Toolbox talk attendance sheet
The sign-off sheet on its own: site, date, time, topic and who gave it, twenty rows of names and signatures, the questions raised, the actions and sign-off.
UK-built · CDM · CIS · MTD
A toolbox talk template is the sheet a supervisor writes a short safety briefing on and the record that it was given. This one is two pages: the talk, with space for why it matters, the points to make, do and do not, questions and the close; and the attendance record with signatures. Editable PDF and Word, free to use and reuse.
Site, date, who is giving it, the topic and how long it took. A box for why it matters, in one real reason from this site or this trade.
Six rows, each with a tick box, the point in a few words and what to say. Tick as you go so nothing is missed.
Two short lists the team can repeat back, the questions you will put to them, and the one thing that changes today.
Site, date, time, topic and who gave it, then fifteen rows for name, company, trade and signature.
What was raised and the answer given, and any action with an owner and a date, signed off by the person who gave the talk.
No regulation uses the words toolbox talk, sets a length or an interval. The duty behind it is to give workers the information, instruction, training and supervision necessary for their health and safety.
Health and Safety at Work etc. Act 1974, section 2(2)(c)Employers must provide employees with comprehensible and relevant information on the risks identified by the risk assessment and on the preventive and protective measures. A talk the team cannot follow does not meet this.
Management of Health and Safety at Work Regulations 1999, regulation 10Adequate health and safety training on recruitment and when exposed to new or increased risks, repeated periodically where appropriate. A toolbox talk is how many sites deal with the change on the day.
Management of Health and Safety at Work Regulations 1999, regulation 13(2) and (3)A contractor must provide each worker under their control with appropriate supervision, instructions and information so that construction work can be carried out, so far as is reasonably practicable, without risks to health and safety.
Construction (Design and Management) Regulations 2015, regulation 15(3)No regulation sets what a toolbox talk record contains or how long it is kept. A dated sheet with the topic, the giver and the signatures of those present is what principal contractors and auditors ask for. Keep it with the project records.
HSE INDG345, Health and safety training: a brief guidePick the subject for this week, from the work about to start or what went wrong last week. Fill in why it matters and the points, in words the team uses. Or pick a written talk and skip this step.
Ten minutes at the start of the shift. Tick the points as you make them, ask the questions, and pass the record round on the day, not later in the week.
Keep the sheet with the site records and add a row to the toolbox talk register. Anyone who missed it is given the talk before they next do that work.
The sign-off sheet on its own: site, date, time, topic and who gave it, twenty rows of names and signatures, the questions raised, the actions and sign-off.
One row per talk given on the site, with the date, topic, who gave it, how many attended and the sheet reference, plus a planner for the year and a page of who has had which talk.
Where asbestos is still found, why disturbing it kills, the survey, and stop work if you find something.
On the platform these stop being sheets. The check, the person, the date, the signature and the action that followed are recorded as the work runs and retrieved by site.