A site diary is the site manager’s record of each day: who was on site, the weather, what arrived and what was done. It also records the instructions received and what held the work up. This one runs over two pages a day, as an editable PDF and a Word document, free to use and reuse.

The project, date, site manager, programme week, the weather morning and afternoon, the temperature and hours lost to weather.
Each company on site with its trade and numbers, and each item of plant with whether it was working, standing or broken down.
What arrived and anything short or damaged, who visited or inspected, and the work done by area or activity.
Each instruction with who gave it and how, each delay with its cause and length, health and safety notes, photographs and the signature.
There is no statutory site diary. It is a contemporaneous record, written on the day by the person in charge, which is what gives it weight.
Usual site practiceA claim for more time rests on showing what was delayed, when, why and for how long. The diary is where that is recorded as it happens.
Your contract’s extension of time or compensation event clausesA verbal instruction recorded in the diary and confirmed in writing the same day is the start of a variation that gets paid.
Your contract’s instruction clausesA diary filled in a week later is a reconstruction. One written the same day is evidence.
A complete diary shows nothing happened as clearly as it shows a delay. Gaps are what a dispute looks at.
In Unibuild the clock-ins, deliveries, permits and photographs are already recorded against the job, and the site diary is drafted from the day’s own records. See project management.
A leave record per person with entitlement, carry-over and every request approved, a team planner a quarter per page, and the 2026 and 2027 bank holidays by nation. As a PDF, Word and an Excel workbook.
One row per person with the expiry of each card and course, a training record per person, and a training needs grid by role. As a PDF, Word and an Excel workbook that turns a date amber at sixty days and red when it passes.
The checks before a subcontractor goes on the approved list: Companies House, CIS verification, insurance, SSIP, the policy, RAMS, competence, right to work, the reverse charge and bank details, then the decision, the register and the review log.
On the platform these stop being sheets. The check, the person, the date, the signature and the action that followed are recorded as the work runs and retrieved by site.
UK-built · CDM · CIS · MTD