Skip to content
Pain · CDM 2015 stress

Audit Tuesday.
RAMS folder lost
in a van. Panic.

CDM 2015 is not a box-ticking exercise when something goes wrong. Pre-construction information across Dropbox and one director's email. RAMS in a paper folder in a foreman's van. The H&S file scrambled together in the last week of every job. The platform turns it into a live picture that writes itself.

CDM 2015 baseline RIDDOR-ready HSE-aligned Audit trail unfakeable
§ 01Where CDM stress builds

Eight specific moments
that add up to a
£127k exposure.

The HSE letter does not read your folder. It reads your evidence chain. When the chain runs across Dropbox, paper, an inbox and a phone, the letter is bad news.

Tender week
Client asks for the CDM 2015 file. It lives in three places and a paper folder.
Bid risk
HSE letter
10 working days to produce the file. CPP, RAMS, RIDDOR, training matrix — all separate.
£127k exposure
Site walk
Foreman has the printed RAMS in a folder. Three trades have not signed it. Nobody knew.
Audit gap
Plant yard
LOLER cert for the telehandler in a box. Expired last Tuesday. Nobody knew.
HSE exposure
Near-miss
Reported in WhatsApp. Lost in scroll. No investigation. No learning. No record.
Safety culture
RIDDOR window
10-day window closing. Office manager unsure if the event qualifies. £20k fine risk.
£20k risk
Subbie evidence
Subbie's PL insurance lapsed three weeks ago. Nobody noticed. Now they're on site.
Liability gap
Toolbox talks
Talks delivered. Signatures on paper. Paper lost in van. No record. No evidence.
Evidence gap
§ 02What the platform does

The CDM 2015 file
is a live picture,
not a tender pack.

01

Pre-construction info

Drawings, surveys, hazards, welfare arrangements — pinned to the project from kick-off. The principal designer can see the full file before the first ground is broken.

Aligned toCDM 2015
02

RAMS at the gate

Every operative signs today's RAMS at the QR clock-in. Filed against the project, the trade and the operative. The audit trail covers everyone, every shift.

ModuleH&S
03

RIDDOR-ready

Accident form distinguishes RIDDOR-reportable events. Window flagged. HSE-aligned PDF generated. Decision recorded with reasoning, even if you don't report.

Aligned toRIDDOR 2013
04

Plant compliance

LOLER and PUWER certs tracked, expiry alerts 30 days out, equipment status auto-OOS at midnight on the expiry date if not renewed. The expired telehandler problem disappears.

ModulePlant
05

Subbie compliance

Insurance, RAMS, training, accreditation. Per subbie, per project, per package. Cover never lapses — gate access blocked at QR until renewed.

ModuleSubcontractor portal
06

One-click H&S file

At handover or audit, click once: a single PDF with CPP, RAMS history, RIDDOR records, training matrix, welfare confirmations, plant compliance. The auditor reads it on the first pass.

Cuts2 wks → 1 hr
Next step

CDM 2015 file.
One click. Live.

Live demos this week 15 minutes · on your numbers Book demo