Risk assessment and method statement for one activity: the sequence of work, a five by five risk matrix, PPE, permits, rescue, and a briefing record signed against the revision.
A site induction form records that one person was inducted on one site: who they are, the card that shows their skills, each topic covered, and both signatures. This one adds the site’s induction register, as an editable PDF and a Word document, free to use and reuse.

Full name, employer, trade, the card type, number and expiry, the emergency contact, and their first language where it is not English.
From emergency procedures, fire points and first aid to welfare, traffic routes, the hazards on this site, asbestos information, RAMS, PPE, permits and reporting, each ticked as it is covered.
Signed by the person inducted and the person who gave the induction, with the date.
One row per person inducted on the site: date, name, employer, trade, card expiry, who inducted them and a signature.
The principal contractor must ensure a suitable site induction is provided, and that steps are taken to prevent access by unauthorised persons.
CDM 2015, regulation 13(4)A contractor gives each worker a suitable site induction where the principal contractor has not. The information also covers the procedures for serious and imminent danger and the risks to their health and safety.
CDM 2015, regulation 15(9)A contractor must not employ or appoint a person on site unless they have, or are obtaining, the skills, knowledge, training and experience for the work. The card check on the form is part of that.
CDM 2015, regulation 15(7)The topics are the frame. The value is in the site-specific hazards, routes and rules, walked where possible.
Look at the expiry and the card type against the work. A card that has lapsed is a training gap.
In Unibuild the induction is signed on the phone, the card and its expiry sit on the person’s training matrix, and the gate shows who is inducted and in date.
Risk assessment and method statement for one activity: the sequence of work, a five by five risk matrix, PPE, permits, rescue, and a briefing record signed against the revision.
How one activity on one site will be carried out. Two pages of sequence with the controls at each stage, then plant, PPE, permits, rescue and a briefing record.
One hazardous substance: its hazards from the data sheet, who is exposed and how, controls in regulation 7 order, PPE and RPE, storage, spills, first aid, monitoring and review.
On the platform these stop being sheets. The check, the person, the date, the signature and the action that followed are recorded as the work runs and retrieved by site.