Risk assessment and method statement for one activity: the sequence of work, a five by five risk matrix, PPE, permits, rescue, and a briefing record signed against the revision.
An Awaab’s Law hazard report form records what an engineer or tradesperson finds in a social rented home, for the landlord to classify. This one covers phase 1 and phase 2 hazards, with an office section, as an editable PDF and a Word document, free to use and reuse.

The landlord, work order, property, resident, engineer and visit times. Then the rule in a box: the engineer records and reports, and the landlord makes the legal classification.
Five checks: looking beyond the job sheet, the history of the problem, who lives there, photographs with consent and any refused access. Then the resident’s own words.
Damp and mould and every emergency hazard, then excess cold and heat, three kinds of fall, electrical, fire and explosions, structural collapse and domestic hygiene. Each row has room for location and extent, with Emergency, Significant and Unsure boxes.
Photographs, readings, the immediate action, whether the home was made safe, outstanding risk, follow on work and detailed notes. Then the report from the property: when, how and to whom.
Completed when the report arrives: the office reference, received and acknowledged times, the landlord told, what it was reported as, escalation, the risk handover, notes, outcome and review.
The five Awaab’s Law timescales and the phase 1 and phase 2 dates, each with the regulation behind it.
Awaab’s Law is an implied term in social tenancies in England, let by housing associations and local authority landlords. The legal duty is the landlord’s.
Landlord and Tenant Act 1985 section 10A, inserted by the Social Housing (Regulation) Act 2023 section 42The landlord investigates and completes the relevant safety work as soon as reasonably practicable, and within 24 hours of becoming aware.
SI 2025/1042, regulation 5The landlord investigates within 10 working days. It sends the tenant a written summary within 3 working days of the investigation concluding, and completes the safety work within 5.
SI 2025/1042, regulations 6, 9 and 11Work to stop the hazard coming back begins within 5 working days. Where that is not possible, it begins as soon as reasonably practicable and within 12 weeks.
SI 2025/1042, regulation 13Phase 1 has been in force since 27 October 2025, for damp and mould and every emergency hazard. Phase 2 is due to come into force on 30 November 2026, under regulations approved by both Houses of Parliament in October 2026.
SI 2025/1042, and the Amendment Regulations 2026, regulation 1(2)The guidance asks contractors to report the hazards they find beyond the job in hand. In some circumstances a landlord may be treated as aware when its contractor becomes aware. The landlord keeps full responsibility.
GOV.UK, Awaab’s Law phase 2 guidance, sections 4 and 8.5Fill it in at the property, whatever the job sheet says. Tick an urgency for each hazard found, write where it is and how far it extends, and photograph it with consent.
Phone a suspected emergency through at once, then send the form before leaving the property. Record when, how and to whom it was reported.
The office logs receipt, tells the landlord, escalates and records who accepted any outstanding risk. The background is in Awaab’s Law for repair contractors.
Risk assessment and method statement for one activity: the sequence of work, a five by five risk matrix, PPE, permits, rescue, and a briefing record signed against the revision.
How one activity on one site will be carried out. Two pages of sequence with the controls at each stage, then plant, PPE, permits, rescue and a briefing record.
One hazardous substance: its hazards from the data sheet, who is exposed and how, controls in regulation 7 order, PPE and RPE, storage, spills, first aid, monitoring and review.
On the platform these stop being sheets. The check, the person, the date, the signature and the action that followed are recorded as the work runs and retrieved by site.
UK-built · CDM · CIS · MTD