- Fire door records
- Built to evidence fire risk assessment remedial work, not to run Fire Safety (England) Regulations 2022 regulation 10 periodic checks. The document is titled Record of Maintenance or Repair and opens with the language of work completed. There is no check frequency, no due date, no building height and no communal versus flat entrance distinction. For a fire door remedial contractor it fits precisely. For a landlord needing quarterly and annual checks, the register and the labelling are the right foundation and the periodic check itself would be built.
- Fire door check items
- Gaps and clearances, intumescent and smoke seals, hinges, self closers, glazing, signage, leaf and frame condition, ironmongery and drop down seals all appear consistently in the live data, because your operatives write them into the description of work. None of them is a structured tick box with a pass or fail today. Turning that consistent vocabulary into a structured checklist is a short job precisely because the vocabulary is already consistent.
- PAT and the instrument that tested it
- A PAT record holds the readings, the result and who entered it. It does not name the test instrument. So if an instrument were found to have been out of calibration, the platform as it stands could not tell you which of your records rest on it. Neither can a spreadsheet, which is the fair comparison, but the platform is one field away from being able to. The calibration register already holds instruments with serial numbers and expiry dates, so adding a validated instrument selector to the test record closes the chain. This is the first thing we would scope with you.
- Calibration
- An out of calibration instrument is flagged, never blocked. It turns red on the register, appears on the reminders dashboard with a count, and can be emailed to the person holding it. Nothing in the platform prevents its use, because nothing currently knows which job an instrument was taken to. Blocking is only meaningful once an instrument can be selected on a piece of work, so the sequence is: link first, then gate.
- Emergency lighting
- The checklist records the date of testing, the operative, the devices checked, the type of test, whether all fittings worked and the load test result, signed by two parties and issued as a PDF. It records one test event rather than a fitting by fitting schedule, the test type is free text rather than a controlled monthly or annual selection, and there is no reminder for the next test due. It is a usable test record. It is not a complete BS 5266 log book.
- Water hygiene
- The chlorination certificate, the water testing register and the filter change register are live in the site services deployment and empty in the construction one. We would demonstrate them in the deployment where they carry records rather than showing you empty screens and calling it a feature.
- RIDDOR
- Unibuild records and evidences incidents, including through a public form reached by scanning the code on a site poster so somebody with no account can report a hazard. It does not submit anything to the HSE. Deciding reportability and making the report remain the responsible person's duty, and we will never blur that line.