Audit Tuesday.
RAMS folder lost
in a van. Panic.
CDM 2015 is not a box-ticking exercise when something goes wrong. Pre-construction information across Dropbox and one director's email. RAMS in a paper folder in a foreman's van. The H&S file scrambled together in the last week of every job. The platform turns it into a live picture that writes itself.
Eight specific moments
that add up to a
£127k exposure.
The HSE letter does not read your folder. It reads your evidence chain. When the chain runs across Dropbox, paper, an inbox and a phone, the letter is bad news.
The CDM 2015 file
is a live picture,
not a tender pack.
Pre-construction info
Drawings, surveys, hazards, welfare arrangements — pinned to the project from kick-off. The principal designer can see the full file before the first ground is broken.
Aligned toCDM 2015RAMS at the gate
Every operative signs today's RAMS at the QR clock-in. Filed against the project, the trade and the operative. The audit trail covers everyone, every shift.
ModuleH&SRIDDOR-ready
Accident form distinguishes RIDDOR-reportable events. Window flagged. HSE-aligned PDF generated. Decision recorded with reasoning, even if you don't report.
Aligned toRIDDOR 2013Plant compliance
LOLER and PUWER certs tracked, expiry alerts 30 days out, equipment status auto-OOS at midnight on the expiry date if not renewed. The expired telehandler problem disappears.
ModulePlantSubbie compliance
Insurance, RAMS, training, accreditation. Per subbie, per project, per package. Cover never lapses — gate access blocked at QR until renewed.
ModuleSubcontractor portalOne-click H&S file
At handover or audit, click once: a single PDF with CPP, RAMS history, RIDDOR records, training matrix, welfare confirmations, plant compliance. The auditor reads it on the first pass.
Cuts2 wks → 1 hr