Free tool

The paperwork is not free.
It is inside the wage bill.

Set your headcount and what a week costs you in admin. This operational cost savings calculator prices those hours at what they actually cost an employer, with National Insurance and the pension on top of the wage. Every assumption opens on a figure we can show you the source for, or one we have deliberately kept small, and every one of them is yours to move. Nothing you type leaves your browser.

Somebody working through a stack of paperwork at a desk with a pen
01Roughly the size of your firm?

Four in the office and twelve on site. Move any slider afterwards and the figures are yours, not ours.

What the manual run costs you a year
£12,526

£1,044 a month, at full employer cost rather than bare salary.

14 weeks of one person’s working year, spent on the run rather than on the work.

550 hours a year, at £21.65 an office hour.

02The office

Worked out in your browser as you move the sliders. No headcount, salaries or figures are sent to Unibuild, stored, or logged.

Where it sits
  • Office hours £6,430 51%
  • Site hours £6,096 49%
03On site
Every assumption, and where it came from

Four hours a week on the run.Sage research published May 2025 found that 49% of small business chief executives and chief operating officers spend four hours every week dealing with payment issues alone. That is one part of the run, so four is a floor rather than an estimate of the whole thing.

Forty per cent of it taken out.Ours, and a judgement rather than a measurement. Some of the run is the job and will not go: somebody still has to read a valuation and sign it. This is the first figure to argue with, and the slider is there for exactly that.

One per cent between an estimate and a measurement.There is no published UK figure for this and we are not going to invent one. It is the least certain number on the page, so it opens at the smallest figure worth modelling: one per cent of a working week is about twenty-four minutes. Set it to zero and the site column disappears. The office column, which is the sourced one, does not depend on it at all.

The full cost of an hour, not the wage.Employer National Insurance at 15% above the £5,000 secondary threshold, and the 3% auto-enrolment minimum on qualifying earnings between £6,240 and £50,270. Divided over 46.4 working weeks, which nets off statutory holiday. All four are editable under the rates below.

The statutory rates

These are legal figures to the pound and they change, usually once a year, so they are inputs rather than constants. Checked 22 September 2026 for the 2026/27 tax year. Employment Allowance is not folded in. It is a per-employer allowance rather than a per-head one, so applying it to a headcount would be wrong for any firm with more than one employee.

How the figure is worked out

Two sums, added together. Neither is clever, and that is the point: you can check both on the back of an envelope.

  1. An office hour costs£21.65Salary plus employer NI plus pension, over 39 hours a week and 46.4 weeks.
  2. Office hours a year3004 people, 4.0 hours a week each, 40% of it taken out, over 46.4 weeks.
  3. A site hour costs£24.33The basic rate with the same on-costs on it.
  4. Site hours a year25012 operatives, 45 hours a week, 1.0% of it.
Against the other column

One monthly fee,
quoted against that.

The figure above is what the manual run costs you now. The fee that replaces it is quoted in writing for your firm, never per seat, and fixed for three years. Put the two side by side and the decision is arithmetic rather than a feeling.

Book a 30-minute demo

Prefer to talk first? +44 7587 557546 or email us.

Ask for a quote

A tailored quote
for your firm.

One flat monthly figure that covers everything, sized to your firm once. Never per seat, fixed for three years, and usually answered the same working day.

Headcount
Areas of interest

Your enquiry carries the page you came from, so we know which of these you were working on. Privacy policy.

The reasoning

Why the paperwork
scales with headcount.

What the two columns count, what makes them grow, and the several things this page deliberately does not put a number on.

The office column

A manual back office does not cost a flat amount. It costs a proportion of every person who touches it. That proportion goes up as the firm grows, because the number of things to reconcile grows faster than the number of people reconciling them. Ten operatives on one site is ten sheets. Thirty operatives across four sites, two of them subcontract, is thirty sheets, four sets of site records and a Friday afternoon spent working out which is which.

That work is real and somebody is paid to do it. The column above prices it at what the hour actually costs: the wage plus employer National Insurance plus the pension, over the working weeks left after statutory holiday. A £34,000 salary is not a £16.75 hour. It is closer to £21.

What it does not assume is that the work disappears. Forty per cent is the opening figure and it is ours, so it is the one to argue with. Somebody still reads a valuation, still signs a certificate, still rings the client. What changes is the part that is transcription: reading a figure off one document and typing it into another, then checking that the typing was right.

The site column

A week written up on Friday afternoon is an estimate. A time written by a server when somebody scanned a poster at the gate is a measurement. The two are rarely the same number.

Nobody has to be doing anything wrong for that to be true. A start nobody wrote down at the time gets rounded to the half hour it felt like. A sheet goes through the wash, or gets left in the van over a bank holiday weekend, and is reconstructed from memory on the Tuesday. A day that ran to ten past four becomes half four because half four is what everybody says. Four sites, thirty people and fifty-two weeks of that is not nothing, and it moves in one direction.

We have not put a figure on it, because there is no published UK figure worth citing and inventing one would be the exact thing this page exists to avoid. One per cent is the opening assumption, which is about twenty-four minutes in a working week. It is the least certain number here and it is deliberately the smaller of the two columns for that reason. Move it to what you believe, or take it to zero and read the office column on its own.

Why it gets worse rather than better

The thing that makes a manual run expensive is not the volume. It is the reconciling. One record in one place is a filing job. The same fact in four places, each with its own version and its own author, is an investigation, and investigations do not get quicker with practice.

That is why a firm can add a fifth site and a sixth office person and find the Friday afternoon has become a Friday and a Monday morning. The sheets went up by a fifth. The number of places a figure could disagree with itself went up by a good deal more.

What this page does not count

Only two things: office hours and site hours. It says nothing about the money that goes missing further down the job, and that is the bigger number in most firms. A variation nobody raised. A day works entry that never made it onto the application. Retention that fell due in March and was released in September because nobody was watching the date. Materials booked to the wrong job, so the job that made money and the job that lost it are both wrong. None of that is here, because putting a figure on it without seeing your records would be a guess dressed up as arithmetic.

It also says nothing about the fee. The comparison is the figure above against a quoted monthly figure, not against nothing.

And it assumes the people whose hours come back are doing something else useful with them. If the office is quiet, an hour saved is an hour saved on paper only. Most contracting firms we have met have the opposite problem, but yours might not.

What actually replaces the run

On a site running QR code clock-in, the hour arrives costed to the job at the moment somebody scans. The time is written by the server rather than read from a handset. Nobody types it twice. The application for payment is built from the same records that produced the timesheets. The day works and the variations are on it because they were recorded when they happened, not because somebody remembered on the twenty-fourth.

That is the mechanism the office column is really about. Not software that does the paperwork faster, but a record that only gets written once.

Not accounting, tax or payroll advice. The statutory figures are employer National Insurance at 15% above a £5,000 secondary threshold, and the 3% auto-enrolment employer minimum on qualifying earnings between £6,240 and £50,270. Both were checked on 22 September 2026 for the 2026/27 tax year, and both are editable on the page. The four-hour opening assumption is from Sage research published in May 2025, which measured financial admin rather than the whole run. Every other figure on this page is yours.

One record, written once

The cost is not the typing. It is the reconciling.

Four records, each with an author
Asked most often

The questions behind
the figure.

Short answers, and the assumption named where there is one.

How do you calculate the cost of manual admin?
Take the hours a week each person spends on it, multiply by the working weeks in a year, then price those hours at full employer cost rather than the bare wage. Full cost means salary plus employer National Insurance plus the workplace pension. A £34,000 office salary works out at about £21 an hour once both are on it, not the £16.75 the salary alone suggests.
What does an employee actually cost an employer in the UK?
Salary plus employer National Insurance at 15% on earnings above the £5,000 secondary threshold, plus the auto-enrolment employer minimum of 3% on qualifying earnings between £6,240 and £50,270. On a £34,000 salary that is roughly £4,350 on top before anything else. Open the statutory rates on this page to change any of them, or to see the hourly figure it produces.
Is this a real saving or a sales figure?
It is arithmetic on figures you set. Two of the defaults are ours and both are labelled: how much of the run a system takes out, and the gap between a recalled week and a recorded one. Move either to zero and the page will tell you so. The only figures we have not made editable are the ones that come from statute, and those are editable too because they change every April.
How much time do small businesses spend on admin?
Sage research published in May 2025 found that 49% of small business chief executives and chief operating officers spend four hours every week on payment issues alone. It described the average small business as working thirteen months for twelve months of pay. That figure covers financial admin. A contractor also has timesheets, certificates, RAMS, purchase orders and valuations on top.
Why do paper timesheets cost more than the hours on them?
Because a sheet filled in after the event is an estimate of a week rather than a record of it. Somebody also has to key it, check it and chase the ones that did not arrive. The keying is the obvious cost. The difference between what was estimated and what was worked is the quieter one, and it only moves in one direction.
Does this include the cost of the software?
No. The figure is what the manual run costs you now, and the honest comparison is that against a quoted monthly fee. Unibuild is one monthly figure that covers everything, quoted per firm rather than per seat, in writing, usually the same working day, and fixed for three years.
We already use spreadsheets rather than paper. Does this still apply?
Partly. A spreadsheet removes some of the arithmetic and none of the reconciling, which is the expensive half. The hours still arrive from somewhere else, the figure still exists in more than one file, and somebody still works out which version is right on a Friday. Set the hours slider lower than a paper firm would and the page will still show you something.
What is not in this calculator?
The money that goes missing further down the job, which is usually the bigger number. Unraised variations, day works that never reached an application, retention released late because nobody watched the date, materials booked to the wrong job. None of that is costed here, because doing it without seeing your records would be a guess dressed up as arithmetic.
Next step

Put the two figures side by side.

Ask for a quote and you get a written monthly figure for your firm, usually the same working day. Hold it against the number above. If the gap does not convince you, nothing we say in a demo will either.