A snagging list records the defects found at an inspection, by location and trade, and tracks each one until it is fixed and signed off. This one runs landscape with a handover sign-off and an end of rectification period sign-off, as an editable PDF and a Word document, free to use and reuse.

The project, area, date, who inspected, who for, and whether it is before handover or in the defects period.
Location by plot, floor and room, what is wrong, the trade responsible and the photograph reference. Then priority A, B or C, the target date, when it was fixed, by whom, and who signed it off.
More rows for a longer inspection. Copy it for as many pages as the walk-round needs.
At handover, when every A and B snag is fixed, and at the end of the rectification period, by the contractor and the client.
There is no statutory snagging list. Practical completion, handover and the defects or rectification period are set by the contract.
Your contractSnags found before practical completion are usually fixed before the client takes the building, or listed with dates where the client agrees to take it with minor items open.
Usual handover practiceDefects that appear after handover are notified during the rectification period, and the contractor returns to put them right.
Your contract’s defects clauseRoom, wall, height and what is wrong. A snag that needs the inspector to point at it costs a second visit.
Before and after. The photograph settles whether it was fixed and whether it was ever there.
In Unibuild each snag is raised with a photograph against the job and the room, and given to the trade. It is closed with a photograph when it is fixed. See project management.
A leave record per person with entitlement, carry-over and every request approved, a team planner a quarter per page, and the 2026 and 2027 bank holidays by nation. As a PDF, Word and an Excel workbook.
One row per person with the expiry of each card and course, a training record per person, and a training needs grid by role. As a PDF, Word and an Excel workbook that turns a date amber at sixty days and red when it passes.
The checks before a subcontractor goes on the approved list: Companies House, CIS verification, insurance, SSIP, the policy, RAMS, competence, right to work, the reverse charge and bank details, then the decision, the register and the review log.
On the platform these stop being sheets. The check, the person, the date, the signature and the action that followed are recorded as the work runs and retrieved by site.
UK-built · CDM · CIS · MTD