Skip to content
Health & safety · Module 02

The paperwork
that wins tenders,
and holds up at audit.

CDM 2015, RIDDOR, RAMS, permits, COSHH, LOLER, PUWER, Work at Height — the regulator's whole alphabet, in one module. Sign the toolbox talk on phone, raise the near-miss in twenty seconds, file the lift plan against the project. The HSE evidence pack writes itself in the background.

CDM 2015 baseline RIDDOR-ready exports Unlimited users Audit trail unfakeable
§ 01Where the paperwork breaks

Eight folders.
One HSE letter.
And nobody can find the RAMS.

Most UK SMEs we onboard have safety paperwork scattered across Dropbox, the foreman's phone, a paper folder in the cabin and one director's email. It works until somebody asks for evidence. Then it does not.

Tuesday, 14:02
Lift plan signed on a clipboard. Photo of it lives on a foreman's phone.
No audit trail
Wednesday morning
Near-miss reported in WhatsApp. Lost in scroll. No investigation. No learning.
Safety culture
Friday, 16:30
RIDDOR window closing in 10 days. Office manager unsure if it qualifies.
£20k fine risk
Tender week
Client wants the CDM 2015 file. It lives in three places and a paper folder.
Bid risk
Plant yard
LOLER cert for the telehandler in a box. Expired last Tuesday. Nobody knew.
HSE exposure
Audit, day one
Auditor asks for COSHH register. Spreadsheet last updated by someone who left.
£127k exposure
Rolling
Training matrix in Excel. Cards expire silently. Nobody flags it until tender.
Compliance gap
Toolbox talks
Talks delivered. Signatures on paper. Paper lost in van. No record.
Evidence gap
// HSE letter, by the time it lands You have ten working days to produce the file.
With Unibuild, the file is one PDF, one click. See what is in the box →
§ 02What is in the box

Nine capabilities.
One module. Built
around the regulator's order.

Every UK firm we have onboarded was already doing this work on paper, on Excel, in the foreman's head. We just gave it a single shape, with the audit trail welded on.

01

Incidents & RIDDOR

Accidents, near-misses, dangerous occurrences. Reported on phone in twenty seconds, investigated, closed out, exported as a RIDDOR-ready PDF.

AccidentNear-missRIDDORPhotosStatus flow
02

Permits to work

PTW, lone working, hot work, work at height, ladder, steps. Templated, numbered, signed on phone. PDF for the wall, audit trail for the file.

PTWLone workingHot workHeightAuto-numbered
03

RAMS

Dynamic risk assessments and method statements by trade. Hazards, controls, residual risk, banksman, PPE. Signed on phone, filed to the job.

By tradeDynamic RAMethod statementsNEC sign-off
04

Toolbox & training

A library of approved toolbox talks. Deliver on phone, capture signatures, file against the operative. Training matrix flags expiring tickets thirty days out.

Talk libraryTraining matrixE-learningExpiry alerts
05

COSHH register

Hazardous substances, suppliers, safety data sheets, technical docs. Linked to jobs, materials and POs. Searchable by name or supplier in three seconds.

SDS storageBy substanceBy supplierTied to job
06

LOLER & PUWER

Lifting equipment register, thorough examination scheduling, defect reporting. Work equipment register, pre-use checks, maintenance log. Out of service when due.

LOLERPUWERPATDefect logAuto-OOS
07

Asbestos

Register, management plan, surveys, work notifications, exposure monitoring, health surveillance. Aligned to Control of Asbestos Regulations 2012.

CAR 2012SurveysNotificationsSurveillance
08

Confined spaces

Register, entry permits, atmospheric testing log, rescue plans. Aligned to Confined Spaces Regulations 1997 and the HSE rescue duty.

RegisterEntry permitsO₂ / CO / H₂SRescue plan
09

Welfare & DSE

CDM 2015 welfare facilities — toilets, washing, changing, drying, rest. DSE assessments for office staff. Manual handling, noise and vibration on top.

CDM welfareDSEManual handlingNoise · vibration
§ 03The regulator's alphabet

One module.
The whole UK
safety statute.

We do not sell a generic safety app with a UK localisation pass. Every regulation below is part of the data model and the workflow, not a section in a help article.

// Group 01

Construction

CDM 2015Construction Phase PlanWelfare facilitiesExcavations & temp worksWork at Height 2005Manual Handling 1992
// Group 02

Reporting

RIDDOR 2013Dangerous occurrencesSpecified injuriesOver-7-day incapacitationOccupational diseases
// Group 03

Substances & environment

COSHH 2002Control of Asbestos 2012Lead at WorkNoise at Work 2005Vibration at Work 2005Confined Spaces 1997
// Group 04

Plant & equipment

LOLER 1998PUWER 1998PAT testingPressure SystemsElectricity at Work 1989Lockout-tagout
// Group 05

People & office

First Aid at Work 1981DSE 1992Health surveillanceDriving licence checksHAVSFire Safety Order 2005
// Group 06

Frameworks & schemes

HSG65ISO 45001SMASCHASConstructionlineAchillesCITBCSCS
§ 04Permits, six shapes

Six permits, one stack.
Numbered automatically.
PDF for the wall.

Every permit type has its own template, its own questions and its own sign-off chain. They share the same numbering, the same audit trail and the same one-click PDF for the cabin wall. The auditor sees a stack, not a folder.

01

Permit to Work

PTW

The general permit. Hazardous activities, controls, fire watch, isolations. Signed on phone, files to the project, PDF on the cabin wall.

Issued bySite manager
02

Lone working

Solo

Where the operative is on their own. Task, environment, control measures, check-in cadence. The system pings them when they are due to confirm.

Pings every30 / 60 / 120 min
03

Hot work

Fire

Welding, grinding, brazing. Fire precautions, equipment checks, isolation procedure, fire watch duration. PDF for client and insurer.

Fire watchmin 60 min
04

Work at Height

Drop

Access equipment, fall protection, supervision, edge protection. Aligned to Work at Height Regulations 2005 — captures the full duty in one form.

Aligned toWAHR 2005
05

Ladder

Task

Task-specific ladder permit — only when ladders are genuinely the right tool. Links to the operative's training and current ticket.

Linkstraining · RAMS
06

Steps & podiums

Task

For the small jobs that go wrong because nobody bothered to plan them. Set-up, correct use, supervision, time-bound.

Time-boundper shift
§ 05A safety Tuesday

One Tuesday.
One module.

A real Tuesday on a 32-person firm running three live sites. Every event below is one tap, one record, one piece of evidence in the file the next time somebody asks.

06:30
Pre-start

22 ops sign today's RAMS at the gate.

QR clock-in pulls today's RAMS by trade. They scroll, sign on phone, the system stamps the record. Locked in two minutes.

RAMS · Workforce
07:42
Hot work

Hot work permit issued for the south gable.

Welder requests on phone. Site manager approves with fire watch and isolations. PTW-04812 generated, PDF posted on the cabin wall.

Permits
09:14
Near-miss

Operative reports a near-miss in twenty seconds.

Photo, what happened, where, what should change. Foreman gets it on phone before the kettle has boiled. Investigation opened automatically.

Incidents · Near-miss
11:00
Toolbox

Toolbox talk on heat stress, twelve signatures.

Five minutes from the library. Signatures on phone, filed against operatives and the site. Ready for the next CDM audit.

Toolbox & training
13:20
Plant

Telehandler LOLER cert flagged 30 days out.

Auto-alert to plant manager. Re-cert booked, calendar entry against the asset, status will go OOS at midnight on the expiry date if not renewed.

LOLER & PUWER
15:40
RIDDOR

Investigation closes — not RIDDOR-reportable.

Investigation lead signs off. Decision recorded with reasoning. Audit trail unfakeable. Lessons-learned entry added to the next safety brief.

Incidents · RIDDOR
17:15
Close

Director closes the day on one screen.

Open permits, RIDDOR rate, expiring tickets, near-miss count, last toolbox. Phone goes in the drawer. The CDM file did not need touching.

Insight
§ 06The questions every SHEQ asks

The questions every
SHEQ lead asks in the demo.

The full list lives at /faqs. These eight are the ones we hear in every safety conversation.

01Do you support RIDDOR reporting properly?+
Yes. The accident form distinguishes RIDDOR-reportable events from non-reportable. The system flags the 10-day or 15-day reporting window depending on category, generates an HSE-aligned PDF and keeps a clean record of the reasoning when you decide an event does not meet the threshold. We do not file to HSE on your behalf — the duty stays with you — but the paperwork is ready.
02Will the lads on site actually fill it in?+
A near-miss takes about 20 seconds on phone. RAMS sign-off is one scroll and a finger swipe. Toolbox talks open at the next pinned topic. The whole module is built around the wet Tuesday on site, not a desk in the office. Adoption per site is reported in the dashboard, so you can see the rollout, not guess at it.
03Can we bring our own RAMS templates?+
Yes — we import your existing templates as part of onboarding. We also ship a library of 40-odd starter RAMS by trade, which most firms pick from on day one and tweak in week two. You always own your own templates and can export them at any time.
04What about subbies on site? Do we pay for them too?+
No. Subbie operatives sign RAMS, toolbox talks and permits on the same module at no extra cost. Their certificates and insurance live on their portal. The audit trail covers everyone on the gate, not just direct employees.
05How does the CDM 2015 file get assembled?+
It is a live picture, not a pre-tender export. Construction Phase Plan, RAMS, RIDDOR records, training matrix, welfare confirmations, plant compliance — they live against the project as it runs. At handover you click once and get a single CDM 2015 file PDF ready to hand to the client or principal designer.
06Is the audit trail tamper-proof?+
Every event — sign-off, edit, status change — writes a signed entry with user, device, IP and timestamp. The audit log is append-only. Permits, RAMS and toolbox talks freeze on submission and require a new version to amend. We keep the chain of custody an HSE inspector or a tribunal would accept.
07Do you cover ISO 45001 and SMAS / CHAS pre-quals?+
Yes. The data model is aligned to ISO 45001 / HSG65 (Plan-Do-Check-Act). For SMAS, CHAS, Constructionline and Achilles re-quals, the certificates, RAMS, training matrix and incident statistics export as the bundle they ask for. Most firms cut the time on a re-qual from a fortnight to an afternoon.
08Is the data secure? UK hosted?+
AWS eu-west-2, London. Data does not leave the UK. AES-256 at rest, TLS 1.3 in transit. ICO registered, GDPR by default, Cyber Essentials Plus. The audit trail is signed, the photos are stored in the same residency, and the export is one click in CSV and PDF.
§ 07 · No card. No lock-in.

If your SHEQ lead
is not happier in week two,
we should not be paid.

14-day free trial

Full module, your real RAMS, your real sites.

RAMS migration

From your folder, your Excel, your Dropbox. Free.

Live in 21 days

First site running, first audit-ready week.

UK data, UK support

UK office, working hours, real phone number.

Cancel by email

One sentence. We export the lot in CSV and PDF.

HSE-aligned exports

Permit PDFs, RAMS, RIDDOR, CDM file. Audit-ready.

Live demos this week 15 minutes · on your numbers Book demo