Free permit to work template

A general permit to work for high-risk construction and maintenance work, as an editable PDF built on the essential elements in HSE guidance on permit systems. Three pages, from the job and its isolations to issue, shift handover, hand-back and cancellation.

Editable PDF · 3 pages · 264 KB · Updated 1 November 2026 · Free to use and reuse · Terms

Prefer the links by email? We will send the PDF links to your inbox, nothing else.

Front page of the free permit to work template from Unibuild
Format
Editable PDF
Pages
3
Built on
HSE HSG250
Cost
Free, always

What is in the permit to work template

3 pages

The job

Permit number, location, the plant or equipment, the period the permit is valid for, and cross-references to other permits and isolation certificates.

Description and hazards

What is to be done and its limits, and the hazards, including those the work itself creates.

Isolations

Each isolation with its point, method and lock or tag, signed by the person who made it.

Precautions and checks

Precautions and emergency arrangements, atmosphere tests where they are needed, and protective equipment.

Issue and authorisation

The issuer confirms the precautions are in place, with a second signature for high-hazard work.

Acceptance to cancellation

The people working under the permit, shift handovers, hand-back when the work is done, and cancellation once the plant is back in service.

Page 2 of the free permit to work template from Unibuild: precautions, checks and issue
Page 2 of 3: precautions, checks and issue.
Page 3 of the free permit to work template from Unibuild: accepted, handed over, handed back
Page 3 of 3: accepted, handed over, handed back.

What HSE guidance says

Checked against the source

What a permit is

A formal recorded process to control work identified as potentially hazardous, and a means of communication between management, supervisors and the people doing the work.

HSE HSG250, paragraph 9

The essential elements

Thirteen of them, from the permit title and number to hand-back and cancellation. A permit that does not cover them is unlikely to be achieving its purpose.

HSG250, Figure 1 and paragraph 49

Signatures

Dated and timed, and nobody should issue a permit to themself.

HSG250, paragraphs 26 and 49

Shift handover

Work carried over to another shift needs a handover, and the incoming issuer should sign to continue the permit.

HSG250, paragraph 23

Keeping permits

At site for at least 30 days after the work is complete, then archived.

HSG250, paragraph 58

How to use it

Walk the job before issuing

The issuer checks the work site and the isolations in person. A permit issued from the office is a permit nobody checked.

Brief everyone under it

The person accepting the permit explains the work, the hazards and the precautions to everyone who will work under it, and they sign.

Hand it back, then cancel it

Work complete and the area safe first. Isolations come off only when every permit that shares them is signed off.

Download the editable PDF Editable PDF · 3 pages · 264 KB
Is the permit to work template free and editable?
Yes. It is an editable PDF, free to download, use and reuse, including on paid work. Type into it in any PDF reader, or print it.
What is a permit to work?
A formal written system that authorises named people to do specific work, at a specific place, for a set period. The precautions are confirmed before the work starts and signed off when it ends.
When do you need a permit to work?
For work identified as potentially hazardous, where precautions must be in place and checked before anyone starts. Examples are work on isolated plant, in confined spaces, near live services, and hot work.
Who issues a permit to work, and who accepts it?
The issuing authority checks the site and signs that the precautions are in place. The performing authority accepts it for the people doing the work. Nobody should issue a permit to themself.
What happens to a permit at a shift change?
A handover confirms the plant is still safe to work on and the incoming people know the hazards. HSE recommends the incoming issuer signs to continue the permit.
How long should permits to work be kept?
HSE guidance says at site for at least 30 days after the work is complete, then archived so the system can be monitored and audited.

More free downloads

All 137 downloads →
Form · MHSWR regulation 3

RAMS template

Risk assessment and method statement for one activity: the sequence of work, a five by five risk matrix, PPE, permits, rescue, and a briefing record signed against the revision.

Editable PDF · 8 pages · 643 KB

Assessment · COSHH 2002 regulation 6

COSHH assessment

One hazardous substance: its hazards from the data sheet, who is exposed and how, controls in regulation 7 order, PPE and RPE, storage, spills, first aid, monitoring and review.

Editable PDF · 10 pages · 805 KB

Next step

The same records,
without the paper.

On the platform these stop being sheets. The check, the person, the date, the signature and the action that followed are recorded as the work runs and retrieved by site.

Get a quote
One figure per firm · For UK firms

Right, let’s talk numbers.

Five things about your business. We work your fee out properly and put it in writing the same working day.

What we build for you

  • Your own portalIn the browser, built around your firm
  • Your own appiOS and Android, under your name
  • Everyday AI includedHeavier AI at cost, nothing added
  • One platformEverything in one place, set up by us

Would you rather see it running first? Book a 30-minute demo

Quotation request