Insight · Winning work

Bidding for public sector work
for the first time.

The Procurement Act 2023 changed how this works in February 2025, and one requirement is absolute: register on the Central Digital Platform or you cannot be awarded a contract at all.

Published ·4 min read·Written by Unibuild

Register on the Central Digital Platform through Find a Tender before anything else: a public contract cannot be awarded to a supplier that is not registered on it. The Procurement Act 2023 applies to procurements commenced on or after 24 February 2025, and a good deal of the guidance still circulating describes the regime it replaced.

Register first, or nothing else matters

This is a hard gate and it is the one a first-time bidder is most likely to fail without realising.

The Central Digital Platform went live within the Find a Tender service on 24 February 2025. Suppliers register once, enter their core organisation details, and reuse them across bids rather than retyping the same information into every procurement. Existing Find a Tender registrations did not carry over: firms already on the old service had to register again on the new platform.

The part that matters commercially is that registration is a precondition of award. A contracting authority cannot award a public contract to a supplier that is not registered, which means an unregistered firm can write an excellent bid and still not be capable of winning it.

The best bid in the pile cannot be awarded to a supplier who is not on the platform. Do the registration on a quiet afternoon, not the week a tender closes.

What changed in February 2025

Enough that pre-2025 guidance should be treated with suspicion. The regime is more transparent by design, with more information published at more stages, and the practical effects on a bidder are worth knowing.

Core supplier information is held centrally and reused, which reduces the repetitive part of bidding considerably once you are set up. More notices are published across the life of a procurement, including at award and during contract performance, so there is more visible information about who is winning what. And there is more emphasis on assessing suppliers on past performance, which cuts both ways: a good delivery record becomes an asset, and a poor one becomes visible.

Finding the work

Find a Tender is the central service for higher-value public procurement and is where the notices you care about are published. Contracts Finder continues to carry lower-value opportunities. Many authorities also use their own portals, and a good deal of construction work reaches the market through frameworks rather than through individual notices.

The practical advice for a first-time bidder is narrower than "watch the portals". Pick two or three authorities within your geography whose work matches what you actually do, and follow those, rather than monitoring everything and pricing whatever appears. Public work rewards firms that understand a particular buyer, and pricing a random notice against people who have delivered for that authority for years is not a good use of estimating time.

Frameworks and dynamic markets

Most construction work for public bodies of any size is let through frameworks rather than one-off tenders, and understanding that changes where you spend effort.

A framework is a pre-competed arrangement: you compete once to get on it, then compete or are allocated work within it for its duration. Getting appointed is the significant event; individual call-offs are usually a lighter process. Which means the framework competition is where your effort belongs, and missing one can put you outside a buyer for several years.

Being on a framework is not a guarantee of work, which is the disappointment firms most often report. Some are heavily used and some are barely used, and asking about historic call-off volumes before investing in a bid is a reasonable and rarely-asked question.

Whether it is worth it

An honest answer, because public work suits some contractors and not others.

In favour: the buyer generally pays, which after everything on this site about payment risk is not a small consideration. Frameworks give visibility of forward work. Payment terms are often better than main contractor terms, and there are public sector prompt payment expectations that flow down the chain.

Against: the bidding cost is real and front-loaded, the compliance burden is heavier, the evidence requirements assume a level of documentation many smaller firms do not have ready, and the process is slow. A firm without current accreditation and a tidy compliance file will spend more getting ready than it expects.

The reasonable test is whether you can assemble the evidence pack described in getting on an approved list in a day. If yes, the marginal cost of a public bid is manageable. If assembling it is a project, do that first and bid afterwards.

Where this touches the platform

Public bidding is an evidence exercise more than a writing exercise, and the questions are the ones this platform exists to answer: your health and safety record, accident and RIDDOR history, training and competence records, insurance currency, quality and environmental arrangements, and increasingly your past delivery performance with dates attached. Unibuild holds those against jobs and people with the dates they happened rather than as documents somebody assembles for a submission. It does not write bids, does not register you on anything, and will not tell you whether an opportunity is worth pricing.

Where to start, on Monday

Register on the Central Digital Platform through Find a Tender. It is administrative, it takes an afternoon, and it is a precondition of ever being awarded a public contract. Doing it now rather than during a live tender removes the worst version of this problem.

Then pick two authorities whose work genuinely matches yours, find out what frameworks they use and when those are next competed, and put those dates in the diary. Framework competitions are the events that matter and they come round rarely.

Asked most often

The follow-up questions.

The accreditation you will be asked for is mapped in SSIP, CHAS, Constructionline and what replaced PAS 91.

How do I bid for public sector construction work?+
Register on the Central Digital Platform through Find a Tender first, because a public contract cannot be awarded to an unregistered supplier. Then identify the authorities whose work matches what you do, find out which frameworks they use and when those are competed, and prepare the evidence pack of accreditation, insurance, health and safety records and past performance that public bids require.
What is the Central Digital Platform?+
The central registration and information system for UK public procurement, launched within Find a Tender on 24 February 2025 under the Procurement Act 2023. Suppliers register once and reuse their core organisation details across bids. Registrations on the previous Find a Tender service did not carry over, so firms already on it had to register again.
Do I have to register to win public sector work?+
Yes, in practical terms. A contracting authority cannot award a public contract to a supplier that is not registered on the Central Digital Platform. An unregistered firm can produce an excellent bid and still be incapable of being awarded the contract, which makes registration the first task rather than a later one.
What is a framework and is being on one worth it?+
A pre-competed arrangement where you compete once to be appointed, then compete or are allocated work within it for its duration. Getting on is the significant event; call-offs are usually lighter. It is not a guarantee of work, and usage varies enormously between frameworks, so asking about historic call-off volumes before investing in a bid is worthwhile and rarely done.
Is public sector work worth it for a smaller contractor?+
It depends on your documentation. In favour: the buyer generally pays, frameworks give forward visibility, and payment terms are often better than main contractor terms. Against: bidding cost is front-loaded, compliance is heavier and the process is slow. The test is whether you could assemble your evidence pack in a day; if that is a project, do it before bidding rather than during.
Read next

More from Insights.

Steel reinforcement being fixed in a deep excavationReducing risk··3 min readThe contractor above you has gone into administrationWhat to do in the first seven days, where you rank, and the three things worth securing before anybody tells you to stop.Read it A modern office interiorReducing risk··3 min readWarning signs the firm above you is in troubleThe accounts tell you eighteen months late. What tells you now is behaviour: valuations shaved without explanation, payment slipping a week at a time, and the commercial team turning over.Read it A hand writing on documents at a deskTax and CIS··4 min readGetting gross payment status, and keeping itThree tests, and the one that catches firms out is the compliance test, which now looks at VAT as well. What qualifying takes, and what a single late return costs you.Read it Two colleagues at a desk after reaching an agreementTax and CIS··3 min readVerifying a subcontractor with HMRCThe step that decides the rate you deduct at, and the one firms do after paying rather than before. What verification returns, how long it lasts, and who carries the cost of getting it wrong.Read it A team working together at a shared tableCommercial··4 min readWhat an employee actually costs youSalary is about four fifths of it. Employer National Insurance at 15% above a £5,000 threshold, the pension, and the on-costs of putting somebody on a site make up the rest.Read it Site team on a concrete slab with reinforcement beyondCommercial··4 min readSubcontractor or employee, and why HMRC may disagreePaying somebody through CIS does not make them self-employed. The tests that decide it, the arrangements that fail them, and the declaration you sign every month saying you have considered it.Read it A row of tracked excavatorsSubcontractors··5 min readWhy you cannot find reliable subbiesIt is treated as a hiring problem and it is a retention problem. The firms that get the good trades are the ones that are straightforward to work for, and most of that is commercial rather than social.Read it Operatives working among steel reinforcement on a slabPlant and assets··5 min readKnowing what plant you own and where it isThe losses are quiet: kit that walks between sites, kit hired because nobody could find the one you have, and kit written off that is still in a container. What a register has to do to stop it.Read it An electrician testing at a distribution boardPlant and assets··4 min readOff-hire, and the charges that keep runningHire runs until the item is off-hired, not until you finish with it. A preventable loss that every contractor recognises and almost nobody has a process for.Read it Tower cranes above a building under constructionHealth and safety··4 min readGateway 2, and what it does to a programmeApproval has to be granted before construction starts, and the wait has improved sharply: a median of 22 weeks at June 2026 against 43 a year earlier. What that means if you are not the applicant.Read it Two people working through a drawing at a desk with laptopsChoosing software··5 min readWhere the office hours actually goNot in the work. In assembling positions from four places, retyping what site already recorded, and chasing paperwork that exists but cannot be found. How to measure your own before deciding anything.Read it Technical drawings and tools on a workbenchCommercial··6 min readHow to price a construction job without guessingA method rather than a feeling: measure, build the rate from labour, plant and materials, add the site costs that carry the job, recover overhead, then decide margin. The order matters and the last two steps are where firms lose money.Read it A hand writing on documents at a deskCommercial··5 min readHow to tell whether you are underpricingYou will not find it in the jobs that went wrong. It is in the ones that went fine and returned less than they should have. A test you can run on last year in an afternoon.Read it Site team on a concrete slab with reinforcement beyondCommercial··5 min readDay rate or fixed price, and when each one costs youNot a preference. A decision about who carries the risk of the unknown, and there is a right answer for most jobs once you are honest about what you do not know.Read it Tower cranes above a building under constructionCommercial··5 min readMaterials went up after you quotedThe average tells you nothing. Structural steel rose 13.1% in the year to May 2026 while cement fell 5.0%, and a quote is only exposed to what it is built from. What protects a price, and what does not.Read it Two colleagues at a desk after reaching an agreementCommercial··5 min readPreliminaries, the cost most firms forget to priceEverything that makes the job possible and appears on no drawing: supervision, welfare, access, plant standing, insurance, and the time before and after. Why it gets under-priced and how to stop.Read it Two colleagues at a desk after reaching an agreementWinning work··5 min readGetting on a main contractor's approved listThe application is the easy half. What decides it is the evidence pack behind it, and what gets a firm quietly dropped afterwards is rarely the work.Read it A hand writing on documents at a deskWinning work··6 min readSSIP, CHAS, Constructionline and what replaced PAS 91An acronym map with the money attached. Which schemes are health and safety only, which are full pre-qualification, what mutual recognition actually saves you, and why PAS 91 is no longer the answer.Read it A technical drawing being marked up at a deskTax and CIS··5 min readWhat counts as construction work under CISThe included list is wider than most firms assume and the excluded list catches out exactly the trades that read it. Plus the mixed contract rule, which decides more cases than either list.Read it Two people working through a drawing at a desk with laptopsTax and CIS··5 min readCIS monthly returns, the date and the penaltiesThe nineteenth, every month, whether or not you paid anybody. What the penalty ladder actually looks like, and the declaration on the return that carries more weight than the figures.Read it A modern office interiorTax and CIS··5 min readEnd user statements, and what they switch offIt has to be in writing, it comes from your customer rather than from you, and without it the reverse charge applies by default. What the statement says and where it belongs.Read it Site operative in a hard hat and safety glassesHealth and safety··5 min readThe certificates that expire without anybody noticingInsurance, cards, plant inspections, training and first aid all run out on different dates, and nothing about your file changes on the day one of them does. What has to watch them.Read it Site team on a concrete slab with reinforcement beyondHealth and safety··5 min readWhen an HSE inspector turns up on siteWhat they can do, what they ask to see and in what order, what a Notification of Contravention means, and what the visit can cost you at £188 an hour.Read it Operatives working among steel reinforcement on a slabHealth and safety··5 min readRIDDOR, what has to be reported and by whenThree different clocks run on three different categories, and the one firms miss is the fifteen days, which counts from the accident rather than from the day you realised.Read it Tower cranes above a building under constructionHealth and safety··5 min readWhen a job becomes notifiable, and who tells the HSETwo thresholds, either of which triggers it, and a duty that sits with the client rather than with you. How to work out whether your job crosses them.Read it An electrician testing at a distribution boardHealth and safety··5 min readWhich CSCS card, and who actually checks itSeven colours, different qualifications behind each, and a five year clock on most of them. What each card is for, and why it is not a legal requirement but still stops you at the gate.Read it A team working together at a shared tableChoosing software··6 min readWhy WhatsApp fails as a site recordIt is the system most sites actually run on, and it works right up until somebody asks a question about March. Six specific failures, and the one that arrives when a person leaves.Read it Two people working through a drawing at a desk with laptopsChoosing software··5 min readWhere spreadsheet job costing breaksNot when it gets complicated. When two people open it, when committed cost is not in it, and when the true position is a week old by the time anybody has assembled it.Read it Two colleagues at a desk after reaching an agreementChoosing software··6 min readChoosing construction management software, and what to actually compareEvery product demos well. A buyer's checklist written to be useful even if you buy from somebody else, including the five questions vendors answer badly.Read it A hand writing on documents at a deskChoosing software··5 min readXero for contractors, and where the accounts package stopsIt handles CIS properly and it is a good ledger. What it is not built to hold is the job: the measured schedule, the valuation, the retention and the cost you have committed but not yet been invoiced for.Read it A technical drawing being marked up at a deskChoosing software··5 min readDocument control, and the revision everybody was working toBuilding to a superseded drawing is expensive, common, and almost never anybody being careless. What has to be true for the right revision to reach the person holding the tool.Read it Technical drawings and tools on a workbenchGetting paid··5 min readAn application for payment that does not come back rejectedFour reasons account for most rejections, and none of them is the price. What the document has to contain, what has to sit behind it, and the date that matters more than the total.Read it Steel reinforcement being fixed in a deep excavationGetting paid··5 min readGetting paid for variations you were told to get on withThe entitlement is rarely the problem. The evidence is. What stands up when the instruction was verbal, and the one email that changes the argument.Read it A modern office interiorGetting paid··5 min readWhen a missing notice hands you the moneyAn adjudication that asks nothing about what the work was worth, only whether the notices were served. What it wins, and the second adjudication that usually follows it.Read it A row of tracked excavatorsGetting paid··5 min readStopping work for non-payment, without breaching your contractA statutory right with narrow conditions and real leverage. What has to be true before you can use it, what the notice must say, and what walking off without one costs.Read it A hand writing on documents at a deskGetting paid··5 min readCharging interest on a late payment, and the sums nobody claimsStatutory interest runs at eight per cent above base, and a fixed compensation sum sits on top of it that almost nobody asks for. Both are automatic entitlements rather than favours.Read it Site operative in a hard hat and safety glassesGetting paid··6 min readWhat the Construction Act actually gives youSix rights that apply whether or not your contract mentions them, and whether or not anything was ever signed. What each one is, and where it stops.Read it Site team on a concrete slab with reinforcement beyondSubcontractors··6 min readVetting a subcontractor before you instruct themNine checks, what each one is actually protecting you from, and the two that firms skip and then discover matter. Most of it is twenty minutes and free.Read it Two people working through a drawing at a desk with laptopsReducing risk··6 min readCredit checking the firm above you, free, in twenty minutesEverything you need is public and none of it costs anything. Filing history, charges, director record, county court judgments, and the payment data large firms are now compelled to publish, including what they do with retention.Read it A technical drawing being marked up at a deskCommercial··5 min readQuote or estimate, and which one binds youOne is an offer that becomes a fixed price the moment it is accepted. The other is an informed guess. Almost nobody says which they are sending, and the word at the top of the page is not what decides it.Read it Tower cranes above a building under constructionHealth and safety··5 min readWhen you become the principal contractor without being toldThe duty attaches to a role, not to the size of the firm, and a second contractor arriving on site is enough to trigger it. What lands on you, and what happens when the client never appointed anybody.Read it A team working together at a shared tableChoosing software··6 min readWhat construction software actually costsThe monthly figure is the part everyone compares and the smallest part of the bill. Setup, migration, the annual uplift, and the licences you ration because they are charged per person.Read it Two colleagues at a desk after reaching an agreementTax and CIS··8 min readThe VAT reverse charge, and who accounts for the VATFive years in and it still catches firms out on every second invoice. When it applies, when it does not, the written statement that switches it off, and the wording your invoice has to carry.Read it A modern office interiorTax and CIS··7 min readReclaiming CIS deductions, and the money sitting with HMRCA limited company gets its deductions back through payroll rather than through its Corporation Tax return, and only if somebody files the right submission every month. Where the money goes, and how to stop it piling up.Read it Technical drawings and tools on a workbenchCommercial··7 min readThe gap between doing the work and having the moneyWages go out weekly, materials at thirty days, and the money comes back at sixty. Retention, CIS and the reverse charge each take a slice on the way. Why a job that made a profit can still run a firm out of cash.Read it Operatives working among steel reinforcement on a slabGetting paid··8 min readWhen the contractor above you will not payThe remedies run in a fixed order and each one costs more than the last. What to do first, what every step is worth, and the rung most disputes never get past.Read it A hand writing on documents at a deskGetting paid··8 min readPay less notices, and the timetable behind themFour dates govern every interim payment in UK construction, and statute sets them rather than goodwill. What each one is, how to work them out on your own job, and what a late notice costs the party that served it.Read it An electrician testing at a distribution boardGetting paid··6 min readPay when paid, and why it does not bind youMaking your money conditional on somebody else being paid has been ineffective in UK construction since 1998. The clause is still written into contracts, still quoted down the phone, and still works on firms that do not know.Read it Site team reviewing a risk assessment and method statement on a UK construction siteHealth and safety··7 min readRAMS that hold upWhat an inspector is actually looking for in a risk assessment and method statement, and the difference between a document that exists and one that is doing its job.Read it Retention and the money that goes missing after practical completionCommercial··6 min readRetention, and the money that goes missing after practical completionWhere cash quietly disappears between the last valuation and the release of the second half of retention, and the four dates that decide whether you ever see it.Read it Why field rollouts stall in week threeImplementation··6 min readWhy field rollouts stall in week threeMost site software is not rejected. It is quietly outlived by the paper route nobody switched off. What the firms that got it to stick did differently.Read it