- 01Retained UK F-Gas Regulation
- Refrigerant type, charge weight, GWP and the calculated carbon dioxide equivalent held per asset, with the reference charge for the five tonne threshold shown for the selected refrigerant. A dated logbook of work, engineer, certificate number, gas added and bottle serial. Dated leak check records with the engineer, the ACRIB card number, direct or indirect test, result and next test date. It prints as a REFCOM presented record log book. You set the leak check frequency band, and the register carries the due dates forward.
- 02SFG20
- Unibuild holds your own SFG20 schedule documents against each individual asset, with notes, visible to the engineer on site and to your client in their portal, and reproduced in the asset report. A live feed from BESA's service, with task lists and task level completion against SFG20 references, is built on request on top of the same register.
- 03PUWER 1998, regulations 5 and 6
- The register is the maintenance log: an asset record per item, a planned programme against it, and a dated service history of every visit with the engineer named, the work described and photographic evidence attached. Visual inspection is a schedulable service type in its own right.
- 04Regulatory Reform (Fire Safety) Order 2005 and Fire Safety Act 2021
- An itemised register of the fire doors and fire equipment in the building, each individually identified, with each remedial intervention producing a signed, dated document naming the person who carried it out and photographs of the finished condition. Flat entrance doors are registered exactly as communal doors are.
- 05Fire Safety (England) Regulations 2022, regulation 10
- The module holds fire door and fire asset records with photographs, locations and dates. The regulation 10 check regime runs on the same register, with each door’s next check due date and the communal and flat entrance doors on their own frequencies.
- 06ACOP L8 and HSG274
- Cold water storage tanks, calorifiers and booster sets sit in the register with their schedules and service history. The specialist water hygiene registers hold the monitoring dates per client, per project and per named location, warned thirty days ahead. The risk assessment and the written scheme of control are signed off by your competent person.
- 07Pressure Systems Safety Regulations 2000
- Relevant wherever the plant these registers hold includes a pressure system, such as a steam calorifier or an air receiver. Unibuild holds the asset, its schedule, its service history and its examination reports, with the written scheme of examination and the examination due dates on the same register.