Retention held until the O&M manual turns up.
Filed against the job as each document is issued, so handover is an export.
UK-built · CDM · CIS · MTD
Certificates, permits, orders, applications and site records. Fifty-eight document types, generated from data your people already captured, on your letterhead, and findable years later.

From the retention held for a late manual to the certificate nobody can find.
Filed against the job as each document is issued, so handover is an export.
EIC and Minor Works certificates made on site, finished when saved.
Drawings held on the job, with the current revision on the phone.
Your insurances and accreditations watched, each with its own warning period.
Expired cover takes them off the approved list overnight.
Records attach to the job as the work happens, digital from the start.
Reproduced from the record, identical, from the same reference.
Every send logged, with the attachment and the exact wording.
The client signs on the phone before the engineer leaves site.
Entered once on site, and the certificate is made from that record.
Held against the job, with access that ends when somebody leaves.
The document is generated from the record every time it is asked for. Everything below is a consequence of that.
The PDF reads the live record directly. There is no export step, no stored copy that drifts, and no possibility of a certificate saying something the system does not.
The system issues the numbers, in sequence, with a separate series for each document family.
The engineer signs on the phone screen. Where the form requires it, the client signs underneath before the engineer leaves site.
Each document family carries its own designed A4 artwork, with your logo, colours, accreditation marks and typefaces embedded in the PDF.
Site photographs are attached to the record and printed in the report, captioned and in order, rather than living in a message thread.
Every outbound message is logged with the recipient, the subject, the attachment, the exact content and the send result.

The training matrix exports as a single A3 landscape page, colour coded green, amber and red, with the expired and expiring counts printed at the top. Thirty staff fit on one sheet. It is the document a main contractor asks for at the pre-start meeting and the one a scheme assessor opens first. Producing it is one button rather than a morning in a spreadsheet.
Trades where the record outlives the work by years, because what was installed disappears behind a panel, a ceiling or the ground within days.
Same platform, same login. These are the modules that track what you own, when it is next due, and the certificate that proves it.
Three ways a document register fails, none of which is about storage.
A 30-minute live demo of a certificate made on site, filed to the job and found again years later.
All elevenSolved
Two minutes. A written figure by email, usually the same working day. One flat monthly fee, fixed for three years.