- Electricity at Work Regulations 1989
- Regulations 12 and 13 require suitable means of cutting off the supply and isolating equipment, with adequate precautions against equipment made dead becoming charged. The permit records the declaration that the equipment has been made dead, isolated and earthed, identifying the specific points of isolation, the specific points of earthing and where danger signs are placed.
- BS 7671, as context only
- Unibuild does not produce an EIC, an EICR or a Minor Works Certificate, and we will not imply that it does. It handles everything around the certificate: the job, the labour, the client and site record, the isolation permit, the test instrument and its calibration status, the document store and the audit trail.
- ACOP L8 and HSG274
- The water hygiene and legionella regime. Unibuild holds the monitoring dates the written scheme produces, per client, per project and per named location, assigned to a person, warned thirty days ahead and turning red once late. The assessment and the written scheme remain the work of your competent person.
- BS 8558 and BS EN 806-4
- Disinfection before a system is put into service. The chlorination certificate names the standard worked to, records the contact time, and holds the before and after readings with the bacterial sample taken after flushing.
- PUWER 1998
- Work equipment suitable, maintained in efficient working order, and inspected where safety depends on it. Every item in the plant holding is an individual record with its own service history and its own repair history.
- LOLER 1998
- Where you hold lifting accessories, the movement record identifies which physical unit was on which site and when. Being straight with you: there is no dedicated thorough examination register with its own statutory intervals today, and for a business holding slings or chain blocks that is scoped work rather than a shipped feature.
- CDM 2015
- You are a contractor on somebody else's site. Project records carry the F10 notification flag, RAMS and construction phase plans are held against the job, and permits, toolbox talks and site records all attach to the same project.
- Calibration traceability
- Every test instrument with its make, model, serial number, the engineer holding it and its calibration expiry, warned thirty days out and coloured red once passed. The calibration house's certificate is attached to the record that carries the date.