Fire door inspection
checklist.
A free fire door inspection checklist: 18 checks in plain English, each with its source. Built on the Home Office guidance for the checks regulation 10 requires.
Published · Last reviewed
What a fire door
check has to cover.
A fire door only works if it closes into its frame and the gaps seal when the fire comes. Most failures are small and visible: a closer that stops short, a seal painted over, a hinge screw missing. These are the checks the Home Office fire door guidance lists, in the order you meet them at the door.
Who has to check, how often, and what the record must show
- Who checks, and how often
- In a block of flats whose top storey is more than 11 metres above ground, the responsible person must check communal fire doors at least every 3 months. For flat entrance doors the duty is best endeavours, at least every 12 months. That is regulation 10 of the Fire Safety (England) Regulations 2022.
- The checks are simple
- The Home Office guidance calls these simple, basic checks. Caretakers, managing agents, housing officers and maintenance staff can make them with appropriate instruction, and no specialist is needed. Repairs are different: they need a competent contractor.
- No label is not a fail
- The guidance says plainly that a door without intumescent strips, smoke seals or any form of certification is not, for that reason alone, unfit for purpose. Whether it is adequate is a question for the fire risk assessment, not for this check.
- The record
- Keep a record of the checks. For flat entrance doors the guidance asks for the steps taken, including every case where access to a flat was not granted.
- What this checklist covers
- 18 checks across four sections: 4 before the door, 4 on the door and its fittings, 7 on gaps, seals and closing, 3 on the record. Each row names its source: the regulation, or the paragraph of the Home Office guidance.
Which door, and how often.
Four checks that decide what the inspection is for and which door the record is about.
The leaf, the frame and what is fixed to them.
What you can see with the door shut. Each of these can stop a fire door doing its job.
Does it close and seal?
The checks that matter most. A fire door that does not close fully into its frame will not hold back fire and smoke.
What happens after the check.
The check is only evidence once it is written down, against the door, with what was done about it.
This browser is not letting the page store anything, so the checklist will count and print correctly but will be empty again if you reload. Save as PDF before you leave.
A starting point for your own review, not legal advice. Always check against the current regulations and HSE guidance. Put your own company in the field above and the PDF carries your name instead of ours. Ticks, notes and site details stay in your browser. Nothing is sent to us.
Or use it as a printable template.
Download the blank fire door inspection checklist as a PDF, or work through the list above on screen and save that instead, dated and carrying the site, the person who prepared it and the score out of 18. Nothing is gated: no email address to hand over, no account to create, no trial to start.
- A blank template
- The PDF above carries all 18 checks, each with the regulation it comes from and a ruled line for the evidence, the owner and the date. Print it and fill it in on site.
- Or a completed record
- Work through it on screen first and Save as PDF produces a dated record of what was in place and what was not, with your evidence notes typed against each check.
- Your ticks stay in your browser
- Ticks, notes and site details are held on this device only. Nothing is sent to us, so you can close the tab and pick it up tomorrow on the same machine.
- Your name on it, not ours
- Put your company in the field above and the downloaded PDF carries your letterhead instead of Unibuild's. It is free: a sheet you hand to a client should be able to have your name on it.
Worth knowing. A checklist filled in once, the week of an audit, is a snapshot. The evidence behind it is either generated as the work runs or reconstructed under pressure, and that is the difference between a template and a record. It is also what the health and safety module is for.
The same checks,
read by role.
These are the same checks above, grouped by whoever normally answers for them.
The responsible person
The frequency, the record and the repairs. Whoever walks the corridors, the duty to check, to act on a fault and to keep the record stays with you.
Caretaker or managing agent
Sections two and three on every round of the communal doors. A closer that stops short of the frame is the finding that matters most.
Fire door contractor
The repair rather than the check. Recorded against the door with photographs, so the next check can see what was done and when.
Fire risk assessor
The questions this checklist leaves open on purpose: whether a door without a label or seals is adequate for where it is.
Residents
Keep fire doors shut when not in use and report any fault or damage straight away. In a block of flats the responsible person has to tell residents this.
Certification body
Samples completed work against the records the firm holds, so each repair needs its door reference, photographs, date and signature.
One record
per door.
On the platform each door has its own label and record, so the check is made standing at the door and the next one is already dated.
What people ask before
they use the checklist.
The questions that come up most often around a fire door inspection checklist, answered against the regulations rather than around them.
How often do fire doors need to be inspected?
What is the maximum gap around a fire door?
How do you test a fire door closer?
Do we need a specialist to carry out the checks?
Is a door without intumescent strips or a label a failed door?
What if a resident will not let us check their flat entrance door?
Can a fire door be held open?
Is this checklist free, and do I have to sign up?
Does Unibuild do this for me?
More checklists
All 11 →Plant and equipment inspection
The walk round, the function checks and the paperwork behind them. PUWER and LOLER, per machine.Project handover
The health and safety file that outlives the job, the technical handover, and closing out properly.RAMS review
What to look for before accepting a method statement: generic copy, missing controls, no rescue plan.Start with the door
nearest the stairs.
Run this over the communal doors on one floor this week, and see whether the closers agree with the record.