Eleven articles on spotting a main contractor in difficulty early enough to act on it, and on what can still be recovered once it is too late to.
Reducing risk, in one place.
Filed accounts tell you about a firm roughly eighteen months after the fact. What tells you now is behaviour: valuations shaved without an explanation, payment slipping a week at a time, and a commercial team that keeps changing.
Three of the articles below run in that order, from the free checks worth doing before you take the order, through the signals that arrive first, to what is worth securing in the first seven days of an administration.
PAS 2035 explained: the retrofit standard, step by stepPAS 2035 is the standard government-funded home retrofit is delivered under. What it requires, who does what, what changed in the 2023 edition, and the evidence an installer is paid on.Read it →
Digital waste tracking: every load reported within two working daysSince 1 October 2026 a permitted site in England or Wales that receives waste reports every load to the government. Who is in scope, what the site records about your load, what stays on paper, and what is planned for carriers from October 2027.Read it →
Awaab's Law phase 2 hazards: what an engineer should reportFrom 30 November 2026, cold homes, falls, fire, electrical, structural and hygiene hazards join damp and mould on Awaab's Law timescales. Each hazard, what an engineer looks for, and the government's own examples of emergency and significant cases.Read it →
The HHSRS hazards list: 21 hazards since June 2026, and what changedThe Housing Health and Safety Rating System went from 29 hazards to 21 on 23 June 2026, and its ten bands became three. The current list, what each old hazard became, category 1 and 2, and where Awaab's Law fits.Read it →
Grey fleet: when staff drive their own cars for workAn office manager visiting a site in their own car is driving for work. What an employer has to check, from business insurance to the MOT, and how to keep the record without chasing people.Read it →
Awaab's Law for repair contractors: timescales, phase 2 and the records to keepAwaab's Law puts statutory clocks on social landlords, and the work that meets them is usually done by their contractors. The timescales, what phase 2 adds, and the record a repairs contractor should hold at every attendance.Read it →
Waste transfer notes, and the duty that follows the skipThe load leaves site and your responsibility does not. What the note has to record, how long you keep it, and the one number on it worth checking before the lorry moves.Read it →
The O&M manual, and why handover takes a fortnightEverything the building owner needs, in one file, assembled at the end from records made over a year. Why that is the wrong way round, and what it costs when the certificates cannot be found.Read it →
The contractor above you has gone into administrationWhat to do in the first seven days, where you rank, and the three things worth securing before anybody tells you to stop.Read it →
Warning signs the firm above you is in troubleThe accounts tell you eighteen months late. What tells you now is behaviour: valuations shaved without explanation, payment slipping a week at a time, and the commercial team turning over.Read it →
Credit checking the firm above you, free, in twenty minutesEverything you need is public and none of it costs anything. Filing history, charges, director record, county court judgments, and the payment data large firms must publish.Read it →Other subjects
Exposure, by customer and by manager.
By the time filed accounts show trouble the money is already at risk. What shows now is the payment pattern. Unibuild ages outstanding application value across current, thirty, sixty, ninety and one hundred and twenty plus day bands against the manager responsible for it.