RAMS template
Risk assessment and method statement for one activity: the sequence of work, a five by five risk matrix, PPE, permits, rescue, and a briefing record signed against the revision.
UK-built · CDM · CIS · MTD
A temporary works register laid out as HSE suggests, as an editable PDF. Every item has its design check category, designer and checker, design dates, permit to load and permit to dismantle. Landscape, with the BS 5975 categories printed as a key.
The temporary works coordinator, the supervisors and the principal contractor, named at the top.
The four BS 5975 categories, from standard solutions to complex designs checked by another organisation, printed as a key.
Item number, description and location, category, designer and design checker.
When the brief was issued, when the design was received and checked, and when the item is needed on site.
The permit to load and the permit to dismantle, each with its date and who issued it, and the status of the item.
Any temporary support or structure must be designed, installed and maintained to withstand any foreseeable loads, and used only for the purposes it was designed for.
CDM 2015, regulation 19(2)There are no specific legal requirements about how temporary works are managed. BS 5975 is the industry consensus on good practice.
HSE temporary works guidanceAppointing a temporary works coordinator, with the authority to stop the work, is an effective way to make sure designs are prepared, checked and correctly erected.
HSE temporary works guidanceHSE suggests a register set out as a table: design brief, category, designer, checker, design dates, permit to load and permit to dismantle.
HSE Sector Information Minute 02/2010/04Open the register before the first item is designed, and keep it live as items go up and come down.
Each item gets its design check category in consultation with the designer, because the category decides who checks the design.
Record the permit to load before anything bears on the item, and the permit to dismantle before it is struck.
Risk assessment and method statement for one activity: the sequence of work, a five by five risk matrix, PPE, permits, rescue, and a briefing record signed against the revision.
Welding, cutting, grinding and torch-on work: the precautions checked before it starts, the fire watch during and after, and hand-back.
A general permit for high-risk work: the job, hazards, isolations, precautions, issue, acceptance, shift handover, hand-back and cancellation.
On the platform these stop being sheets. The check, the person, the date, the signature and the action that followed are recorded as the work runs and retrieved by site.