CDM 2015 asks for competent people, cooperation and information that flows. Software cannot replace judgement — but it can stop critical documents living only in somebody's inbox. Unibuild keeps pre-construction info, welfare, coordination and the H&S file in good order so duties are visible and evidence holds up.

Last updated · 10 May 2026 HSE-aligned Audit trail unfakeable One-click H&S file
§ 01What CDM 2015 asks for

Six duties.
Every UK project,
every time.

The regulations ask for the same six things on every job over 30 days or 500 person-days. We mapped them to records the platform already keeps, so duty-holders can produce evidence on demand.

01

Pre-construction info

Drawings, surveys, hazards, welfare arrangements pinned to the project from kick-off. Principal designer can read the file before the first ground is broken.

Reg4 · 11
02

Construction Phase Plan

Live CPP — phases, hazards, controls, RAMS by trade, welfare. Evolves with the job. Auditor reads the same version the foreman is working from.

Reg12 · 13
03

Welfare

Toilets, washing, changing, drying, rest. Posted on the project at induction. Confirmed at audit. Schedule 2 covered without a folder being touched.

RegSchedule 2
04

Roles & cooperation

Principal designer, principal contractor, designers, contractors. Each lane defined on the project record. Sign-off chain unfakeable.

Reg5 · 8
05

Site induction

Operative reads, signs, filed against the project. Subbies the same. The "did everyone get inducted" question is one screen, not a guess.

Reg13 (4)
06

H&S file

Builds itself as the job runs — drawings as-built, RAMS history, RIDDOR, surveys, plant compliance. One-click PDF at handover.

Reg12 (5)