Free download · Editable PDF

Free scaffold inspection report template

A scaffold and working platform inspection report, as an editable PDF with every particular Schedule 7 of the Work at Height Regulations requires set out as a column. For the inspection after installation, every seven days and after anything that could affect its safety.

Editable PDF · 3 pages · 379 KB · Updated 1 November 2026 · Free to use and reuse · Terms

Prefer the links by email? We will send the PDF links to your inbox, nothing else.

Front page of the free scaffold inspection report template from Unibuild
Format
Editable PDF
Pages
3
Built on
WAHR 2005, Schedule 7
Cost
Free, always

What is in the scaffold inspection report template

3 pages

Who and what

Who the inspection is for, the site, and the scaffold or platform with its location and description.

The rules, printed on the form

When to inspect, when to report, when the copy is due and how long to keep it.

One row per inspection

Date and time, the reason, any matter that could give rise to a risk, the action taken and the further action needed.

The inspector

Name and position, signature, whether it is safe to use, and when the copy was given.

Page 2 of the free scaffold inspection report template from Unibuild: the inspection report, with a column for each particular Schedule 7 of the Work at Height Regulations requires
Page 2 of 3: the inspection report, a column for each Schedule 7 particular.

What the Work at Height Regulations require

Checked against the source

When

Before use after installation or assembly, within every seven days, and after anything liable to jeopardise its safety.

Regulation 12(2), (3) and (4)

Which platforms

Working platforms used for construction work from which a person could fall two metres or more.

Regulation 12(4)

The report

Prepared before the end of the working period, with the particulars in Schedule 7, and a copy given within 24 hours to the person it was carried out for.

Regulation 12(7)

Keeping it

At the site until the construction work is complete, then at an office for three months.

Regulation 12(8)

What it contains

Who it was for, the location and a description, and the date and time. Any risk found, the action taken and further action. The name and position of the person making the report.

Schedule 7

How to use it

One sheet per scaffold

Name the scaffold or platform at the top. Where one sheet covers several, use the location column on each row.

Record every inspection

Including the ones that find nothing wrong. The report is the evidence that the inspection happened.

Copy it within 24 hours

To the person the inspection was carried out for, and note the date in the last column.

Download the editable PDF Editable PDF · 3 pages · 379 KB
Is the scaffold inspection report template free and editable?
Yes. It is an editable PDF, free to download, use and reuse, including on paid work. Type into it in any PDF reader, or print it.
How often must a scaffold be inspected?
Before first use after installation or assembly, at least every seven days, and after anything that could affect its safety, such as severe weather. This applies to working platforms for construction work from which a person could fall two metres or more.
Who can inspect a scaffold?
A competent person. The regulations define inspection as the visual or more rigorous inspection by a competent person that is appropriate for safety purposes, including any testing.
What must a scaffold inspection report contain?
The particulars in Schedule 7 of the Work at Height Regulations. Who it was for, the location, a description, and the date and time. Any risk found, the action taken, further action, and the name and position of the person making the report.
How long must scaffold inspection reports be kept?
At the site until the construction work is complete, then at an office for three months.
Does a scaffold tag replace the report?
No. A tag shows the latest result at the scaffold, but for a platform covered by regulation 12(4) the written report with the Schedule 7 particulars is still required.

More free downloads

All 137 downloads →
Form · MHSWR regulation 3

RAMS template

Risk assessment and method statement for one activity: the sequence of work, a five by five risk matrix, PPE, permits, rescue, and a briefing record signed against the revision.

Editable PDF · 8 pages · 643 KB

Assessment · COSHH 2002 regulation 6

COSHH assessment

One hazardous substance: its hazards from the data sheet, who is exposed and how, controls in regulation 7 order, PPE and RPE, storage, spills, first aid, monitoring and review.

Editable PDF · 10 pages · 805 KB

Next step

The same records,
without the paper.

On the platform these stop being sheets. The check, the person, the date, the signature and the action that followed are recorded as the work runs and retrieved by site.

Get a quote
One figure per firm · For UK firms

Right, let’s talk numbers.

Five things about your business. We work your fee out properly and put it in writing the same working day.

What we build for you

  • Your own portalIn the browser, built around your firm
  • Your own appiOS and Android, under your name
  • Everyday AI includedHeavier AI at cost, nothing added
  • One platformEverything in one place, set up by us

Would you rather see it running first? Book a 30-minute demo

Quotation request