Advanced Estimating is Unibuild’s estimating and schedule of rates software for UK trades. Prices, fit times and labour costs sit in one dated library, and every job is checked against what it cost.

From the tender won on last year’s rates to the fit time that lives in one head.
Whole price lists moved by a percentage in one action.
Fit, task and strip-out times held on every item in the library.
Everyone prices from one dated library.
Dated labour costs, stamped onto every timesheet line.
Kits and templates carry every item, every time.
Estimate against actual, section by section.
Every supplier’s price on the item, with one default.
Markup is fixed onto each estimate when it is created.
Each contract’s schedule of rates priced from the same library.
Named price lists from one catalogue, each moving on its own.
Who sees purchase prices and labour costs is set per role.
Estimating software prices work before it is won. It holds the materials, plant, labour rates and fit times a contractor works with, and applies markup to them. The result is an estimate, a tender or a priced schedule of rates.
Advanced Estimating is the Unibuild module that does this for UK contractors and trade subcontractors. It keeps those rates in one dated library rather than in spreadsheets. Every price carries the date it was set and the person who set it. A whole price list can be moved by a percentage in a single action.
It was right when it was set. Looking at it since has been nobody's job.
Plant, materials and access equipment in one categorised catalogue, each item carrying its cost, its charge rate, its unit and the time it takes to fit.
A material can hold a price from every supplier who quotes for it, each with that supplier's own part number, and one flagged as the default.
Move an entire price list, or one category inside it, by a percentage from a single box. Creating a list clones the catalogue at current prices, so it starts as a true copy.
Every price list line shows the percentage by which it differs from the base catalogue price, signed and coloured, green above and red below.
Each person's hourly cost is held with an effective-from date, and the rate in force on the day worked is stamped onto the timesheet line as it is saved.
Bundle the materials, plant, sundries, fit times and markup for an assembly you install regularly into one pickable line.
Term maintenance, repairs, frameworks and measured term contracts are usually priced from a schedule of rates. It lists every likely item with a unit and a rate, and the quantities are measured as the work is done. Unibuild prices the schedule, applies your tender and values every order at the agreed rate.
Every order is valued at the rate you tendered, not at whatever a spreadsheet says today.
Bring the workbook you price from.
In the demo we show how its rows map into the library: sections, units, suppliers and schedules.A rate change next month cannot alter a tender you have already issued. That is the difference between a price file and a pricing system.
The tender you issued in March is still the tender you issued in March.
The estimating build-up has priced measured work at a temporary site services contractor since 2016. The catalogue, supplier pricing and dated labour costs have run at a construction contractor since 2023.
See a schedule priced and valued, start to finish.
The demo runs on the platform that has priced measured work every week since 2016.Migration is carried out by Unibuild and included in the fee. This is the shape of it, from the workbook you have today to the first uplift.
The library is set up around the way your estimators already price. Anything else you need is built for you, and changes asked for after go-live are included in the monthly fee. More on how Unibuild is built to each firm.
Most firms pricing measured work already own the catalogue. It sits in two or three workbooks, a folder of supplier emails and the memory of the longest-serving estimator. The migration is built from that file, and years of pricing knowledge come across with it.
Your existing columns are mapped to categories, units of measure and suppliers. The category tree is two levels: deep enough for a stranger to find a fitting, shallow enough to agree in an afternoon. Units come from a maintained list, so each, ea and no. do not survive as three units of the same thing.
Supplier prices and part numbers attach to the item they belong to. A client's schedule of rates is loaded the same way, as that contract's own price list.
Fit times, task times and strip-out times are the fields most often missing, because most businesses never wrote them down. Purchase prices for slow-moving lines and hourly costs for recent starters are often thin too. None of it holds up the import.
The completeness report shows exactly which of those gaps remain. The library is finished week by week, with a figure a director can follow, rather than left at eighty per cent.
Once the catalogue is loaded, lock the negotiated lines and move a whole price list, or one category, by a percentage. The annual review takes five minutes instead of a fortnight of opening workbooks, so it happens.
Same platform, same login. These are the modules that price the work, buy for it, measure it, claim it and collect it.
Estimating software makes a rate quicker to build. These are the decisions that stay with the estimator.
A 30-minute live demo: the library, an estimate built from it, and the job checked against what it cost.
All elevenSolved
Two minutes. A written figure by email, usually the same working day. One flat monthly fee, fixed for three years.