Skip to content
Temporary site services

Built for temporary
site services, by one.

Unibuild was written in 2016 for a UK provider of temporary power, site electrics, temporary water and welfare, and it has run that business every working day since. Tendering on measured rates, valuing the work on site as it proceeds, moving plant between a central store and every live job, and turning all of it into an application for payment.

in production since 2016 measured work signed on site stores to site signed both ways your sector, not a template
Your week

You tender on rates, so the
margin is decided before
anybody turns up.

Then the work gets measured on paper, or not at all. By the time the application goes in, somebody is rebuilding a month from memory and a diary.

Tender stage
Priced from a workbook nobody has reviewed since 2023, because reviewing it is nobody's job.
Margin set blind
Week three
Work measured on a scrap of paper in a van. The paper does not make it back before Friday.
Never billed
Any Tuesday
A tower is on two jobs at once according to the spreadsheet, and on neither of them in reality.
Bought again
Month end
The valuation is rebuilt from recollection, then disputed, because nothing was signed at the time.
Argued down
Back at the store
Something comes back broken and nobody can say which site it came from.
Absorbed
Friday, 16:10
The principal contractor wants the certificate for the supply you installed last month. Today.
Two hours gone
The pattern Every one of these is a record that was never made Not a person who did not care
What matters most to you

Six parts of the platform,
in the order your business
would actually feel them.

All six are proven in a temporary site services business, because that is the business the platform grew up inside. This is unusual and it is worth saying plainly: you would not be the first firm of your type on it.

The estimating
engine

01

Sectional build ups priced from your own catalogues and price lists, with kits that price a whole assembly on one line.

  • Markup snapshotted onto the estimate at creation
  • A later rate change cannot alter a tender already issued
  • Per line locking, so a bulk reprice leaves negotiated rates alone
  • Estimate templates and section autofill
Proven since 2016Live

Rate
valuations

02

The measure captured on site in the week the work was done, by the person who did it, priced from that contract's own rate card.

  • Claimable hours capped at the estimated allowance
  • The cap applies in the app, at the point of entry
  • Client signs on the screen before anyone leaves site
  • Photographs attached to the claim
The operational coreLive

Stores, deliveries
and collections

03

Picking against the actual bin quantities and the actual serial numbers you hold, not against a figure that was right in January.

  • A pick can split across bins and cannot over allocate
  • Receiver signs on handover
  • Confirming the note moves the stock and the asset location
  • Site to site transfers without a pointless return trip
Signed chain of custodyLive

Applications
for payment

04

Assembled from work already measured and already approved, rather than rebuilt every month from four sources.

  • Retention held as a running figure
  • The previously certified position calculated
  • Aged debt bucketed and grouped by manager
  • Approved work never claimed, surfaced as a queue
Measured work to cashLive

Safe isolation
permits

05

The four part structure your engineers will recognise as the real thing: authorise, accept, sign off, cancel.

  • Points of isolation and points of earthing identified
  • Switching schedules for sequenced isolations
  • Office configurable permit questions
  • Limitation of access forms
Temporary electricalLive

Chlorination and
water testing

06

Disinfection certificates with the readings recorded as individual pass or fail results, and the monitoring dates watched.

  • Free chlorine, total chlorine and turbidity, before and after
  • Contact time and the standard worked to
  • Tester and acceptor both sign
  • Water testing and filter changes on a warned schedule
Temporary waterLive
One job, start to finish

Tendered, installed, measured,
collected and paid for,
on one record.

  1. 01

    Price it

    Sectional build upKitsMarkup classes
  2. 02

    Win it

    Estimate to jobRate cardPrice list assigned
  3. 03

    Deliver it

    Picked on serialsSigned noteStock moves
  4. 04

    Measure it

    On site, that weekCapped to allowanceClient signature
  5. 05

    Collect it

    Upcoming collectionsDamage flaggedBack into stock
  6. 06

    Get paid

    ApplicationRetentionAged debt
The join The measure that was signed on site is the measure on the application Nothing is rebuilt
The regimes you live under

Temporary electrical and
temporary water carry their
own compliance estate.

Unibuild records, evidences and prompts. It does not make anybody compliant, and the duty stays exactly where it always was.

Electricity at Work Regulations 1989
Regulations 12 and 13 require suitable means of cutting off the supply and isolating equipment, with adequate precautions against equipment made dead becoming charged. The permit records the declaration that the equipment has been made dead, isolated and earthed, identifying the specific points of isolation, the specific points of earthing and where danger signs are placed.
BS 7671, as context only
Unibuild does not produce an EIC, an EICR or a Minor Works Certificate, and we will not imply that it does. It handles everything around the certificate: the job, the labour, the client and site record, the isolation permit, the test instrument and its calibration status, the document store and the audit trail.
ACOP L8 and HSG274
The water hygiene and legionella regime. Unibuild holds the monitoring dates the written scheme produces, per client, per project and per named location, assigned to a person, warned thirty days ahead and turning red once late. The assessment and the written scheme remain the work of your competent person.
BS 8558 and BS EN 806-4
Disinfection before a system is put into service. The chlorination certificate names the standard worked to, records the contact time, and holds the before and after readings with the bacterial sample taken after flushing.
PUWER 1998
Work equipment suitable, maintained in efficient working order, and inspected where safety depends on it. Every item in the plant holding is an individual record with its own service history and its own repair history.
LOLER 1998
Where you hold lifting accessories, the movement record identifies which physical unit was on which site and when. Being straight with you: there is no dedicated thorough examination register with its own statutory intervals today, and for a business holding slings or chain blocks that is scoped work rather than a shipped feature.
CDM 2015
You are a contractor on somebody else's site. Project records carry the F10 notification flag, RAMS and construction phase plans are held against the job, and permits, toolbox talks and site records all attach to the same project.
Calibration traceability
Every test instrument with its make, model, serial number, the engineer holding it and its calibration expiry, warned thirty days out and coloured red once passed. The calibration house's certificate is attached to the record that carries the date.
What it does not do

Four things to know
before you talk to us.

You will find these in a demonstration, so you may as well find them here first.

01
No CIS handling
No UTR, no verification number, no deduction, no monthly return. CIS sits with your accounts package today. It is a well defined piece of work rather than a research project, and worth raising early if it matters to you.
02
No payroll export
Hours, overtime multipliers and a dated cost rate per person are all held in the right shape. What there is not is a payroll file. It is the most common first piece of tailoring we do, precisely because the hard part is already done.
03
The apps need a connection
There is no offline queue. Most forms let the engineer enter the real date and time so work can be written up once back in signal, but the app does not work at the bottom of a lift shaft. We would rather say so now.
04
Client portal is the other deployment
A full client portal exists and is proven, but in the construction deployment rather than in the site services one. If giving your own customers a login matters to you, it is real and demonstrable, and we would show it to you there rather than pretend it is switched on here.

Everything in the six cards above is running in a temporary site services business today. These four are not.

Questions from your sector

Asked by people who
supply site services.

Our rates differ from job to job. Does that work?+
That is the normal case here rather than the exception. Every job carries its own labour rate card across all rate types, its own markup and its own assigned price list. Two jobs running the same week value the same hours differently, correctly, without anybody remembering which is which.
What stops a supervisor claiming more than was priced?+
On jobs that came from an estimate, the claimable hours for each section are capped at the estimated allowance less whatever has already been approved. A claim inside the allowance can approve automatically. One that exceeds it is refused in the app at the point of entry, before it becomes an argument with your client's surveyor. Over claiming is prevented rather than corrected.
How do we stop plant being left on finished jobs?+
There is a standing view of jobs that are finishing with equipment still allocated to them. It is a working list the store goes through rather than a notification. That is usually enough, because the problem was never that people did not care, it was that nobody could see what was still out.
Our clients will not sign on a phone.+
Some will not, and the valuation still works without a signature. Most site representatives sign readily when they are being shown exactly what is being claimed, for work they have just watched being done. The signature is captured with their typed name, the date and space for a remark, so it reads as a considered acceptance rather than a scrawl on a pad.
We already have a stores spreadsheet. What does this add?+
A spreadsheet records what somebody remembered to type. This records what physically moved, because the movement and the record are the same action: the picker selects the serial number, the receiver signs, and the ledger posts. It also tells you which bin the stock came out of, which no spreadsheet does.
How much of our price file do we have to load?+
Honestly, this is the part of an implementation that takes real client effort, and any supplier telling you otherwise is selling. Your existing file is mapped to categories, units and suppliers, imported, and then reviewed. Unibuild then measures the result for you: a page counts every item still missing a fit time, a price or a rate, so completeness is a number you can chase rather than a feeling.
Is this really built for our sector, or adapted to it?+
Built for it. The estimating engine, the rate valuations, the bin locations, the signed delivery and collection notes, the damage recharge and the retention engine all exist because a temporary site services business needed them and asked for them, one problem at a time, over a decade. A second business in construction contracting now runs on the same platform using a different half of it, which is the evidence that it adapts as well as fits.
No card, no lock-in

If your next valuation is not
signed on site and on the
application, do not pay us.

30-day free trial

Your real rates, your real jobs, your real store.

Free migration

Price lists, plant register, open jobs, retention balances.

Demonstrated in your sector

Shown on the system that runs a site services business.

Cancel by email

One sentence to [email protected]. Done.

UK data, UK support

UK office, working hours, a real phone number.

Unlimited users

The store, the site, the office, the directors. Same price.

Next step

Bring one job you
measured badly.

The point Work that gets measured gets billed Everything else is hope