- Retained UK F-Gas Regulation
- Refrigerant type, charge weight, GWP and the calculated carbon dioxide equivalent held per asset, with the reference charge for the five tonne threshold shown for the selected refrigerant. A dated logbook of work, engineer, certificate number, gas added and bottle serial. Dated leak check records with the engineer, the ACRIB card number, direct or indirect test, result and next test date. It prints as a REFCOM presented record log book. It does not derive your leak check frequency band and it does not chase an overdue check.
- SFG20
- Unibuild holds your own SFG20 schedule documents against each individual asset, with notes, visible to the engineer on site and to your client in their portal, and reproduced in the asset report. It is a document and reference store. It is not a live feed from BESA's SFG20 service, it does not pull task lists or revisions, and task level completion against SFG20 task references is not recorded. Your buyers know exactly what SFG20 is and will test this, which is why it is written this way.
- PUWER 1998, regulations 5 and 6
- The register is the maintenance log: an asset record per item, a planned programme against it, and a dated service history of every visit with the engineer named, the work described and photographic evidence attached. Visual inspection is a schedulable service type in its own right.
- Regulatory Reform (Fire Safety) Order 2005 and Fire Safety Act 2021
- An itemised register of the fire doors and fire equipment in the building, each individually identified, with each remedial intervention producing a signed, dated document naming the person who carried it out and photographs of the finished condition. Flat entrance doors are registered exactly as communal doors are.
- Fire Safety (England) Regulations 2022, regulation 10
- The module is not built to regulation 10 and we will not sell it as if it were. It holds no check frequency, no next check due date, no building height and no communal versus flat entrance distinction. What it holds is a signed and photographed record of work carried out on a named door, which is remedial and maintenance evidence rather than a periodic check record. The register, the labelling and the client portal are the hard part and they exist. The periodic check itself would be built as part of your implementation.
- ACOP L8 and HSG274
- Cold water storage tanks, calorifiers and booster sets sit in the register with their schedules and service history. The specialist water hygiene registers hold the monitoring dates per client, per project and per named location, warned thirty days ahead. Unibuild does not write your risk assessment or your written scheme of control.
- Pressure Systems Safety Regulations 2000
- Highly relevant to the plant these registers actually hold, which includes expansion vessels, calorifiers, plate heat exchangers and pressurisation units. Unibuild holds the asset, its schedule, its service history and any uploaded examination reports as attachments. It does not model a written scheme of examination as a structured object and does not calculate examination due dates.