For tree surgery and vegetation management contractors

The right ticket in the tree,
the rescuer on the ground.

Tree surgery and vegetation management software for the contractor working on highways, rail, waterways and utilities. Each gang built from people whose tickets are in date for the task, with a named rescuer for every climb. Ropes, MEWPs and chippers held on their examination and service dates, and nights planned from the depot.

A tree surgeon in a harness and helmet cutting a section from the top of a trunk with a chainsaw
The office side

From the depot gate before dawn
to the client’s audit.

Highway verges, lineside clearance, canal banks, power line corridors or a council’s street trees: the client differs, the office side does not.

  1. Dismantling a tree or clearing a cutting is the part a vegetation contractor already does well. The office side is where it gets heavy. Every task carries its own ticket, every rope its own examination, and every client its own rules for getting a gang onto the network.

  2. Unibuild is bespoke business software for UK trades and specialist contractors: a platform in daily production since 2016, shaped to the way each firm already works. One account carries the labour run, tickets, RAMS, plant, vehicles and timesheets. Gangs clock in with a QR scan at the depot or on site, signal or not.

All of it on one account, with every operative on it and never a charge per seat.

Built for vegetation work

What vegetation management work requires,
and what Unibuild provides.

A vegetation gang is judged before it starts: on its tickets, its kit and its paperwork, by a client who can send it home. Each requirement is followed by what the platform does about it.

Checked before the gang leaves

A gang is a set of tickets, not a headcount

Every task carries its own certificate of competence. A feller on the ground may not hold the ticket to use a saw from a rope and harness. The chipper, the MEWP, the sprayer and the traffic management each want their own.

  • A chainsaw ticket for work on or in a tree
  • A saw from a rope and harness is a ticket of its own
  • Traffic management and Sentinel cards for the network
  • Spraying certificates for invasive weed work
Tickets on the matrix, gangs built from it

The training matrix holds each ticket against the person with its own date, amber before it lapses. The labour run draws from the same record, so competence is visible before anybody is allocated. An expired ticket can be set to stop the allocation outright.

Never one person aloft

Nobody climbs without a rescuer on the ground

HSE says at least two people must be present during all aerial work. One of the ground team must be competent and equipped to do an aerial rescue without delay. Lose that person and the climbing stops.

  • The rescuer is named before anybody climbs
  • One sick call can ground a climbing gang
  • The rescue plan is part of the briefing
  • The rescue kit waits at the foot of the tree
The rescuer is part of the plan

When the rescuer is off, the planner moves the names that have to move, and the operatives affected get a push notification. The replacement is found on the matrix by the ticket the gang has just lost. The RAMS names the rescuer and is signed on the phone before the climb.

Kit that lifts people

Ropes, harnesses, rigging and MEWPs are lifting equipment

HSE lists ropes, harnesses, karabiners, rigging for lowering branches and MEWPs as lifting equipment in tree work. Equipment for lifting people and lifting accessories are thoroughly examined at least every six months.

  • Ropes, harnesses and karabiners examined item by item
  • Checked by the climber before use
  • Kit nicked by a saw comes out of use at once
  • A MEWP brings its own examination and operator
Every item on its own examination date

Assets and inventory holds each item with its serial, examination dates and history, and a QR label opens that record on site. An examination falling due is flagged 30 days out. Raising a repair takes the item out of service until it passes.

Permission before the saw

A protected tree, a nest or a roost stops the job

Work on a tree under a tree preservation order needs the local planning authority’s written consent, and most work in a conservation area needs six weeks’ notice. Nests in use are protected, and damaging a bat roost is an offence even when it is not deliberate.

  • Consents and notice dates held against the job
  • Nesting season shapes the programme
  • An ecologist’s survey can come before the first cut
  • Larger fellings can need a felling licence
The paperwork on the job, the check at the tree

Consents, notices and the ecologist’s report are filed in the job’s own folder, with any dates watched on the reminder page. At the tree, a dynamic risk assessment records what was checked before work started, with photographs.

Somebody else’s network

Every client has its own rules for getting on

A highway needs signing, lighting and guarding set out by people with traffic management tickets. The railway wants a Sentinel card. Near an overhead line, the network operator sets the procedure. Each one wants the RAMS and the evidence of competence before the gang arrives.

  • Traffic management under Sector Scheme 12
  • Sentinel for anyone on or near the line
  • Line owners consulted before work near overhead lines
  • The principal contractor asks for the evidence first
RAMS signed, competence shown

RAMS start from the tree surgery and rope access templates or your own, and the AI RAMS builder drafts one from a prompt for a person to finish. Everybody signs on the phone, including subcontract and agency operatives. The client portal shows the client who is on its site, with their training.

Nights, weekends and away

The day starts at the depot and can end at four in the morning

Gangs meet at the depot, load the plant and drive to a road closure or a possession that only opens at night. Some weeks they work away. The hours, the travel and the rest between shifts all have to add up.

  • Closures and possessions set the hours
  • Travel from the depot is paid by your own rules
  • Consecutive nights are counted, not guessed
  • No signal on a cutting or a canal bank
Scanned at the depot, counted door to door

A QR poster goes on the depot gate as well as on site, and clock-ins work with no signal, syncing when the phone is back in range. A shift across midnight is one shift at the night rate you set. Advanced Fatigue Manager counts nights and rest, door to door, and warns before the next shift.

The week

An ordinary week in a vegetation contractor,
and the record it leaves.

Six entries from the day book of a firm that works on other people’s networks, from the Monday plan to the audit six months later.

An operative in chainsaw trousers, helmet and ear defenders at the infeed of a trailer-mounted wood chipper
Monday, the planner

Next week goes on the labour run: a night closure on a dual carriageway, two climbing gangs on street trees and a weekend on a canal bank. Every name is checked against the tickets its task needs.

Gangs with their tickets
Tuesday, five at the depot

The gang scans the poster on the depot gate and hitches up the chipper. The MEWP’s examination date is checked from its QR label before it leaves the yard.

Day on the record
Wednesday, seven o’clock

A climbing gang’s rescuer rings in sick. The planner swaps in somebody who holds aerial rescue on the matrix, and both operatives get the change on their phones.

Still climbing
Thursday night, the closure

The traffic management goes out first, set by operatives whose cards are on the matrix. The RAMS is read and signed on the phone at the start of the shift, and the night is one shift on the timesheet.

Signed before the first cut
Friday, the yard

A climber’s rope has been amber on the register for a month. It is examined before Monday, or it comes out of use.

Examined in time
Six months on, the audit

The principal contractor asks who was on the closure, with which tickets, signed onto which RAMS. The office answers from the job, by date.

Answered from the record
Your system, your app

Shaped to your firm,
published under your name

The build starts from a working platform rather than an empty screen, so a firm gets the fit of a bespoke system without commissioning one from scratch. See how bespoke software works at Unibuild.

  • Your tickets, your checksThe tickets each task needs, your pre-start questions and your own RAMS templates are set up the way your supervisors already work. Nobody relearns the job to suit the software.
  • Your clients’ paperworkEach client’s documents, RAMS and requirements sit against its own jobs, so a gang going onto a railway carries different paperwork from one going onto a council estate.
  • Your app on the storesYour staff app is published on the App Store and Google Play under your company’s own name and icon. The gang on the verge opens your firm’s app, not ours. How the branded staff app works.
  • Your letterheadThe office portal carries your name, logo and colours, and fifty-eight document types generate on your own letterhead, from the RAMS to the application for payment.
The depot

What a tree surgery and vegetation
management firm holds

The depot, the trailers and the kit on every climber’s harness, and the quirk in each line that breaks ordinary inventory software.

What a UK tree surgery and vegetation management contractor holds, and the tracking quirk in each line
CategoryTypical itemsThe tracking quirk
Climbing and rigging kitRopes, harnesses, karabiners, lanyards, friction devices, pulleys, lowering devicesLifting equipment, so every item has its own six-monthly examination, and a nick from a saw ends its life on the spot
Saws and handheld toolsRear and top-handled chainsaws, pole saws, brush cutters, hedge trimmersEach carries a vibration value, top-handled saws belong with trained climbers, and the smallest go missing first
Chippers and grindersTowed and tracked chippers, stump grindersServiced by hours run, with a protection device tested before use and a trailer checked before every tow
Access and lifting plantMEWPs, tracked access platforms, timber cranesA thorough examination under LOLER, an operator ticket per machine, and hired as often as owned
Tractors and flailsTractors with flails and reach arms, mulchers, mowersServiced by hours rather than dates, and moved between sites on a low loader
Traffic managementSigns, cones, lamps, barriers, vehicle mounted signsOwned or hired, spread across live closures, and the thing that makes a highway job legal
Vehicles and trailersTipper vans, crew cabs, chip boxes, plant trailersMOT, tax, insurance and a daily driver check, and a licence that suits whatever is towed behind
Chemicals and fuelHerbicides for invasive weeds, fuel, chain oilUsed under a spraying certificate and a COSHH assessment, so the record of each treatment matters more than the stock count
Tickets, consents and surveysCertificates of competence, TPO consents, conservation area notices, ecology surveysNot stock, but each one has a date, and a lapsed one stops the work
Regulations

The regimes a tree surgery and
vegetation firm works under

Height, lifting, saws, protected trees, wildlife, the network and tax. The reference version for England, kept factual.

What each regime asks of a tree surgery and vegetation management contractor
RegimeWhat it requires
Work at Height Regulations 2005HSE confirms that tree climbing and work positioning come under these regulations. Work at height is properly planned, including for emergencies and rescue.
LOLER 1998Climbing and rigging kit, including ropes, harnesses and karabiners, and MEWPs are lifting equipment in tree work. Equipment for lifting people and lifting accessories are thoroughly examined at least every six months, unless an examination scheme applies.
PUWER 1998 and its Approved Code of PracticeBefore using a chainsaw on or in a tree, a worker should hold a relevant certificate of competence or national qualification, unless training under adequate supervision.
HSE guidance on aerial workAt least two people are present during all aerial work, and one of the ground team is competent and equipped to do an aerial rescue without delay. Tree work near live overhead power lines is done as the network operator recommends, to its procedures, by qualified and competent people.
BS 3998:2010 Tree work. RecommendationsThe current British Standard of recommendations for tree work, published by BSI in 2010.
Tree preservation orders and conservation areasCutting down, topping, lopping, uprooting, wilfully damaging or wilfully destroying a protected tree needs the local planning authority’s written consent. Most work on trees in a conservation area needs six weeks’ notice. The guidance lists exemptions, including some work by statutory undertakers.
Forestry Act 1967A felling licence from the Forestry Commission is normally needed to fell more than 5 cubic metres of growing trees in a calendar quarter. Exceptions include development with full planning permission and some bodies working under an Act of Parliament, such as highway authorities and Network Rail.
Wildlife and Countryside Act 1981Intentionally taking, damaging or destroying the nest of any wild bird while it is in use or being built is an offence. Japanese knotweed is listed in Schedule 9, so planting it or otherwise causing it to grow in the wild is an offence too.
Conservation of Habitats and Species Regulations 2017Damaging or destroying a breeding site or resting place of a European protected species, which includes every species of bat, is an offence whether or not it is deliberate.
Knotweed as wasteSoil or plant material containing Japanese knotweed may be controlled waste. It goes by a registered waste carrier to an authorised landfill or suitable disposal site.
National Highways Sector SchemesSector Scheme 12 covers temporary traffic management, with Lantra as the administrator and awarding organisation for its training, skills cards and certificates. Sector Scheme 18 covers the establishment and maintenance of a landscape and associated land based activities.
SentinelThe identity card scheme, owned by Network Rail, that checks people working on or near its infrastructure have basic competence and are medically fit.
Construction Industry SchemeTree felling as part of site clearance, and tree or vegetation removal needed before road works, are inside CIS. Routine tree surgery, forestry and landscaping outside a wider construction project are not.
On the record

Questions tree surgery and
vegetation contractors ask

The questions vegetation contractors raise about the week, the gangs and the office, answered on the record.

NightsWe work night closures and possessions. Can it plan and run the night shift?
Yes. Nights go on the same labour run as days, marked as nights, and each operative sees theirs in the app and is told when one moves. Fatigue status beside each name shows a fourth consecutive night while the gang is still being chosen. On the night, a planned name that has not clocked in is flagged.
TicketsCan it stop somebody being sent without the right ticket?
Yes. The labour run draws from the same personnel record as the training matrix, so each person’s chainsaw, climbing, rescue, traffic management and Sentinel cards are visible before they are allocated. An expired ticket can be set to stop the allocation outright, a rule built in at implementation inside the fee.
PlanningWill it stop us double-booking a climber?
It stops the case that is never intentional: planning somebody who is on approved leave or has a day off recorded, because on those days there is nothing to select. It still lets you split one person between two jobs in a day on purpose. If you want the run to refuse a double allocation outright, that is built in at implementation.
Sick callsSomebody rings in sick at seven. How quickly can the gang be fixed?
As quickly as the names can be moved. Everybody looking at the plan sees the new one, and the operatives affected get a push notification, so nobody rings round. If the person off was the gang’s aerial rescuer, the matrix shows who else holds the ticket.
LabourCan subcontract and agency operatives go on the same plan?
Yes, on the same grid as your own people, marked so they read differently at a glance. They scan the same QR poster without a staff record, and their hours are grouped by firm so the office can check the invoice. They sign the RAMS in the app, or through a link that opens in any browser.
Two companiesWe run a sister company. Will the two get mixed up?
No. Staff belong to a business, so somebody employed by one does not appear in the other’s labour run, timesheets or lists unless you give them both. Each company keeps its own records, letterhead and numbering, with a group view above both for the directors. How more than one company works.
PlantCan it plan plant, vans and equipment as well as people?
The labour run plans people. Chippers, MEWPs, tractors and climbing kit are held in assets and inventory against the job they went to, with their examination and service dates. Vans carry their MOT, service and insurance dates in vehicles and fleet, with the daily check done in the app. If you want plant drawn onto the same week as the gangs, that is built in at implementation.
Where they areCan we see where every gang is?
Yes, from the clock-ins. Operatives scan a QR poster at the depot or on site, and a live map shows who is on which site, coloured by job. A location is recorded at the moment of the scan and at no other time, so nothing tracks anybody between scans.
Invasive weedsCan it keep the records for knotweed and other invasive weed treatment?
Yes. Each treatment visit is recorded on the phone against the site, as your own form, with photographs. The operative’s spraying certificate sits on the matrix. COSHH assessments for each product are read and signed on the phone, and waste transfer notes for the arisings are filed against the site.
CISDoes CIS apply to our vegetation work?
Some of it. HMRC treats tree felling as part of site clearance, and vegetation removal needed before road works, as construction operations. Routine tree surgery and landscaping outside a wider construction project are not. Each job carries its own treatment, and deductions from your own subcontractors are taken at the verified rate, by HMRC tax month. What counts as construction work under CIS.
AccountsDoes it replace QuickBooks, Xero or Sage?
No, it works alongside them. Your accounts package stays, and Unibuild runs the gangs, the tickets, the plant and the job up to it. It syncs with QuickBooks, Xero and Sage 50, and other finance systems are connected on request. How the integrations work.
PricingDo changes cost extra once we are live?
No. Changes asked for after go-live are inside the monthly fee. One figure covers everything, with unlimited users and no charge per operative, quoted in writing and fixed for three years. Taking on agency labour for a busy season never changes it. Most firms go live in about two weeks, in phases, and the 14-day trial needs no card. How pricing works.
The marketWhat software do UK tree surgery and vegetation management contractors use?
A common setup is a whiteboard or spreadsheet for the gangs, a folder of certificates, paper RAMS and an accounts package. Unibuild puts the gangs, tickets, RAMS, plant and vehicle dates, timesheets and the client’s evidence on one account.
Other trades

Not quite your
line of work?

The same platform, written for the trade that runs it.
Each of these is a different set of modules
switched on rather than a different product.
Every one is shaped to the firm's own process,
with its own app under its own name.

Other trades
Return slip

See next week’s gangs planned on it.

Half an hour on the working platform, opened at a night closure and a climbing gang with its rescuer. There is nothing to prepare.

To prepare
Nothing. Bring your questions.
Takes
30 minutes
Phone, UK hours
+44 7587 557546
Where it shows first
The first gang that leaves the depot with every ticket in date
Get a quote
One figure per firm · For UK firms

Right, let’s talk numbers.

Five things about your business. We work your fee out properly and put it in writing the same working day.

What we build for you

  • Your own portalIn the browser, built around your firm
  • Your own appiOS and Android, under your name
  • Everyday AI includedHeavier AI at cost, nothing added
  • One platformEverything in one place, set up by us

Would you rather see it running first? Book a 30-minute demo

Quotation request