A scaffold and working platform inspection report, as an editable PDF with every particular Schedule 7 of the Work at Height Regulations requires set out as a column. For the inspection after installation, every seven days and after anything that could affect its safety.
Who the inspection is for, the site, and the scaffold or platform with its location and description.
When to inspect, when to report, when the copy is due and how long to keep it.
Date and time, the reason, any matter that could give rise to a risk, the action taken and the further action needed.
Name and position, signature, whether it is safe to use, and when the copy was given.
Before use after installation or assembly, within every seven days, and after anything liable to jeopardise its safety.
Regulation 12(2), (3) and (4)Working platforms used for construction work from which a person could fall two metres or more.
Regulation 12(4)Prepared before the end of the working period, with the particulars in Schedule 7, and a copy given within 24 hours to the person it was carried out for.
Regulation 12(7)At the site until the construction work is complete, then at an office for three months.
Regulation 12(8)Who it was for, the location and a description, and the date and time. Any risk found, the action taken and further action. The name and position of the person making the report.
Schedule 7Name the scaffold or platform at the top. Where one sheet covers several, use the location column on each row.
Including the ones that find nothing wrong. The report is the evidence that the inspection happened.
To the person the inspection was carried out for, and note the date in the last column.
Risk assessment and method statement for one activity: the sequence of work, a five by five risk matrix, PPE, permits, rescue, and a briefing record signed against the revision.
Welding, cutting, grinding and torch-on work: the precautions checked before it starts, the fire watch during and after, and hand-back.
A general permit for high-risk work: the job, hazards, isolations, precautions, issue, acceptance, shift handover, hand-back and cancellation.
On the platform these stop being sheets. The check, the person, the date, the signature and the action that followed are recorded as the work runs and retrieved by site.