrote oneA delivery note with serials and a signature
What is still on siteFound months laterListed for every job that is finishing
What came back brokenNo record of the jobA damage report with photographs and a cost
Value at a dateRebuilt from memoryReproduced from the stock ledger
What is in the box

Nine capabilities, one module, built around the store, not the spreadsheet.

Running a stores operation since 2016, feeding a central yard out to dozens of live sites and getting it all back again. Unibuild is bespoke construction software, so the module is shaped to your own stores process. Changes asked for after go-live are included in the monthly fee.

Asset
register

Plant

Every item of plant and access equipment serialised, valued and located. The catalogue doubles as the schedule your insurer asks for.

  • Serial and plant number
  • Purchase and hire value
  • Residual value and life
  • Current job or store
Inside · Register, ValuesLive

Stock
ledger

Ledger

A continuous record that is only ever added to, never overwritten. Every movement, whatever caused it, in one history.

  • Goods in, deliveries out
  • Collections and returns
  • Repairs and corrections
  • Running balance per item
Inside · Movements, HistoryLive

Bin
locations

Shelf

Quantities held per named bin, so the number on screen is the number on the shelf. Picks can split across bins and can never over-allocate.

  • Per-bin quantities
  • Split a pick across bins
  • Out-of-stock warning
  • Comes back to the same bin
Inside · Bins, BalancesLive

Kits

Bundle

A named bundle of materials, plant and access equipment you always issue together, with its own labour allowance. Requested and issued as one line.

  • One line, whole bundle
  • Labour allowance built in
  • Shared with estimating
  • Consistent every time
Inside · Kit builderLive

Delivery
notes

Out

The picker walks each line, choosing the serial number going out and the bin it comes from. Signed for on receipt.

  • Real serials, real bins
  • Partial dispatch handled
  • Receiver name and signature
  • Closes itself when filled
Inside · Pick, DispatchLive

Collections
and transfers

Back

Bring it back to the store, or move it straight to the next job without a pointless round trip. Damage can be flagged on the line as it is picked up.

  • Store or site to site
  • Damage flag at collection
  • Signed collection note
  • Stock credited back
Inside · Collect, TransferLive

Repairs

Fix

Raised against a specific item, which logs it out of active service so it cannot be issued while broken. Closed only when a test result is recorded.

  • Out of service on raise
  • Parts and hours consumed
  • Pass or fail test result
  • History per asset
Inside · Fault, TestLive

Damage
reports

Evidence

Captured on the phone where the damage was found, with the job, the parts and a cost from a maintained spares list.

  • Photographs and video
  • Itemised damaged parts
  • Estimated cost on the spot
  • Signature captured
Inside · Report, RechargeLive

QR
labelling

Scan

Scan the label on the machine and its register entry, service history and certificates open on the phone.

  • Asset and project codes
  • Weatherproof when laminated
  • Opens the full history
  • Same code for everyone
Inside · Labels, PostersLive
What is actually tracked

One module.
Six registers underneath it.

Each is a real register that records who did what and when, all reading one catalogue, so an item means the same thing everywhere.

Stock

MaterialsConsumablesUnits of measureBin locationsStock ledgerKits

Plant & access

Serial numbersPlant numbersPurchase valueHire rateResidual valueExpected lifeDepreciationCurrent location

Movement

Delivery requestsDelivery notesCollection requestsCollection notesGoods receivedSupplier returnsSite transfers

Condition

Damage reportsRepairsSpare parts listTest resultRepair historyOut of service

Compliance

PAT testingCalibrationMaintained assetsPPM schedulesService historyCertificates

Evidence

PhotographsVideoOn-screen signatureQR labelsWho did what and whenBranded PDFs
396 power tools individually registered in Unibuild
396Power tools individually registered
376Maintained assets under contract
2016Tracking stock since

Counted in the construction deployment, July 2026. The site services deployment has tracked its stores since 2016.

A Tuesday in the stores

One day, and the register
never went out of date.

A central yard feeding live jobs, which is the shape this half of the platform was built for. Every event below moves the stock figure, the location or the condition record as it happens, rather than at a stock take in March.

06:50Request

Supervisor asks for tomorrow's kit from site.

Raised on the phone against the job: materials, two items of plant and a whole kit. It reaches the store before the yard has opened.

Delivery requests
08:15Approved

Store approves it, and the request locks.

Free to edit while it was a draft. Once picking starts it locks, so what has already gone out is protected from a late change.

Approval flow
09:30Picked

Picker chooses the actual serials, splits the materials.

The screen offers the in-stock serial numbers to pick from, and shows every bin holding the material with its quantity. It cannot over-allocate.

Bins + Serials
11:05Signed

Delivered to site, signed for on the phone.

Receiver's name and signature captured. The plant reassigns to that job, the materials come off the ledger and out of the bins they were picked from. No posting step to forget.

Delivery notes
14:20Damage

Operative photographs a damaged unit where it happened.

Job, location, the damaged part, a recommended repair and an estimated cost from the spares list. Photographs, video and a signature attached at the moment of discovery.

Damage reports
16:00Repair

Item raised for repair and taken out of service.

Logged out of active service the instant the repair is raised, so it cannot be issued to the next job while it is broken. It returns when a test result says it passed.

Repairs
17:30Close

Store manager works the upcoming collections list.

Every job finishing this fortnight with equipment still allocated to it, on one screen. Two pickups booked. Nothing left behind to discover in six months.

Upcoming collections
No card, no lock-in

Bring us the list
you cannot trust.

14-day free trial
Your real yard, your real plant, your real sites.
Free migration
From your spreadsheet, your paper cards, your old system.
We label the yard with you
QR labels generated, printed and applied on a screen-share. How a label differs from the clock-in poster, and what a scan of either proves, is in QR codes on construction sites.
Cancel by email
One sentence to success@unibuild.co.uk. Done.
UK data, UK support
UK office, working hours, real phone number.
Unlimited users
The yard, the site, the office, the directors. Same price.
Asked in every demo

What a stores manager
asks in the first ten minutes.

The full list lives at /faqs. These come up in every conversation about plant and stock.

We already have a stores spreadsheet. What does this actually add?
A spreadsheet records what somebody remembered to type. This records what physically moved, because the movement and the record are the same action: the picker selects the serial number, the receiver signs, the ledger posts. It also tells you which bin the stock came out of, which no spreadsheet does, and it will refuse to promise materials that are not on the shelf.
Can site staff request materials themselves?
Yes, and that is the intended route. Requests are raised on the phone by the people who know what they need, then approved and picked by the store. They raise them in your firm’s own staff app, published on the App Store and Google Play under your company’s name and icon. It removes the phone call and the guess about what was meant. On jobs that came from a priced estimate, the request can pull from what was actually quoted, so what is sent lines up with what was priced.
How does it stop plant being left on finished jobs?
There is a standing view of every job that is finishing with equipment still allocated to it, as a working list the store goes through. The problem was never that people did not care. It was that nobody could see what was still out there.
What happens when something comes back broken?
It can be flagged as damaged on the collection line at the point it is picked up, which feeds straight into the damage and repair process. The report carries the job, the location, photographs, video, the itemised parts and an estimated cost, captured where the damage was found. That is what a recharge conversation or an insurance claim needs, and it is almost never what firms actually have.
Does it handle partial deliveries?
Properly, yes. Each line tracks received quantity against requested quantity, one request can be filled across several notes, and the request marks itself delivered once every line is complete. There is no manual completion step for somebody to forget, which is where most stock systems start drifting.
We move kit straight between sites. Does that work?
Yes. A collection can transfer directly to another site rather than returning to the central store. Equipment does not make a pointless round trip to be booked in and straight back out again. The asset reassigns to the receiving job and the signed note records the handover either way.
Can we put a value on the stock we are holding?
Yes. Every item carries a purchase value and, where it applies, a hire rate and a residual value, so an inventory valuation is a report rather than a weekend. The figure follows the ledger, which is only ever added to and never overwritten, so a valuation at a given date can be reproduced rather than recalled.
How do UK contractors track LOLER thorough examinations and plant inspections?
Against the item of plant itself, rather than in a diary or a box of certificates. In Unibuild each asset holds its examination and inspection dates, test results, calibration, certificates and repair history, and the QR label on the machine opens that record on site. Pre-use checks and defects are recorded on the phone with photographs. An examination falling due is flagged 30 days out, and an item out of test is flagged before somebody signs it out. The LOLER and PUWER registers sit in the health and safety module.
What software tracks plant and stores across construction sites?
Unibuild’s assets and inventory module, built for a central yard feeding live sites. Every item of plant carries its serial number, value and current job, and stores are held per bin, so the figure on screen is the figure on the shelf. Site staff request materials and plant on the phone, the store picks against real serials and bins, and the receiver signs on delivery. Collections, site-to-site transfers and repairs all post to the same stock ledger.
What stock control software should a UK building contractor use?
Software that moves the stock figure when the stock moves, and books it to the job. Unibuild does that. Goods received against an order add to the ledger, delivery notes picked by bin and serial take stock off, and collections credit it back. Picks cannot over-allocate, kits issue a whole bundle as one line, and the ledger is only ever added to. So a stock valuation at any date is a report you can reproduce, not a weekend of counting.
Ask for a quote

Tell us a little about the firm.
We do the rest.

Two minutes. A written figure by email, usually the same working day. Unlimited users, and no charge per item on the register.

Headcount
Areas of interest