Skip to content
Field journal

Guides for the people
who have to produce it.

Short, practical writing on the regulations and the paperwork a UK contractor actually meets. No product pitch in the body, no invented statistics, and a plain note wherever we are describing something Unibuild does not do.

Being written

What is next.

If one of these would be useful sooner, say so and we will move it up. We would rather write the thing somebody is actually waiting for.

RAMS that hold up
What an inspector is actually looking for in a risk assessment and method statement, and the difference between a document that exists and one that is doing its job.
Permits to work
Hot work, confined space entry, work at height and lone working. When a permit is the right control and when it is paperwork for its own sake.
Retention and the final account
Where money quietly goes missing between the last valuation and the release of the second half of retention.
Getting a field app adopted
Why most rollouts stall in week three, and what the firms that got it to stick did differently.